Starting serial execution
 keyword> Distance tolerance for distinguising atoms in the same orbit=        0.01000
 keyword> Maximum number of secondary sets in perm.allow file= 70
 keyword> Number of groups of permutable atoms=     1
 keyword> group      1 contains    150 atoms with      0 additional atom sets:
     1     2     3     4     5     6     7     8     9    10    11    12    13    14    15    16    17    18    19    20    21    22
    23    24    25    26    27    28    29    30    31    32    33    34    35    36    37    38    39    40    41    42    43    44
    45    46    47    48    49    50    51    52    53    54    55    56    57    58    59    60    61    62    63    64    65    66
    67    68    69    70    71    72    73    74    75    76    77    78    79    80    81    82    83    84    85    86    87    88
    89    90    91    92    93    94    95    96    97    98    99   100   101   102   103   104   105   106   107   108   109   110
   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132
   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150 
keyword> WARNING - temperature unspecified for NEWRESTART. Default for high T MD is 1000K
io1> Initial coordinates:
 LA        1.1575520975       -0.5344377684       -1.1778168285
 LA       -0.4821376609        0.1162495339        1.3501905147
 LA       -1.0594479492       -0.0878318216       -0.1327828078
 LA       -0.7992105883        0.4225524898       -1.1263188840
 LA        0.0526049726       -0.6776997021       -1.3745267519
 LA       -0.6014176502       -1.6908074062        0.5313471403
 LA       -0.1025760117       -0.4707227163        0.7858620376
 LA        0.7326361554       -1.4653778147        0.2220657474
 LA        1.2738441228       -0.6593797528        0.5718261962
 LA        1.1275749905       -0.9470714983        0.4313843547
 LA       -0.4235060404        0.1357568363       -0.6361920269
 LA        1.6508621922        1.0148572678        0.1199145555
 LA       -1.2534005767       -0.7539885242        1.4110288694
 LA        1.1605460074        0.8226920980       -1.1676806319
 LA        0.8627982572       -1.1823775115        1.3321307097
 LA        1.2022902015        0.5592621355       -0.0774486533
 LA       -1.5708629608        1.4215767351       -0.7684312602
 LA        0.9606565194       -0.7032059305        0.6999060304
 LA       -1.0727303854        0.7866963255        0.6320991859
 LA        1.7132711850        0.5004180555        0.3659590412
 LA        1.1827187011       -0.8533684217        0.0351692235
 LA        0.3209482978        1.5233970548       -0.5302536389
 LA       -1.5753731377       -0.5821464876       -0.7015708621
 LA        1.4242162764       -1.5130561544        1.2693199942
 LA       -0.8517533590        0.9813004494       -0.3124635651
 LA        1.4537064585       -0.0591443074        1.3361806762
 LA       -0.4771968223       -0.5870351683        1.6794005868
 LA       -1.1987656808        0.3988657423        0.6206758516
 LA        0.6691699398       -0.1392028411        0.5713958668
 LA       -1.3918901325        1.2649992547        1.4111877499
 LA       -1.2903253759       -1.2369176427        0.0116068040
 LA        0.1288637862        0.0029092812        1.2406577298
 LA        1.2813941248       -0.0854592722       -1.2224825786
 LA        1.0858646972        1.2890743620        1.2881824139
 LA        0.2129084867        1.3068440126       -0.6780195375
 LA        0.1857021724        1.1537224060        0.1873672444
 LA        0.5161054385       -0.4398031874        1.4199469141
 LA        0.0713149739        1.7230799098       -1.6281415824
 LA       -1.4130728098        0.1587891611        1.3341831253
 LA       -1.4283636321       -0.8067144815       -0.8712461048
 LA       -1.7075563255       -0.7181374869       -0.2833714295
 LA        0.3383569064       -0.8010287836       -0.0747636855
 LA       -0.1532636520       -0.3494999746        0.9381410812
 LA       -1.2722362738        1.3894030080       -0.9826261676
 LA       -1.3135606398       -1.1244634389       -0.7086367912
 LA       -1.6194559110       -0.5386733041        0.3843469504
 LA       -1.6740791023        1.3618827879        1.4609373962
 LA       -0.8303172349       -0.8141534943       -0.6348173948
 LA        0.8517584241       -0.2940800759       -0.7491056910
 LA        0.1059101805        1.7236399467       -1.0652225433
 LA        0.4225702371        0.1838497148        0.0434308809
 LA        0.3761957515       -1.7184113089       -0.0164841107
 LA       -0.2763995553       -1.4229876361       -1.6255991077
 LA        0.0473698710        0.2024258919       -1.1237031939
 LA        0.5313595451        0.4860317698        0.0439826023
 LA       -1.6556102527        1.3503384407        0.0796802001
 LA       -0.4355850974        1.1484594544        0.0736608829
 LA       -1.2460898955        1.2348958002       -0.0640317653
 LA       -0.5979489733       -1.2038312860       -0.7015609319
 LA        0.0043507068       -0.3450709624       -1.3747967764
 LA        0.7296632996       -0.4192498474        1.2481545142
 LA        0.6673154546        0.4615130510        1.3619532271
 LA       -1.6130960510       -0.5158266129        0.9254915521
 LA       -0.6516483853       -0.2869697221       -0.3696085384
 LA        0.5263311975        0.6124207838        1.0702656764
 LA       -0.2757559115       -0.2096367965       -0.0870604914
 LA       -1.1901844365        0.1529367157        1.2867578580
 LA       -1.2670879812       -1.5056553382       -0.8765082305
 LA        0.9156245170        0.5501917950        1.3635569869
 LA        1.1102140731        0.9202634998        1.7014508060
 LA        0.7365486666        1.3490306118       -0.6759061613
 LA        1.3862877269       -0.7851389761        0.0570210220
 LA       -1.0706705382       -1.5257332401        1.7166267934
 LA       -1.7016013564       -1.2320193044       -1.5016909191
 LA        0.5250906106        0.0120355477        1.0586981748
 LA       -1.1940071642        1.5432158158       -1.6487139796
 LA       -0.7375781796       -1.0677196674       -1.5497739319
 LA       -0.4704291615       -1.1558357628        1.0913346900
 LA       -1.1656575279        1.4607762929       -1.4222012234
 LA        1.0994230474        1.1790082643        1.1139125487
 LA        1.5230779372        1.0759775872       -1.2521973040
 LA       -1.2627759040       -0.2059669324       -1.1870640468
 LA        0.9306593632       -1.7114379313        1.3448764117
 LA       -1.1180832765        1.6677463682       -1.4230317802
 LA       -0.9540199003       -1.3330224190       -0.8664616932
 LA       -0.5681406189       -1.7070979492        0.9311632821
 LA       -1.6970596499        1.5937397846        1.4488202282
 LA        1.1731250297       -1.3400452122       -1.6753303727
 LA        1.6018979956        0.1018588929       -0.7076523497
 LA        0.0748131043       -1.0815659523       -0.0850415540
 LA       -1.2242322996       -1.0487188810        0.4354625810
 LA        0.4851423544       -0.7043769687        1.7263156489
 LA        1.3141762496       -0.7498145927       -0.2409192547
 LA       -0.1377525402       -0.4692147100        0.6656181883
 LA        0.8089375677        1.0251096832        1.1513218097
 LA       -0.5740048722       -0.5294034218       -0.3811686456
 LA       -0.3742962157       -0.6634519413        0.3542284860
 LA        0.4241785264        1.4901735057        0.6762148744
 LA       -1.1775403483        0.2678159204        0.7501446519
 LA        1.3105118587        1.2236999772        0.6073187225
 LA        0.1248628353       -0.3559169495        0.3063221074
 LA        0.9790662554       -0.7431097976        0.7006587472
 LA        0.6838832053       -0.3407595143       -0.7410280204
 LA        0.3705666653       -0.1085669352        0.2367984523
 LA       -1.0126324152        1.3159745603        0.1358718147
 LA       -1.2492807115        0.1354929931        0.6962290171
 LA       -0.9851873785        1.2644896206        0.7546251494
 LA       -0.9419684401       -1.0596463263       -0.7191922820
 LA       -1.1381195783        1.0147409602       -0.1817675408
 LA       -1.6685571048        1.6702732798        0.4048741163
 LA        0.3933659443        0.1992411863       -0.2871681751
 LA       -1.2725130347       -0.2141660467       -0.1131671617
 LA       -1.4609397933        0.2483295237       -1.5366857353
 LA        1.3805687057        0.0136447275       -1.1280176520
 LA        0.5755023224        0.9088736147        1.5508718064
 LA       -0.7964758855        1.1256332253       -1.3600455806
 LA        0.2231110978        0.0592393592        1.0223167621
 LA        0.6958228051        0.8386497444       -0.5081069549
 LA       -1.1056169760        0.1338094608       -0.9670489930
 LA       -0.2432185243        0.3723532053       -1.1396432962
 LA        0.5836930276        0.7336596096       -1.5123682149
 LA        1.1231004308        0.4531410577       -1.6284945428
 LA       -0.2086993462       -0.4628576859       -1.0919394695
 LA       -0.8015456396        1.0363512859       -0.4702283663
 LA       -1.3797884486       -1.6176944547        1.4387464536
 LA        0.8970715024       -1.5846905773        0.1828626730
 LA       -0.2070593078        1.2505972995       -1.2141479125
 LA       -1.4912974430       -0.3927844612        0.3614503548
 LA        1.2390895082        0.9631698068        0.3558990086
 LA        0.0107918346       -0.1150377182        0.0208744828
 LA        0.9621887254       -0.5652674365        1.3204851212
 LA        1.5823722506        1.5827853070       -1.6746362292
 LA        0.7589738052        1.2050639736        1.2450807752
 LA        1.3735752854       -0.2635090439       -1.1838258219
 LA       -1.4082431572       -1.0396293301       -0.1338320781
 LA        1.0795687595       -1.0059727175       -0.9523891534
 LA        1.3763364527       -0.3824809008       -0.1216046386
 LA        0.8090631732        0.9543740140        0.2589509902
 LA        1.1428766834        1.0492390777        1.3259124991
 LA       -1.4683818420       -0.4992566491        0.8965208859
 LA        0.2398882673       -0.4121713039       -0.8337116610
 LA       -1.6005090149       -0.9088510281       -1.2427284476
 LA        0.2480953600       -0.1875388038        0.0991475235
 LA       -0.6521186743       -1.1137876852       -0.4757330746
 LA       -1.2800544615        0.5370554410       -1.1801443966
 LA       -1.5214552477        0.0641284835       -1.2583117246
 LA        1.7098566242        1.5250245190        0.2145186312
 LA        1.6288936716       -0.9132281502        0.4718192213
 LA       -0.6267154728        1.2776642115        0.9066579713
 LA        1.6597978680        1.0514615944        0.3122607761
 150 LJ atoms
io1> Container radius=        5.5410279220
In run   1 temperature=      1.1000 BH perturbation step range and angular threshold=      0.4300      0.4400 all fixed
Configuration will be reset to quench geometry
Sampling using Boltzmann weights
Nocedal LBFGS minimisation
Number of updates before reset in LBFGS=     4
Maximum LBFGS step size=        0.4000000000
Guess for initial diagonal elements in LBFGS=  0.1000    
Sloppy quench tolerance for RMS gradient     0.7000000000E-02
Final  quench tolerance for RMS gradient     0.1000000000E-04
Energy difference criterion for minima=        0.0030000000
Maximum number of iterations: sloppy quenches  1000 final quenches  1000
Run   1:    100000 steps with temperature scaled by  0.10000000E+01
Maximum allowed energy rise during a minimisation=    0.1000000000E-09
Target energies:      -893.3102580000 
io1> GMIN will stop on finding a minimum within     0.3000000000E-02 of a target
Runs will be reseeded if the energy does not decrease by at least      0.00300 within   1500 steps
mc> Calculating initial energy
mc calling initial quench
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -835.8478517        0.1000000000E+11
 Qu          0 E=    -835.847851699471     steps=  359 RMS= 0.61464E-02 Markov E=    -835.847851699471     t=        0.1
 mc> Starting run of     100000 BH steps
 mc> Temperature will be multiplied by      1.00000000 at every step
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -850.7383228        -835.8478517    
 Qu          1 E=    -850.738322839679     steps=  625 RMS= 0.69801E-02 Markov E=    -835.847851699471     t=        0.1
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -853.7263783        -850.7383228    
 Qu          2 E=    -853.726378320976     steps=  184 RMS= 0.65754E-02 Markov E=    -850.738322839679     t=        0.2
 Qu          3 E=    -847.836822249608     steps=  433 RMS= 0.59852E-02 Markov E=    -853.726378320976     t=        0.2
 Qu          4 E=    -840.919286432880     steps=  375 RMS= 0.55391E-02 Markov E=    -853.726378320976     t=        0.3
 Qu          5 E=    -834.330891344585     steps=  297 RMS= 0.68574E-02 Markov E=    -853.726378320976     t=        0.3
 Qu          6 E=    -845.177865629169     steps=  317 RMS= 0.68752E-02 Markov E=    -853.726378320976     t=        0.4
 Qu          7 E=    -842.770884753844     steps=  379 RMS= 0.61215E-02 Markov E=    -853.726378320976     t=        0.4
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -860.9372884        -853.7263783    
 Qu          8 E=    -860.937288415608     steps=  188 RMS= 0.63946E-02 Markov E=    -853.726378320976     t=        0.4
 Qu          9 E=    -849.965009333611     steps=  457 RMS= 0.67159E-02 Markov E=    -860.937288415608     t=        0.5
 Qu         10 E=    -860.258431538775     steps=  294 RMS= 0.53937E-02 Markov E=    -860.937288415608     t=        0.5
 Qu         11 E=    -858.319279785673     steps=  324 RMS= 0.68257E-02 Markov E=    -860.258431538775     t=        0.6
 Qu         12 E=    -850.767510130353     steps=  390 RMS= 0.61307E-02 Markov E=    -860.258431538775     t=        0.6
 Qu         13 E=    -860.879730537916     steps=  123 RMS= 0.56280E-02 Markov E=    -860.258431538775     t=        0.7
 Qu         14 E=    -855.724257710835     steps=  255 RMS= 0.52441E-02 Markov E=    -860.879730537916     t=        0.7
 Qu         15 E=    -859.372006411082     steps=  237 RMS= 0.55428E-02 Markov E=    -860.879730537916     t=        0.7
 Qu         16 E=    -858.728107724000     steps=  231 RMS= 0.68444E-02 Markov E=    -860.879730537916     t=        0.8
 Qu         17 E=    -856.882666576400     steps=  172 RMS= 0.67406E-02 Markov E=    -860.879730537916     t=        0.8
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -864.4761420        -860.9372884    
 Qu         18 E=    -864.476142018094     steps=  168 RMS= 0.65013E-02 Markov E=    -860.879730537916     t=        0.8
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -866.8405118        -864.4761420    
 Qu         19 E=    -866.840511808674     steps=  115 RMS= 0.62800E-02 Markov E=    -864.476142018094     t=        0.8
 Qu         20 E=    -866.218015786352     steps=  236 RMS= 0.63621E-02 Markov E=    -866.840511808674     t=        0.8
 Qu         21 E=    -845.071523609212     steps=  387 RMS= 0.64467E-02 Markov E=    -866.218015786352     t=        0.9
 Qu         22 E=    -861.215306906213     steps=  139 RMS= 0.58025E-02 Markov E=    -866.218015786352     t=        0.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -866.8456338        -866.8405118    
 Qu         23 E=    -866.845633839747     steps=  147 RMS= 0.53108E-02 Markov E=    -866.218015786352     t=        0.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -867.7205463        -866.8456338    
 Qu         24 E=    -867.720546256500     steps=  237 RMS= 0.64666E-02 Markov E=    -866.845633839747     t=        1.0
 Qu         25 E=    -867.177501057135     steps=  108 RMS= 0.64291E-02 Markov E=    -867.720546256500     t=        1.0
 Qu         26 E=    -867.387688758245     steps=  532 RMS= 0.55161E-02 Markov E=    -867.177501057135     t=        1.1
 Qu         27 E=    -863.138212295286     steps=   98 RMS= 0.56534E-02 Markov E=    -867.387688758245     t=        1.1
 Qu         28 E=    -866.042608375056     steps=  122 RMS= 0.57985E-02 Markov E=    -867.387688758245     t=        1.1
 Qu         29 E=    -863.734534007279     steps=  298 RMS= 0.64765E-02 Markov E=    -867.387688758245     t=        1.1
 Qu         30 E=    -866.952565771448     steps=  161 RMS= 0.53296E-02 Markov E=    -867.387688758245     t=        1.2
 Qu         31 E=    -865.104384337316     steps=  132 RMS= 0.60748E-02 Markov E=    -867.387688758245     t=        1.2
 Qu         32 E=    -850.030600323553     steps=  550 RMS= 0.58170E-02 Markov E=    -867.387688758245     t=        1.2
 Qu         33 E=    -842.491273753009     steps=  276 RMS= 0.58960E-02 Markov E=    -867.387688758245     t=        1.3
 Qu         34 E=    -842.630222990411     steps=  205 RMS= 0.59189E-02 Markov E=    -867.387688758245     t=        1.3
 Qu         35 E=    -850.332933148179     steps=  158 RMS= 0.63781E-02 Markov E=    -867.387688758245     t=        1.3
 Qu         36 E=    -850.072659329820     steps=  283 RMS= 0.60421E-02 Markov E=    -867.387688758245     t=        1.4
 Qu         37 E=    -863.531032556108     steps=  207 RMS= 0.55965E-02 Markov E=    -867.387688758245     t=        1.4
 Qu         38 E=    -860.863229871291     steps=  161 RMS= 0.58822E-02 Markov E=    -867.387688758245     t=        1.4
 Qu         39 E=    -852.063073330031     steps=  610 RMS= 0.56565E-02 Markov E=    -867.387688758245     t=        1.5
 Qu         40 E=    -844.961714801545     steps=  556 RMS= 0.48589E-02 Markov E=    -867.387688758245     t=        1.6
 Qu         41 E=    -848.547528628111     steps=  248 RMS= 0.64721E-02 Markov E=    -867.387688758245     t=        1.6
 Qu         42 E=    -863.594376887610     steps=  253 RMS= 0.52735E-02 Markov E=    -867.387688758245     t=        1.7
 Qu         43 E=    -848.292879674034     steps=  261 RMS= 0.59182E-02 Markov E=    -867.387688758245     t=        1.7
 Qu         44 E=    -862.872113210198     steps=  142 RMS= 0.57575E-02 Markov E=    -867.387688758245     t=        1.7
 Qu         45 E=    -863.996194249618     steps=  133 RMS= 0.57078E-02 Markov E=    -867.387688758245     t=        1.7
 Qu         46 E=    -863.890836933992     steps=  220 RMS= 0.61890E-02 Markov E=    -867.387688758245     t=        1.8
 Qu         47 E=    -847.017994206212     steps=  540 RMS= 0.62454E-02 Markov E=    -867.387688758245     t=        1.8
 Qu         48 E=    -866.057982671539     steps=  116 RMS= 0.51782E-02 Markov E=    -867.387688758245     t=        1.9
 Qu         49 E=    -847.776170081752     steps=  195 RMS= 0.67315E-02 Markov E=    -867.387688758245     t=        1.9
 Qu         50 E=    -857.002619842397     steps=  212 RMS= 0.58320E-02 Markov E=    -867.387688758245     t=        1.9
Acceptance ratio for previous     50 steps=  0.2400  FAC=  1.0500
 Qu         51 E=    -856.616529605486     steps=  289 RMS= 0.61788E-02 Markov E=    -867.387688758245     t=        1.9
 Qu         52 E=    -846.296422926742     steps=  449 RMS= 0.67633E-02 Markov E=    -867.387688758245     t=        2.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -868.0219069        -867.7205463    
 Qu         53 E=    -868.021906911033     steps=   97 RMS= 0.62132E-02 Markov E=    -867.387688758245     t=        2.0
 Qu         54 E=    -851.176388757667     steps=  202 RMS= 0.59827E-02 Markov E=    -868.021906911033     t=        2.0
 Qu         55 E=    -851.156287480322     steps=  317 RMS= 0.66433E-02 Markov E=    -868.021906911033     t=        2.1
 Qu         56 E=    -851.411072547824     steps=  256 RMS= 0.59173E-02 Markov E=    -868.021906911033     t=        2.1
 Qu         57 E=    -839.493879488439     steps=  348 RMS= 0.67100E-02 Markov E=    -868.021906911033     t=        2.2
 Qu         58 E=    -866.144425429235     steps=  101 RMS= 0.68694E-02 Markov E=    -868.021906911033     t=        2.2
 Qu         59 E=    -865.557550981207     steps=   95 RMS= 0.65944E-02 Markov E=    -866.144425429235     t=        2.2
 Qu         60 E=    -858.688168625169     steps=  313 RMS= 0.68180E-02 Markov E=    -865.557550981207     t=        2.2
 Qu         61 E=    -859.048512701638     steps=  140 RMS= 0.56702E-02 Markov E=    -865.557550981207     t=        2.3
 Qu         62 E=    -859.964921899869     steps=  191 RMS= 0.52184E-02 Markov E=    -865.557550981207     t=        2.3
 Qu         63 E=    -857.464790721834     steps=  461 RMS= 0.67646E-02 Markov E=    -865.557550981207     t=        2.4
 Qu         64 E=    -866.104796241536     steps=  109 RMS= 0.66584E-02 Markov E=    -865.557550981207     t=        2.4
 Qu         65 E=    -866.028159363507     steps=  125 RMS= 0.66957E-02 Markov E=    -866.104796241536     t=        2.4
 Qu         66 E=    -864.511924759412     steps=  100 RMS= 0.55955E-02 Markov E=    -866.028159363507     t=        2.4
 Qu         67 E=    -866.648051190950     steps=  137 RMS= 0.67747E-02 Markov E=    -864.511924759412     t=        2.4
 Qu         68 E=    -865.343541863509     steps=  119 RMS= 0.67574E-02 Markov E=    -866.648051190950     t=        2.4
 Qu         69 E=    -864.728694604112     steps=  129 RMS= 0.58061E-02 Markov E=    -866.648051190950     t=        2.5
 Qu         70 E=    -866.369330481902     steps=  194 RMS= 0.69031E-02 Markov E=    -866.648051190950     t=        2.5
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -868.9729665        -868.0219069    
 Qu         71 E=    -868.972966505626     steps=  191 RMS= 0.62406E-02 Markov E=    -866.369330481902     t=        2.5
 Qu         72 E=    -847.143856352212     steps=  293 RMS= 0.64877E-02 Markov E=    -868.972966505626     t=        2.5
 Qu         73 E=    -849.453904082423     steps=  192 RMS= 0.58714E-02 Markov E=    -868.972966505626     t=        2.6
 Qu         74 E=    -842.340866690519     steps=  353 RMS= 0.56831E-02 Markov E=    -868.972966505626     t=        2.6
 Qu         75 E=    -861.328119774935     steps=  163 RMS= 0.59103E-02 Markov E=    -868.972966505626     t=        2.6
 Qu         76 E=    -853.714546183308     steps=  175 RMS= 0.53334E-02 Markov E=    -868.972966505626     t=        2.7
 Qu         77 E=    -860.994392254438     steps=  543 RMS= 0.68908E-02 Markov E=    -868.972966505626     t=        2.7
 Qu         78 E=    -857.587308617801     steps=  241 RMS= 0.49793E-02 Markov E=    -868.972966505626     t=        2.8
 Qu         79 E=    -843.699867964454     steps=  367 RMS= 0.67921E-02 Markov E=    -868.972966505626     t=        2.8
 Qu         80 E=    -868.720852222552     steps=  208 RMS= 0.58031E-02 Markov E=    -868.972966505626     t=        2.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -869.7887158        -868.9729665    
 Qu         81 E=    -869.788715794308     steps=  100 RMS= 0.64098E-02 Markov E=    -868.972966505626     t=        2.9
 Qu         82 E=    -866.259336475059     steps=  172 RMS= 0.55727E-02 Markov E=    -869.788715794308     t=        2.9
 Qu         83 E=    -867.126574127200     steps=  221 RMS= 0.68775E-02 Markov E=    -869.788715794308     t=        2.9
 Qu         84 E=    -865.918384891799     steps=  151 RMS= 0.67162E-02 Markov E=    -869.788715794308     t=        2.9
 Qu         85 E=    -841.969338761123     steps=  354 RMS= 0.68470E-02 Markov E=    -869.788715794308     t=        3.0
 Qu         86 E=    -851.455207049297     steps=  189 RMS= 0.64742E-02 Markov E=    -869.788715794308     t=        3.0
 Qu         87 E=    -842.824323162815     steps=  232 RMS= 0.52055E-02 Markov E=    -869.788715794308     t=        3.1
 Qu         88 E=    -869.291814558289     steps=  107 RMS= 0.64612E-02 Markov E=    -869.788715794308     t=        3.1
 Qu         89 E=    -866.858317176806     steps=  194 RMS= 0.64969E-02 Markov E=    -869.291814558289     t=        3.1
 Qu         90 E=    -864.997947434833     steps=  213 RMS= 0.56521E-02 Markov E=    -869.291814558289     t=        3.1
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -872.3108833        -869.7887158    
 Qu         91 E=    -872.310883290758     steps=  131 RMS= 0.55621E-02 Markov E=    -869.291814558289     t=        3.1
 Qu         92 E=    -857.465265534028     steps=  226 RMS= 0.64431E-02 Markov E=    -872.310883290758     t=        3.2
 Qu         93 E=    -843.937592000832     steps=  382 RMS= 0.58997E-02 Markov E=    -872.310883290758     t=        3.2
 Qu         94 E=    -865.558316952390     steps=  145 RMS= 0.62620E-02 Markov E=    -872.310883290758     t=        3.3
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -873.3723132        -872.3108833    
 Qu         95 E=    -873.372313170566     steps=  135 RMS= 0.64481E-02 Markov E=    -872.310883290758     t=        3.3
 Qu         96 E=    -871.463077835119     steps=  204 RMS= 0.36911E-02 Markov E=    -873.372313170566     t=        3.3
 Qu         97 E=    -868.486398970408     steps=  106 RMS= 0.62233E-02 Markov E=    -873.372313170566     t=        3.3
 Qu         98 E=    -843.867079747634     steps=  235 RMS= 0.57671E-02 Markov E=    -873.372313170566     t=        3.3
 Qu         99 E=    -865.564113762295     steps=  201 RMS= 0.58912E-02 Markov E=    -873.372313170566     t=        3.4
 Qu        100 E=    -851.004931209817     steps=  363 RMS= 0.67481E-02 Markov E=    -873.372313170566     t=        3.4
Acceptance ratio for previous     50 steps=  0.2600  FAC=  1.0500
 Qu        101 E=    -861.253662851060     steps=  263 RMS= 0.58454E-02 Markov E=    -873.372313170566     t=        3.5
 Qu        102 E=    -872.166873666072     steps=  125 RMS= 0.55278E-02 Markov E=    -873.372313170566     t=        3.5
 Qu        103 E=    -871.435560046951     steps=  167 RMS= 0.56977E-02 Markov E=    -872.166873666072     t=        3.5
 Qu        104 E=    -868.340468616218     steps=  135 RMS= 0.51449E-02 Markov E=    -871.435560046951     t=        3.5
 Qu        105 E=    -861.056537639261     steps=  209 RMS= 0.63302E-02 Markov E=    -871.435560046951     t=        3.5
 Qu        106 E=    -870.408587785535     steps=  190 RMS= 0.63990E-02 Markov E=    -871.435560046951     t=        3.6
 Qu        107 E=    -865.959209980496     steps=  131 RMS= 0.65984E-02 Markov E=    -870.408587785535     t=        3.6
 Qu        108 E=    -860.191907827319     steps=  190 RMS= 0.36902E-02 Markov E=    -870.408587785535     t=        3.6
 Qu        109 E=    -867.992738936670     steps=   94 RMS= 0.55994E-02 Markov E=    -870.408587785535     t=        3.6
 Qu        110 E=    -861.325922223744     steps=  289 RMS= 0.52524E-02 Markov E=    -870.408587785535     t=        3.7
 Qu        111 E=    -847.769614418754     steps=  421 RMS= 0.69306E-02 Markov E=    -870.408587785535     t=        3.7
 Qu        112 E=    -870.282542910450     steps=  133 RMS= 0.49919E-02 Markov E=    -870.408587785535     t=        3.8
 Qu        113 E=    -844.472171467768     steps=  279 RMS= 0.61066E-02 Markov E=    -870.282542910450     t=        3.8
 Qu        114 E=    -870.088277130569     steps=  130 RMS= 0.51396E-02 Markov E=    -870.282542910450     t=        3.8
 Qu        115 E=    -863.348298010973     steps=  165 RMS= 0.55609E-02 Markov E=    -870.282542910450     t=        3.8
 Qu        116 E=    -869.138786926825     steps=  141 RMS= 0.56954E-02 Markov E=    -870.282542910450     t=        3.8
 Qu        117 E=    -850.633919233642     steps=  291 RMS= 0.60363E-02 Markov E=    -870.282542910450     t=        3.9
 Qu        118 E=    -865.513764550413     steps=  152 RMS= 0.54658E-02 Markov E=    -870.282542910450     t=        3.9
 Qu        119 E=    -858.570255351563     steps=  150 RMS= 0.56474E-02 Markov E=    -870.282542910450     t=        3.9
 Qu        120 E=    -867.675538654980     steps=  174 RMS= 0.67243E-02 Markov E=    -870.282542910450     t=        4.0
 Qu        121 E=    -870.181043173876     steps=  622 RMS= 0.59332E-02 Markov E=    -870.282542910450     t=        4.0
 Qu        122 E=    -868.200379301629     steps=  293 RMS= 0.49799E-02 Markov E=    -870.181043173876     t=        4.1
 Qu        123 E=    -868.711817320893     steps=  139 RMS= 0.57955E-02 Markov E=    -870.181043173876     t=        4.1
 Qu        124 E=    -862.937451003535     steps=  183 RMS= 0.68259E-02 Markov E=    -870.181043173876     t=        4.1
 Qu        125 E=    -862.702867495354     steps=  415 RMS= 0.66182E-02 Markov E=    -870.181043173876     t=        4.2
 Qu        126 E=    -869.882011316798     steps=  173 RMS= 0.57196E-02 Markov E=    -870.181043173876     t=        4.2
 Qu        127 E=    -845.178561942670     steps=  548 RMS= 0.53688E-02 Markov E=    -870.181043173876     t=        4.3
 Qu        128 E=    -869.759519822093     steps=  107 RMS= 0.61447E-02 Markov E=    -870.181043173876     t=        4.3
 Qu        129 E=    -867.661067009491     steps=  150 RMS= 0.60681E-02 Markov E=    -869.759519822093     t=        4.3
 Qu        130 E=    -864.383932392043     steps=  240 RMS= 0.57385E-02 Markov E=    -869.759519822093     t=        4.4
 Qu        131 E=    -871.045525214759     steps=  232 RMS= 0.56358E-02 Markov E=    -869.759519822093     t=        4.4
 Qu        132 E=    -845.824401801872     steps=  294 RMS= 0.62424E-02 Markov E=    -871.045525214759     t=        4.4
 Qu        133 E=    -866.168971424484     steps=  127 RMS= 0.59679E-02 Markov E=    -871.045525214759     t=        4.5
 Qu        134 E=    -869.846086746153     steps=  128 RMS= 0.65404E-02 Markov E=    -871.045525214759     t=        4.5
 Qu        135 E=    -856.909066664246     steps=  289 RMS= 0.62865E-02 Markov E=    -869.846086746153     t=        4.5
 Qu        136 E=    -862.516670492685     steps=  264 RMS= 0.65323E-02 Markov E=    -869.846086746153     t=        4.5
 Qu        137 E=    -844.029417472536     steps=  240 RMS= 0.57355E-02 Markov E=    -869.846086746153     t=        4.6
 Qu        138 E=    -866.564599747348     steps=  264 RMS= 0.37826E-02 Markov E=    -869.846086746153     t=        4.6
 Qu        139 E=    -848.865685826067     steps=  305 RMS= 0.64162E-02 Markov E=    -869.846086746153     t=        4.7
 Qu        140 E=    -853.584262990990     steps=  470 RMS= 0.67260E-02 Markov E=    -869.846086746153     t=        4.7
 Qu        141 E=    -862.757548868682     steps=  252 RMS= 0.51393E-02 Markov E=    -869.846086746153     t=        4.8
 Qu        142 E=    -863.317455149152     steps=  208 RMS= 0.66922E-02 Markov E=    -869.846086746153     t=        4.8
 Qu        143 E=    -870.193265102682     steps=  111 RMS= 0.63573E-02 Markov E=    -869.846086746153     t=        4.8
 Qu        144 E=    -845.752536830141     steps=  190 RMS= 0.50928E-02 Markov E=    -870.193265102682     t=        4.8
 Qu        145 E=    -860.723882852392     steps=  292 RMS= 0.66048E-02 Markov E=    -870.193265102682     t=        4.9
 Qu        146 E=    -868.353183454735     steps=  123 RMS= 0.65043E-02 Markov E=    -870.193265102682     t=        4.9
 Qu        147 E=    -869.538640031709     steps=  407 RMS= 0.58416E-02 Markov E=    -868.353183454735     t=        5.0
 Qu        148 E=    -870.797425420498     steps=  202 RMS= 0.51066E-02 Markov E=    -869.538640031709     t=        5.0
 Qu        149 E=    -856.889645455348     steps=  167 RMS= 0.65187E-02 Markov E=    -870.797425420498     t=        5.0
 Qu        150 E=    -870.006324720192     steps=  181 RMS= 0.46434E-02 Markov E=    -870.797425420498     t=        5.0
Acceptance ratio for previous     50 steps=  0.2600  FAC=  1.0500
 Qu        151 E=    -870.737516811793     steps=   92 RMS= 0.68565E-02 Markov E=    -870.006324720192     t=        5.0
 Qu        152 E=    -851.190262630559     steps=  252 RMS= 0.59786E-02 Markov E=    -870.737516811793     t=        5.1
 Qu        153 E=    -863.946159303244     steps=  155 RMS= 0.41105E-02 Markov E=    -870.737516811793     t=        5.1
 Qu        154 E=    -869.273574970034     steps=  234 RMS= 0.52892E-02 Markov E=    -870.737516811793     t=        5.1
 Qu        155 E=    -845.303466521086     steps=  471 RMS= 0.69871E-02 Markov E=    -870.737516811793     t=        5.2
 Qu        156 E=    -859.599908136401     steps=  247 RMS= 0.68476E-02 Markov E=    -870.737516811793     t=        5.2
 Qu        157 E=    -870.590832502783     steps=   94 RMS= 0.65966E-02 Markov E=    -870.737516811793     t=        5.2
 Qu        158 E=    -844.806533550487     steps=  672 RMS= 0.65675E-02 Markov E=    -870.590832502783     t=        5.3
 Qu        159 E=    -850.297164690821     steps=  312 RMS= 0.57614E-02 Markov E=    -870.590832502783     t=        5.4
 Qu        160 E=    -870.391840390233     steps=  111 RMS= 0.61658E-02 Markov E=    -870.590832502783     t=        5.4
 Qu        161 E=    -838.877800059718     steps=  306 RMS= 0.64069E-02 Markov E=    -870.391840390233     t=        5.4
 Qu        162 E=    -840.212672610174     steps=  292 RMS= 0.51588E-02 Markov E=    -870.391840390233     t=        5.5
 Qu        163 E=    -865.548622060344     steps=  179 RMS= 0.69128E-02 Markov E=    -870.391840390233     t=        5.5
 Qu        164 E=    -868.106928621454     steps=  215 RMS= 0.59996E-02 Markov E=    -870.391840390233     t=        5.5
 Qu        165 E=    -844.153506380309     steps=  198 RMS= 0.65327E-02 Markov E=    -870.391840390233     t=        5.6
 Qu        166 E=    -868.151232326999     steps=  171 RMS= 0.55969E-02 Markov E=    -870.391840390233     t=        5.6
 Qu        167 E=    -858.140521767832     steps=  690 RMS= 0.51238E-02 Markov E=    -868.151232326999     t=        5.7
 Qu        168 E=    -866.398652727831     steps=  402 RMS= 0.65510E-02 Markov E=    -868.151232326999     t=        5.7
 Qu        169 E=    -845.032661464455     steps=  250 RMS= 0.50759E-02 Markov E=    -868.151232326999     t=        5.8
 Qu        170 E=    -856.789940587057     steps=  252 RMS= 0.64120E-02 Markov E=    -868.151232326999     t=        5.8
 Qu        171 E=    -868.435726060121     steps=  147 RMS= 0.51492E-02 Markov E=    -868.151232326999     t=        5.8
 Qu        172 E=    -839.066807373312     steps=  493 RMS= 0.57723E-02 Markov E=    -868.435726060121     t=        5.9
 Qu        173 E=    -864.046718089137     steps=  162 RMS= 0.65278E-02 Markov E=    -868.435726060121     t=        5.9
 Qu        174 E=    -869.372833639912     steps=  193 RMS= 0.67263E-02 Markov E=    -868.435726060121     t=        6.0
 Qu        175 E=    -865.983605222286     steps=  426 RMS= 0.63398E-02 Markov E=    -869.372833639912     t=        6.0
 Qu        176 E=    -858.116898404009     steps=  182 RMS= 0.63766E-02 Markov E=    -865.983605222286     t=        6.0
 Qu        177 E=    -851.271104738277     steps=  210 RMS= 0.60158E-02 Markov E=    -865.983605222286     t=        6.1
 Qu        178 E=    -866.871638800430     steps=  120 RMS= 0.63554E-02 Markov E=    -865.983605222286     t=        6.1
 Qu        179 E=    -845.756115727806     steps=  428 RMS= 0.63901E-02 Markov E=    -866.871638800430     t=        6.1
 Qu        180 E=    -865.372470449646     steps=  436 RMS= 0.65528E-02 Markov E=    -866.871638800430     t=        6.2
 Qu        181 E=    -841.870607950483     steps=  307 RMS= 0.68665E-02 Markov E=    -866.871638800430     t=        6.2
 Qu        182 E=    -861.847304793652     steps=  206 RMS= 0.42234E-02 Markov E=    -866.871638800430     t=        6.3
 Qu        183 E=    -846.343917526417     steps=  246 RMS= 0.66627E-02 Markov E=    -866.871638800430     t=        6.3
 Qu        184 E=    -847.764042410034     steps=  359 RMS= 0.65061E-02 Markov E=    -866.871638800430     t=        6.4
 Qu        185 E=    -858.327709611050     steps=  113 RMS= 0.57820E-02 Markov E=    -866.871638800430     t=        6.4
 Qu        186 E=    -862.066961655769     steps=  199 RMS= 0.63690E-02 Markov E=    -866.871638800430     t=        6.4
 Qu        187 E=    -870.383668356465     steps=  159 RMS= 0.38726E-02 Markov E=    -866.871638800430     t=        6.4
 Qu        188 E=    -835.788243871127     steps=  297 RMS= 0.68649E-02 Markov E=    -870.383668356465     t=        6.5
 Qu        189 E=    -867.303811460696     steps=  159 RMS= 0.52213E-02 Markov E=    -870.383668356465     t=        6.5
 Qu        190 E=    -870.672396213084     steps=  152 RMS= 0.51307E-02 Markov E=    -870.383668356465     t=        6.5
 Qu        191 E=    -873.199903207224     steps=  150 RMS= 0.66175E-02 Markov E=    -870.672396213084     t=        6.5
 Qu        192 E=    -864.133936108109     steps=  176 RMS= 0.66195E-02 Markov E=    -873.199903207224     t=        6.6
 Qu        193 E=    -866.663781861419     steps=  240 RMS= 0.50471E-02 Markov E=    -873.199903207224     t=        6.6
 Qu        194 E=    -864.607458880632     steps=  256 RMS= 0.63598E-02 Markov E=    -873.199903207224     t=        6.6
 Qu        195 E=    -867.090701002169     steps=  147 RMS= 0.67290E-02 Markov E=    -873.199903207224     t=        6.6
 Qu        196 E=    -871.449985287993     steps=  144 RMS= 0.46507E-02 Markov E=    -873.199903207224     t=        6.7
 Qu        197 E=    -872.422883681907     steps=  158 RMS= 0.62132E-02 Markov E=    -873.199903207224     t=        6.7
 Qu        198 E=    -868.205320203332     steps=  121 RMS= 0.50978E-02 Markov E=    -872.422883681907     t=        6.7
 Qu        199 E=    -853.259810222326     steps=  228 RMS= 0.44382E-02 Markov E=    -872.422883681907     t=        6.7
 Qu        200 E=    -871.576817048453     steps=  150 RMS= 0.66209E-02 Markov E=    -872.422883681907     t=        6.8
Acceptance ratio for previous     50 steps=  0.2400  FAC=  1.0500
 Qu        201 E=    -865.588499829913     steps=  161 RMS= 0.53445E-02 Markov E=    -872.422883681907     t=        6.8
 Qu        202 E=    -858.070823646274     steps=  338 RMS= 0.54867E-02 Markov E=    -872.422883681907     t=        6.8
 Qu        203 E=    -856.784905070335     steps=  100 RMS= 0.64762E-02 Markov E=    -872.422883681907     t=        6.8
 Qu        204 E=    -835.641045980866     steps=  215 RMS= 0.55476E-02 Markov E=    -872.422883681907     t=        6.9
 Qu        205 E=    -848.835431670999     steps=  380 RMS= 0.53384E-02 Markov E=    -872.422883681907     t=        6.9
 Qu        206 E=    -869.091935874055     steps=  138 RMS= 0.64524E-02 Markov E=    -872.422883681907     t=        6.9
 Qu        207 E=    -856.112630051514     steps=  153 RMS= 0.55566E-02 Markov E=    -872.422883681907     t=        7.0
 Qu        208 E=    -861.568222915391     steps=  248 RMS= 0.44817E-02 Markov E=    -872.422883681907     t=        7.0
 Qu        209 E=    -850.976661429477     steps=  310 RMS= 0.68512E-02 Markov E=    -872.422883681907     t=        7.0
 Qu        210 E=    -849.333665499972     steps=  584 RMS= 0.63909E-02 Markov E=    -872.422883681907     t=        7.1
 Qu        211 E=    -839.686641624976     steps=  435 RMS= 0.60714E-02 Markov E=    -872.422883681907     t=        7.2
 Qu        212 E=    -872.858967029756     steps=  153 RMS= 0.61994E-02 Markov E=    -872.422883681907     t=        7.2
 Qu        213 E=    -858.567485267325     steps=  175 RMS= 0.58530E-02 Markov E=    -872.858967029756     t=        7.2
 Qu        214 E=    -870.830884803248     steps=  139 RMS= 0.57481E-02 Markov E=    -872.858967029756     t=        7.2
 Qu        215 E=    -872.531001429658     steps=  132 RMS= 0.55219E-02 Markov E=    -872.858967029756     t=        7.3
 Qu        216 E=    -868.863422965641     steps=  164 RMS= 0.49232E-02 Markov E=    -872.858967029756     t=        7.3
 Qu        217 E=    -848.280542644513     steps=  260 RMS= 0.62230E-02 Markov E=    -872.858967029756     t=        7.3
 Qu        218 E=    -864.947153724693     steps=  349 RMS= 0.65435E-02 Markov E=    -872.858967029756     t=        7.4
 Qu        219 E=    -851.223835803308     steps=  637 RMS= 0.67349E-02 Markov E=    -872.858967029756     t=        7.5
 Qu        220 E=    -871.046679837659     steps=  139 RMS= 0.59536E-02 Markov E=    -872.858967029756     t=        7.5
 Qu        221 E=    -865.402929766299     steps=  133 RMS= 0.67920E-02 Markov E=    -872.858967029756     t=        7.5
 Qu        222 E=    -860.689073520076     steps=  205 RMS= 0.56479E-02 Markov E=    -872.858967029756     t=        7.5
 Qu        223 E=    -843.567841294057     steps=  372 RMS= 0.64740E-02 Markov E=    -872.858967029756     t=        7.6
 Qu        224 E=    -868.782125540627     steps=  166 RMS= 0.53401E-02 Markov E=    -872.858967029756     t=        7.6
 Qu        225 E=    -863.400469263409     steps=  143 RMS= 0.55397E-02 Markov E=    -872.858967029756     t=        7.6
 Qu        226 E=    -873.370101976617     steps=  165 RMS= 0.65346E-02 Markov E=    -872.858967029756     t=        7.6
 Qu        227 E=    -850.131767242920     steps=  159 RMS= 0.67129E-02 Markov E=    -873.370101976617     t=        7.7
 Qu        228 E=    -869.181953922739     steps=  231 RMS= 0.44781E-02 Markov E=    -873.370101976617     t=        7.7
 Qu        229 E=    -869.501758193996     steps=  112 RMS= 0.64485E-02 Markov E=    -873.370101976617     t=        7.7
 Qu        230 E=    -871.699557979332     steps=  102 RMS= 0.57955E-02 Markov E=    -873.370101976617     t=        7.7
 Qu        231 E=    -863.352352674666     steps=  129 RMS= 0.63502E-02 Markov E=    -873.370101976617     t=        7.7
 Qu        232 E=    -847.996637513575     steps=  304 RMS= 0.66079E-02 Markov E=    -873.370101976617     t=        7.8
 Qu        233 E=    -843.989482991996     steps=  485 RMS= 0.69263E-02 Markov E=    -873.370101976617     t=        7.9
 Qu        234 E=    -872.196917131136     steps=  157 RMS= 0.60179E-02 Markov E=    -873.370101976617     t=        7.9
 Qu        235 E=    -868.158956929853     steps=  142 RMS= 0.59960E-02 Markov E=    -872.196917131136     t=        7.9
 Qu        236 E=    -868.603185527512     steps=  167 RMS= 0.54578E-02 Markov E=    -872.196917131136     t=        7.9
 Qu        237 E=    -851.454451432093     steps=  315 RMS= 0.62482E-02 Markov E=    -872.196917131136     t=        8.0
 Qu        238 E=    -871.955104564299     steps=  146 RMS= 0.64689E-02 Markov E=    -872.196917131136     t=        8.0
 Qu        239 E=    -863.970099988123     steps=  175 RMS= 0.63008E-02 Markov E=    -871.955104564299     t=        8.0
 Qu        240 E=    -867.444773302508     steps=  197 RMS= 0.59299E-02 Markov E=    -871.955104564299     t=        8.0
 Qu        241 E=    -860.560430431817     steps=  285 RMS= 0.65489E-02 Markov E=    -871.955104564299     t=        8.1
 Qu        242 E=    -845.844710930145     steps=  373 RMS= 0.59657E-02 Markov E=    -871.955104564299     t=        8.1
 Qu        243 E=    -842.663185184634     steps=  216 RMS= 0.69389E-02 Markov E=    -871.955104564299     t=        8.2
 Qu        244 E=    -867.406774603894     steps=  222 RMS= 0.58351E-02 Markov E=    -871.955104564299     t=        8.2
 Qu        245 E=    -873.249013183564     steps=   91 RMS= 0.53829E-02 Markov E=    -871.955104564299     t=        8.2
 Qu        246 E=    -872.242331220598     steps=   86 RMS= 0.61042E-02 Markov E=    -873.249013183564     t=        8.2
 Qu        247 E=    -861.363991738533     steps=  130 RMS= 0.44089E-02 Markov E=    -873.249013183564     t=        8.2
 Qu        248 E=    -870.997412137157     steps=  130 RMS= 0.49254E-02 Markov E=    -873.249013183564     t=        8.3
 Qu        249 E=    -872.196899696613     steps=   90 RMS= 0.54386E-02 Markov E=    -873.249013183564     t=        8.3
 Qu        250 E=    -834.527443228736     steps=  248 RMS= 0.68491E-02 Markov E=    -873.249013183564     t=        8.3
Acceptance ratio for previous     50 steps=  0.1000  FAC=  1.0500
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -875.4491993        -873.3723132    
 Qu        251 E=    -875.449199347566     steps=   90 RMS= 0.63028E-02 Markov E=    -873.249013183564     t=        8.3
 Qu        252 E=    -868.368169027802     steps=  125 RMS= 0.58762E-02 Markov E=    -875.449199347566     t=        8.3
 Qu        253 E=    -859.080910128325     steps=  132 RMS= 0.58941E-02 Markov E=    -875.449199347566     t=        8.3
 Qu        254 E=    -847.103626691830     steps=  393 RMS= 0.57827E-02 Markov E=    -875.449199347566     t=        8.4
 Qu        255 E=    -866.566152933662     steps=  279 RMS= 0.57209E-02 Markov E=    -875.449199347566     t=        8.4
 Qu        256 E=    -854.324950161501     steps=  294 RMS= 0.63005E-02 Markov E=    -875.449199347566     t=        8.5
 Qu        257 E=    -873.401830878177     steps=  163 RMS= 0.67459E-02 Markov E=    -875.449199347566     t=        8.5
 Qu        258 E=    -875.112535793405     steps=  126 RMS= 0.60517E-02 Markov E=    -875.449199347566     t=        8.5
 Qu        259 E=    -854.073551764134     steps=  150 RMS= 0.65496E-02 Markov E=    -875.112535793405     t=        8.5
 Qu        260 E=    -848.032907058959     steps=  421 RMS= 0.66664E-02 Markov E=    -875.112535793405     t=        8.6
 Qu        261 E=    -866.295187158601     steps=  271 RMS= 0.51997E-02 Markov E=    -875.112535793405     t=        8.6
 Qu        262 E=    -873.571709362694     steps=  133 RMS= 0.65014E-02 Markov E=    -875.112535793405     t=        8.7
 Qu        263 E=    -848.129937402808     steps=  148 RMS= 0.55954E-02 Markov E=    -875.112535793405     t=        8.7
 Qu        264 E=    -866.899370047399     steps=  313 RMS= 0.47707E-02 Markov E=    -875.112535793405     t=        8.7
 Qu        265 E=    -860.045940469026     steps=  433 RMS= 0.57962E-02 Markov E=    -875.112535793405     t=        8.8
 Qu        266 E=    -873.597298002367     steps=  139 RMS= 0.56595E-02 Markov E=    -875.112535793405     t=        8.8
 Qu        267 E=    -870.649901525998     steps=  121 RMS= 0.68246E-02 Markov E=    -873.597298002367     t=        8.8
 Qu        268 E=    -872.636349950225     steps=  117 RMS= 0.66385E-02 Markov E=    -873.597298002367     t=        8.8
 Qu        269 E=    -854.631613704047     steps=  133 RMS= 0.58649E-02 Markov E=    -872.636349950225     t=        8.9
 Qu        270 E=    -867.181834754661     steps=  285 RMS= 0.65583E-02 Markov E=    -872.636349950225     t=        8.9
 Qu        271 E=    -860.333224326922     steps=  150 RMS= 0.65955E-02 Markov E=    -872.636349950225     t=        8.9
 Qu        272 E=    -873.940707697712     steps=  106 RMS= 0.47062E-02 Markov E=    -872.636349950225     t=        8.9
 Qu        273 E=    -865.497068545340     steps=  122 RMS= 0.63690E-02 Markov E=    -873.940707697712     t=        9.0
 Qu        274 E=    -847.279306004590     steps=  269 RMS= 0.68057E-02 Markov E=    -873.940707697712     t=        9.0
 Qu        275 E=    -869.952046562935     steps=  151 RMS= 0.65088E-02 Markov E=    -873.940707697712     t=        9.0
 Qu        276 E=    -872.453267973593     steps=  242 RMS= 0.51815E-02 Markov E=    -873.940707697712     t=        9.0
 Qu        277 E=    -865.460937895895     steps=  105 RMS= 0.65087E-02 Markov E=    -872.453267973593     t=        9.1
 Qu        278 E=    -869.309375805173     steps=  103 RMS= 0.66432E-02 Markov E=    -872.453267973593     t=        9.1
 Qu        279 E=    -858.941610867905     steps=  312 RMS= 0.56368E-02 Markov E=    -872.453267973593     t=        9.1
 Qu        280 E=    -868.741728043854     steps=  135 RMS= 0.44407E-02 Markov E=    -872.453267973593     t=        9.1
 Qu        281 E=    -868.597300899429     steps=  110 RMS= 0.61737E-02 Markov E=    -872.453267973593     t=        9.1
 Qu        282 E=    -838.729435896701     steps=  373 RMS= 0.67006E-02 Markov E=    -872.453267973593     t=        9.2
 Qu        283 E=    -866.136282345577     steps=  321 RMS= 0.45413E-02 Markov E=    -872.453267973593     t=        9.2
 Qu        284 E=    -863.669111724893     steps=  270 RMS= 0.48284E-02 Markov E=    -872.453267973593     t=        9.3
 Qu        285 E=    -845.007037824636     steps=  210 RMS= 0.52961E-02 Markov E=    -872.453267973593     t=        9.3
 Qu        286 E=    -842.463030285345     steps=  291 RMS= 0.65849E-02 Markov E=    -872.453267973593     t=        9.4
 Qu        287 E=    -868.059460016797     steps=  137 RMS= 0.67515E-02 Markov E=    -872.453267973593     t=        9.4
 Qu        288 E=    -868.115645753683     steps=  274 RMS= 0.67224E-02 Markov E=    -872.453267973593     t=        9.4
 Qu        289 E=    -862.563134222442     steps=  170 RMS= 0.55447E-02 Markov E=    -872.453267973593     t=        9.4
 Qu        290 E=    -856.581030706502     steps=  355 RMS= 0.64286E-02 Markov E=    -872.453267973593     t=        9.5
 Qu        291 E=    -868.383793377590     steps=  102 RMS= 0.49027E-02 Markov E=    -872.453267973593     t=        9.5
 Qu        292 E=    -871.697943260320     steps=  170 RMS= 0.54439E-02 Markov E=    -872.453267973593     t=        9.5
 Qu        293 E=    -867.130428260996     steps=   82 RMS= 0.65254E-02 Markov E=    -871.697943260320     t=        9.5
 Qu        294 E=    -842.503161175259     steps=  407 RMS= 0.61616E-02 Markov E=    -871.697943260320     t=        9.6
 Qu        295 E=    -869.562096920196     steps=  177 RMS= 0.50880E-02 Markov E=    -871.697943260320     t=        9.6
 Qu        296 E=    -837.679130143306     steps=  174 RMS= 0.69767E-02 Markov E=    -871.697943260320     t=        9.6
 Qu        297 E=    -856.693403563923     steps=  389 RMS= 0.52897E-02 Markov E=    -871.697943260320     t=        9.7
 Qu        298 E=    -847.797339219780     steps=  539 RMS= 0.63658E-02 Markov E=    -871.697943260320     t=        9.8
 Qu        299 E=    -868.005476161138     steps=   97 RMS= 0.50044E-02 Markov E=    -871.697943260320     t=        9.8
 Qu        300 E=    -853.328891074333     steps=  247 RMS= 0.65389E-02 Markov E=    -871.697943260320     t=        9.8
Acceptance ratio for previous     50 steps=  0.1400  FAC=  1.0500
 Qu        301 E=    -865.035456494586     steps=   92 RMS= 0.69575E-02 Markov E=    -871.697943260320     t=        9.8
 Qu        302 E=    -861.100871868987     steps=  107 RMS= 0.56513E-02 Markov E=    -871.697943260320     t=        9.8
 Qu        303 E=    -837.754891511488     steps=  303 RMS= 0.57964E-02 Markov E=    -871.697943260320     t=        9.9
 Qu        304 E=    -869.573999815850     steps=  114 RMS= 0.64724E-02 Markov E=    -871.697943260320     t=        9.9
 Qu        305 E=    -851.401327160103     steps=  311 RMS= 0.55485E-02 Markov E=    -871.697943260320     t=        9.9
 Qu        306 E=    -857.048589325892     steps=  329 RMS= 0.56644E-02 Markov E=    -871.697943260320     t=       10.0
 Qu        307 E=    -868.730289795872     steps=  131 RMS= 0.64340E-02 Markov E=    -871.697943260320     t=       10.0
 Qu        308 E=    -851.584188147908     steps=  398 RMS= 0.58626E-02 Markov E=    -871.697943260320     t=       10.1
 Qu        309 E=    -868.844260896781     steps=  130 RMS= 0.64119E-02 Markov E=    -871.697943260320     t=       10.1
 Qu        310 E=    -858.725926718105     steps=  259 RMS= 0.69511E-02 Markov E=    -871.697943260320     t=       10.1
 Qu        311 E=    -869.962427488400     steps=  118 RMS= 0.58267E-02 Markov E=    -871.697943260320     t=       10.1
 Qu        312 E=    -865.903590110082     steps=  110 RMS= 0.63874E-02 Markov E=    -871.697943260320     t=       10.1
 Qu        313 E=    -869.953153588426     steps=   98 RMS= 0.66265E-02 Markov E=    -871.697943260320     t=       10.2
 Qu        314 E=    -867.121203772389     steps=  162 RMS= 0.65939E-02 Markov E=    -871.697943260320     t=       10.2
 Qu        315 E=    -848.903981897194     steps=  220 RMS= 0.64425E-02 Markov E=    -871.697943260320     t=       10.2
 Qu        316 E=    -862.951141485684     steps=  295 RMS= 0.60808E-02 Markov E=    -871.697943260320     t=       10.3
 Qu        317 E=    -844.745501625127     steps=  302 RMS= 0.67010E-02 Markov E=    -871.697943260320     t=       10.3
 Qu        318 E=    -870.677154485901     steps=  147 RMS= 0.69837E-02 Markov E=    -871.697943260320     t=       10.3
 Qu        319 E=    -868.886613187034     steps=  182 RMS= 0.47656E-02 Markov E=    -870.677154485901     t=       10.3
 Qu        320 E=    -869.772557709938     steps=   93 RMS= 0.53476E-02 Markov E=    -870.677154485901     t=       10.4
 Qu        321 E=    -865.550487270948     steps=  127 RMS= 0.52028E-02 Markov E=    -870.677154485901     t=       10.4
 Qu        322 E=    -847.627377762989     steps=  233 RMS= 0.52174E-02 Markov E=    -870.677154485901     t=       10.4
 Qu        323 E=    -859.534619473982     steps=  324 RMS= 0.47244E-02 Markov E=    -870.677154485901     t=       10.4
 Qu        324 E=    -867.237044562367     steps=  163 RMS= 0.61078E-02 Markov E=    -870.677154485901     t=       10.5
 Qu        325 E=    -870.442343475912     steps=  153 RMS= 0.65463E-02 Markov E=    -870.677154485901     t=       10.5
 Qu        326 E=    -868.303691855712     steps=  165 RMS= 0.57955E-02 Markov E=    -870.442343475912     t=       10.5
 Qu        327 E=    -867.664334938352     steps=  138 RMS= 0.62945E-02 Markov E=    -868.303691855712     t=       10.5
 Qu        328 E=    -857.192073721775     steps=  188 RMS= 0.61981E-02 Markov E=    -867.664334938352     t=       10.6
 Qu        329 E=    -838.481090663562     steps=  316 RMS= 0.63910E-02 Markov E=    -867.664334938352     t=       10.6
 Qu        330 E=    -863.801368339289     steps=  188 RMS= 0.69202E-02 Markov E=    -867.664334938352     t=       10.6
 Qu        331 E=    -836.608165661500     steps=  343 RMS= 0.59994E-02 Markov E=    -867.664334938352     t=       10.7
 Qu        332 E=    -840.808530680026     steps=  287 RMS= 0.55369E-02 Markov E=    -867.664334938352     t=       10.7
 Qu        333 E=    -867.809182143376     steps=  185 RMS= 0.59641E-02 Markov E=    -867.664334938352     t=       10.7
 Qu        334 E=    -862.887951097462     steps=  127 RMS= 0.54221E-02 Markov E=    -867.809182143376     t=       10.8
 Qu        335 E=    -866.909249371771     steps=  198 RMS= 0.58086E-02 Markov E=    -867.809182143376     t=       10.8
 Qu        336 E=    -864.906206424055     steps=  178 RMS= 0.58653E-02 Markov E=    -866.909249371771     t=       10.8
 Qu        337 E=    -854.273860556182     steps=  386 RMS= 0.55542E-02 Markov E=    -866.909249371771     t=       10.9
 Qu        338 E=    -869.438979337801     steps=  184 RMS= 0.63630E-02 Markov E=    -866.909249371771     t=       10.9
 Qu        339 E=    -855.859620285356     steps=  219 RMS= 0.69292E-02 Markov E=    -869.438979337801     t=       10.9
 Qu        340 E=    -843.154297103870     steps=  203 RMS= 0.57746E-02 Markov E=    -869.438979337801     t=       11.0
 Qu        341 E=    -840.838248174132     steps=  305 RMS= 0.61258E-02 Markov E=    -869.438979337801     t=       11.0
 Qu        342 E=    -868.356295976508     steps=  114 RMS= 0.47359E-02 Markov E=    -869.438979337801     t=       11.0
 Qu        343 E=    -840.543501387321     steps=  272 RMS= 0.63919E-02 Markov E=    -869.438979337801     t=       11.0
 Qu        344 E=    -836.760581767073     steps=  245 RMS= 0.64715E-02 Markov E=    -869.438979337801     t=       11.1
 Qu        345 E=    -868.108982089092     steps=  134 RMS= 0.52278E-02 Markov E=    -869.438979337801     t=       11.1
 Qu        346 E=    -852.404927785663     steps=  406 RMS= 0.69658E-02 Markov E=    -868.108982089092     t=       11.2
 Qu        347 E=    -843.241224456009     steps=  360 RMS= 0.61761E-02 Markov E=    -868.108982089092     t=       11.2
 Qu        348 E=    -869.165364231811     steps=  311 RMS= 0.55094E-02 Markov E=    -868.108982089092     t=       11.2
 Qu        349 E=    -860.150165714117     steps=  132 RMS= 0.62581E-02 Markov E=    -869.165364231811     t=       11.3
 Qu        350 E=    -844.806205116038     steps=  184 RMS= 0.59379E-02 Markov E=    -869.165364231811     t=       11.3
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu        351 E=    -844.643941271994     steps=  276 RMS= 0.69905E-02 Markov E=    -869.165364231811     t=       11.3
 Qu        352 E=    -866.542559571850     steps=  104 RMS= 0.53677E-02 Markov E=    -869.165364231811     t=       11.3
 Qu        353 E=    -866.272037955893     steps=  147 RMS= 0.66113E-02 Markov E=    -869.165364231811     t=       11.4
 Qu        354 E=    -867.364770839613     steps=  195 RMS= 0.54116E-02 Markov E=    -869.165364231811     t=       11.4
 Qu        355 E=    -836.781420607129     steps=  190 RMS= 0.69645E-02 Markov E=    -869.165364231811     t=       11.4
 Qu        356 E=    -847.886188115333     steps=  399 RMS= 0.54984E-02 Markov E=    -869.165364231811     t=       11.5
 Qu        357 E=    -869.362100871021     steps=  235 RMS= 0.69968E-02 Markov E=    -869.165364231811     t=       11.5
 Qu        358 E=    -860.974502864998     steps=  135 RMS= 0.55674E-02 Markov E=    -869.362100871021     t=       11.5
 Qu        359 E=    -868.810239542806     steps=  272 RMS= 0.50273E-02 Markov E=    -869.362100871021     t=       11.6
 Qu        360 E=    -864.558683517967     steps=  202 RMS= 0.69689E-02 Markov E=    -868.810239542806     t=       11.6
 Qu        361 E=    -863.431348419844     steps=  109 RMS= 0.66924E-02 Markov E=    -868.810239542806     t=       11.6
 Qu        362 E=    -854.286588860881     steps=  291 RMS= 0.57282E-02 Markov E=    -868.810239542806     t=       11.6
 Qu        363 E=    -854.731775795471     steps=  216 RMS= 0.55202E-02 Markov E=    -868.810239542806     t=       11.7
 Qu        364 E=    -859.076782735390     steps=  400 RMS= 0.54828E-02 Markov E=    -868.810239542806     t=       11.7
 Qu        365 E=    -862.914639595654     steps=  127 RMS= 0.62003E-02 Markov E=    -868.810239542806     t=       11.8
 Qu        366 E=    -868.891054428297     steps=  122 RMS= 0.58277E-02 Markov E=    -868.810239542806     t=       11.8
 Qu        367 E=    -862.051211278368     steps=  194 RMS= 0.61416E-02 Markov E=    -868.891054428297     t=       11.8
 Qu        368 E=    -856.726334488807     steps=  406 RMS= 0.53640E-02 Markov E=    -868.891054428297     t=       11.9
 Qu        369 E=    -868.595299430824     steps=  126 RMS= 0.58462E-02 Markov E=    -868.891054428297     t=       11.9
 Qu        370 E=    -864.436699391328     steps=  158 RMS= 0.57917E-02 Markov E=    -868.891054428297     t=       11.9
 Qu        371 E=    -846.974940903760     steps=  553 RMS= 0.59675E-02 Markov E=    -868.891054428297     t=       12.0
 Qu        372 E=    -862.252469118168     steps=  330 RMS= 0.66395E-02 Markov E=    -868.891054428297     t=       12.0
 Qu        373 E=    -866.280902615360     steps=  210 RMS= 0.50395E-02 Markov E=    -868.891054428297     t=       12.1
 Qu        374 E=    -847.016157284341     steps=  170 RMS= 0.55496E-02 Markov E=    -868.891054428297     t=       12.1
 Qu        375 E=    -868.860867490760     steps=  393 RMS= 0.65959E-02 Markov E=    -868.891054428297     t=       12.1
 Qu        376 E=    -857.549890967517     steps=  201 RMS= 0.62242E-02 Markov E=    -868.860867490760     t=       12.2
 Qu        377 E=    -856.686989827184     steps=  150 RMS= 0.54126E-02 Markov E=    -868.860867490760     t=       12.2
 Qu        378 E=    -863.160440136115     steps=  116 RMS= 0.36501E-02 Markov E=    -868.860867490760     t=       12.2
 Qu        379 E=    -842.970902166565     steps=  298 RMS= 0.64172E-02 Markov E=    -868.860867490760     t=       12.2
 Qu        380 E=    -845.478639303320     steps=  349 RMS= 0.69148E-02 Markov E=    -868.860867490760     t=       12.3
 Qu        381 E=    -864.722397575483     steps=  220 RMS= 0.69657E-02 Markov E=    -868.860867490760     t=       12.3
 Qu        382 E=    -866.567257109209     steps=  106 RMS= 0.42819E-02 Markov E=    -868.860867490760     t=       12.3
 Qu        383 E=    -842.603015953772     steps=  330 RMS= 0.60707E-02 Markov E=    -868.860867490760     t=       12.4
 Qu        384 E=    -837.310317668281     steps=  582 RMS= 0.67290E-02 Markov E=    -868.860867490760     t=       12.5
 Qu        385 E=    -865.217957958464     steps=  100 RMS= 0.58822E-02 Markov E=    -868.860867490760     t=       12.5
 Qu        386 E=    -870.178888736137     steps=  116 RMS= 0.63829E-02 Markov E=    -868.860867490760     t=       12.5
 Qu        387 E=    -850.685371844156     steps=  245 RMS= 0.50316E-02 Markov E=    -870.178888736137     t=       12.5
 Qu        388 E=    -868.944181410162     steps=  214 RMS= 0.47317E-02 Markov E=    -870.178888736137     t=       12.6
 Qu        389 E=    -847.137175678286     steps=  441 RMS= 0.65126E-02 Markov E=    -868.944181410162     t=       12.6
 Qu        390 E=    -855.599589967150     steps=  176 RMS= 0.56784E-02 Markov E=    -868.944181410162     t=       12.6
 Qu        391 E=    -865.277761681474     steps=  151 RMS= 0.50961E-02 Markov E=    -868.944181410162     t=       12.7
 Qu        392 E=    -851.254784399627     steps=  385 RMS= 0.66449E-02 Markov E=    -868.944181410162     t=       12.7
 Qu        393 E=    -863.923953272318     steps=  137 RMS= 0.57963E-02 Markov E=    -868.944181410162     t=       12.7
 Qu        394 E=    -862.785053603126     steps=  122 RMS= 0.64350E-02 Markov E=    -868.944181410162     t=       12.7
 Qu        395 E=    -867.432405421287     steps=  154 RMS= 0.39764E-02 Markov E=    -868.944181410162     t=       12.8
 Qu        396 E=    -869.046160298428     steps=  240 RMS= 0.60537E-02 Markov E=    -868.944181410162     t=       12.8
 Qu        397 E=    -868.834656345001     steps=  116 RMS= 0.46527E-02 Markov E=    -869.046160298428     t=       12.8
 Qu        398 E=    -872.541249231249     steps=  168 RMS= 0.60438E-02 Markov E=    -868.834656345001     t=       12.8
 Qu        399 E=    -870.662997483735     steps=   90 RMS= 0.69371E-02 Markov E=    -872.541249231249     t=       12.9
 Qu        400 E=    -870.178634632999     steps=  179 RMS= 0.60535E-02 Markov E=    -872.541249231249     t=       12.9
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu        401 E=    -865.399508000999     steps=  242 RMS= 0.68953E-02 Markov E=    -872.541249231249     t=       12.9
 Qu        402 E=    -867.784689851389     steps=  214 RMS= 0.59139E-02 Markov E=    -872.541249231249     t=       12.9
 Qu        403 E=    -874.392199766141     steps=  146 RMS= 0.69458E-02 Markov E=    -872.541249231249     t=       13.0
 Qu        404 E=    -868.912960809064     steps=  156 RMS= 0.49694E-02 Markov E=    -874.392199766141     t=       13.0
 Qu        405 E=    -869.941574577487     steps=  123 RMS= 0.60816E-02 Markov E=    -874.392199766141     t=       13.0
 Qu        406 E=    -869.933880497677     steps=  126 RMS= 0.69875E-02 Markov E=    -874.392199766141     t=       13.0
 Qu        407 E=    -866.953253325388     steps=  150 RMS= 0.44473E-02 Markov E=    -874.392199766141     t=       13.0
 Qu        408 E=    -868.830082465860     steps=  112 RMS= 0.49152E-02 Markov E=    -874.392199766141     t=       13.1
 Qu        409 E=    -838.548696542165     steps=  333 RMS= 0.63993E-02 Markov E=    -874.392199766141     t=       13.1
 Qu        410 E=    -867.126411799296     steps=  196 RMS= 0.63129E-02 Markov E=    -874.392199766141     t=       13.1
 Qu        411 E=    -875.405666015331     steps=   99 RMS= 0.59038E-02 Markov E=    -874.392199766141     t=       13.1
 Qu        412 E=    -873.302792893791     steps=  108 RMS= 0.38218E-02 Markov E=    -875.405666015331     t=       13.2
 Qu        413 E=    -867.303417900021     steps=  184 RMS= 0.68296E-02 Markov E=    -875.405666015331     t=       13.2
 Qu        414 E=    -851.686063419841     steps=  238 RMS= 0.66475E-02 Markov E=    -875.405666015331     t=       13.2
 Qu        415 E=    -870.697888647949     steps=  131 RMS= 0.40049E-02 Markov E=    -875.405666015331     t=       13.2
 Qu        416 E=    -872.914356929735     steps=  143 RMS= 0.58853E-02 Markov E=    -875.405666015331     t=       13.3
 Qu        417 E=    -873.170426135801     steps=  134 RMS= 0.66279E-02 Markov E=    -875.405666015331     t=       13.3
 Qu        418 E=    -861.398228265282     steps=  281 RMS= 0.63176E-02 Markov E=    -875.405666015331     t=       13.3
 Qu        419 E=    -850.662919902900     steps=  220 RMS= 0.57870E-02 Markov E=    -875.405666015331     t=       13.3
 Qu        420 E=    -875.417205715025     steps=  155 RMS= 0.51014E-02 Markov E=    -875.405666015331     t=       13.4
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -876.5107668        -875.4491993    
 Qu        421 E=    -876.510766829134     steps=  119 RMS= 0.51964E-02 Markov E=    -875.417205715025     t=       13.4
 Qu        422 E=    -874.210868846262     steps=  270 RMS= 0.64020E-02 Markov E=    -876.510766829134     t=       13.4
 Qu        423 E=    -864.611820991555     steps=  177 RMS= 0.61750E-02 Markov E=    -876.510766829134     t=       13.4
 Qu        424 E=    -854.043765370950     steps=  451 RMS= 0.61239E-02 Markov E=    -876.510766829134     t=       13.5
 Qu        425 E=    -838.793153329455     steps=  390 RMS= 0.48649E-02 Markov E=    -876.510766829134     t=       13.6
 Qu        426 E=    -847.250284195204     steps=  516 RMS= 0.61652E-02 Markov E=    -876.510766829134     t=       13.6
 Qu        427 E=    -854.219100936022     steps=  201 RMS= 0.69222E-02 Markov E=    -876.510766829134     t=       13.7
 Qu        428 E=    -853.501453659722     steps=  293 RMS= 0.69183E-02 Markov E=    -876.510766829134     t=       13.7
 Qu        429 E=    -863.279596686343     steps=  198 RMS= 0.55933E-02 Markov E=    -876.510766829134     t=       13.7
 Qu        430 E=    -875.627983313008     steps=  161 RMS= 0.56117E-02 Markov E=    -876.510766829134     t=       13.8
 Qu        431 E=    -869.834459641096     steps=  231 RMS= 0.62091E-02 Markov E=    -875.627983313008     t=       13.8
 Qu        432 E=    -871.629246727364     steps=  247 RMS= 0.59050E-02 Markov E=    -875.627983313008     t=       13.8
 Qu        433 E=    -856.278325074554     steps=  149 RMS= 0.63597E-02 Markov E=    -875.627983313008     t=       13.8
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -877.5933704        -876.5107668    
 Qu        434 E=    -877.593370449621     steps=  113 RMS= 0.47539E-02 Markov E=    -875.627983313008     t=       13.9
 Qu        435 E=    -875.229272346163     steps=  115 RMS= 0.44044E-02 Markov E=    -877.593370449621     t=       13.9
 Qu        436 E=    -870.396268314687     steps=   89 RMS= 0.63381E-02 Markov E=    -877.593370449621     t=       13.9
 Qu        437 E=    -876.701247134599     steps=   97 RMS= 0.69845E-02 Markov E=    -877.593370449621     t=       13.9
 Qu        438 E=    -857.413629598167     steps=  176 RMS= 0.66887E-02 Markov E=    -877.593370449621     t=       13.9
 Qu        439 E=    -872.060323757646     steps=  166 RMS= 0.61996E-02 Markov E=    -877.593370449621     t=       13.9
 Qu        440 E=    -873.886576744794     steps=  165 RMS= 0.37959E-02 Markov E=    -877.593370449621     t=       14.0
 Qu        441 E=    -848.629227576832     steps=  479 RMS= 0.63588E-02 Markov E=    -877.593370449621     t=       14.0
 Qu        442 E=    -874.296168352215     steps=  229 RMS= 0.66529E-02 Markov E=    -877.593370449621     t=       14.1
 Qu        443 E=    -875.495792851002     steps=  105 RMS= 0.42728E-02 Markov E=    -877.593370449621     t=       14.1
 Qu        444 E=    -867.808339159354     steps=  284 RMS= 0.65591E-02 Markov E=    -877.593370449621     t=       14.1
 Qu        445 E=    -858.924614352956     steps=  301 RMS= 0.59583E-02 Markov E=    -877.593370449621     t=       14.2
 Qu        446 E=    -858.825503496548     steps=  364 RMS= 0.56709E-02 Markov E=    -877.593370449621     t=       14.2
 Qu        447 E=    -848.989825184457     steps=  298 RMS= 0.68097E-02 Markov E=    -877.593370449621     t=       14.3
 Qu        448 E=    -838.042813934082     steps=  230 RMS= 0.62842E-02 Markov E=    -877.593370449621     t=       14.3
 Qu        449 E=    -846.221147831926     steps=  207 RMS= 0.66330E-02 Markov E=    -877.593370449621     t=       14.3
 Qu        450 E=    -871.226347533760     steps=  359 RMS= 0.56651E-02 Markov E=    -877.593370449621     t=       14.4
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu        451 E=    -865.830109380911     steps=  134 RMS= 0.66993E-02 Markov E=    -877.593370449621     t=       14.4
 Qu        452 E=    -841.686215531575     steps=  415 RMS= 0.68607E-02 Markov E=    -877.593370449621     t=       14.4
 Qu        453 E=    -867.406321288134     steps=  120 RMS= 0.42347E-02 Markov E=    -877.593370449621     t=       14.5
 Qu        454 E=    -872.559736737825     steps=  103 RMS= 0.63123E-02 Markov E=    -877.593370449621     t=       14.5
 Qu        455 E=    -867.253593253480     steps=  158 RMS= 0.63164E-02 Markov E=    -877.593370449621     t=       14.5
 Qu        456 E=    -872.119680793281     steps=  179 RMS= 0.63658E-02 Markov E=    -877.593370449621     t=       14.5
 Qu        457 E=    -844.259780303509     steps=  405 RMS= 0.54270E-02 Markov E=    -877.593370449621     t=       14.6
 Qu        458 E=    -868.938274034733     steps=  127 RMS= 0.52888E-02 Markov E=    -877.593370449621     t=       14.6
 Qu        459 E=    -871.731350480634     steps=  119 RMS= 0.64343E-02 Markov E=    -877.593370449621     t=       14.6
 Qu        460 E=    -839.438211086097     steps=  236 RMS= 0.57552E-02 Markov E=    -877.593370449621     t=       14.6
 Qu        461 E=    -844.918774474767     steps=  278 RMS= 0.60310E-02 Markov E=    -877.593370449621     t=       14.7
 Qu        462 E=    -875.710998209151     steps=  137 RMS= 0.58863E-02 Markov E=    -877.593370449621     t=       14.7
 Qu        463 E=    -877.578216973048     steps=  100 RMS= 0.65322E-02 Markov E=    -877.593370449621     t=       14.7
 Qu        464 E=    -874.161156908730     steps=   95 RMS= 0.68247E-02 Markov E=    -877.578216973048     t=       14.7
 Qu        465 E=    -870.082045434064     steps=  165 RMS= 0.68363E-02 Markov E=    -877.578216973048     t=       14.8
 Qu        466 E=    -867.053903456233     steps=  168 RMS= 0.53558E-02 Markov E=    -877.578216973048     t=       14.8
 Qu        467 E=    -852.357921346616     steps=  283 RMS= 0.60875E-02 Markov E=    -877.578216973048     t=       14.8
 Qu        468 E=    -874.015737750737     steps=  110 RMS= 0.69221E-02 Markov E=    -877.578216973048     t=       14.8
 Qu        469 E=    -875.871597313044     steps=   84 RMS= 0.53160E-02 Markov E=    -877.578216973048     t=       14.8
 Qu        470 E=    -874.802640089738     steps=  114 RMS= 0.53205E-02 Markov E=    -877.578216973048     t=       14.9
 Qu        471 E=    -869.125873507304     steps=  189 RMS= 0.67172E-02 Markov E=    -877.578216973048     t=       14.9
 Qu        472 E=    -872.708977658760     steps=  119 RMS= 0.60462E-02 Markov E=    -877.578216973048     t=       14.9
 Qu        473 E=    -841.247156304978     steps=  270 RMS= 0.66097E-02 Markov E=    -877.578216973048     t=       14.9
 Qu        474 E=    -867.556196224639     steps=  228 RMS= 0.65161E-02 Markov E=    -877.578216973048     t=       15.0
 Qu        475 E=    -871.471481683311     steps=  195 RMS= 0.67960E-02 Markov E=    -877.578216973048     t=       15.0
 Qu        476 E=    -873.827111982863     steps=  204 RMS= 0.60720E-02 Markov E=    -877.578216973048     t=       15.0
 Qu        477 E=    -863.008098611859     steps=  158 RMS= 0.69846E-02 Markov E=    -877.578216973048     t=       15.0
 Qu        478 E=    -860.282189036017     steps=  231 RMS= 0.52444E-02 Markov E=    -877.578216973048     t=       15.1
 Qu        479 E=    -842.194900497448     steps=  372 RMS= 0.65982E-02 Markov E=    -877.578216973048     t=       15.1
 Qu        480 E=    -867.930515446522     steps=  372 RMS= 0.58434E-02 Markov E=    -877.578216973048     t=       15.2
 Qu        481 E=    -850.609361827913     steps=  319 RMS= 0.63924E-02 Markov E=    -877.578216973048     t=       15.2
 Qu        482 E=    -846.122648185481     steps=  257 RMS= 0.67778E-02 Markov E=    -877.578216973048     t=       15.3
 Qu        483 E=    -866.221496168946     steps=  273 RMS= 0.67195E-02 Markov E=    -877.578216973048     t=       15.3
 Qu        484 E=    -843.027381565802     steps=  234 RMS= 0.69450E-02 Markov E=    -877.578216973048     t=       15.3
 Qu        485 E=    -877.569607196614     steps=  125 RMS= 0.61647E-02 Markov E=    -877.578216973048     t=       15.4
 Qu        486 E=    -852.577176232991     steps=  324 RMS= 0.57364E-02 Markov E=    -877.569607196614     t=       15.4
 Qu        487 E=    -864.066900686959     steps=  152 RMS= 0.54403E-02 Markov E=    -877.569607196614     t=       15.4
 Qu        488 E=    -871.550507819055     steps=  196 RMS= 0.64667E-02 Markov E=    -877.569607196614     t=       15.4
 Qu        489 E=    -873.349077350495     steps=  136 RMS= 0.61104E-02 Markov E=    -877.569607196614     t=       15.5
 Qu        490 E=    -855.224256238464     steps=  277 RMS= 0.66474E-02 Markov E=    -877.569607196614     t=       15.5
 Qu        491 E=    -842.733424190778     steps=  583 RMS= 0.62255E-02 Markov E=    -877.569607196614     t=       15.6
 Qu        492 E=    -876.350688555027     steps=   77 RMS= 0.51270E-02 Markov E=    -877.569607196614     t=       15.6
 Qu        493 E=    -839.290353964463     steps=  282 RMS= 0.66532E-02 Markov E=    -877.569607196614     t=       15.6
 Qu        494 E=    -833.962540802270     steps=  221 RMS= 0.55562E-02 Markov E=    -877.569607196614     t=       15.7
 Qu        495 E=    -867.598296760111     steps=  158 RMS= 0.66008E-02 Markov E=    -877.569607196614     t=       15.7
 Qu        496 E=    -850.837874703710     steps=  261 RMS= 0.64838E-02 Markov E=    -877.569607196614     t=       15.7
 Qu        497 E=    -871.409140071361     steps=  204 RMS= 0.68405E-02 Markov E=    -877.569607196614     t=       15.7
 Qu        498 E=    -868.318265434413     steps=  199 RMS= 0.52307E-02 Markov E=    -877.569607196614     t=       15.8
 Qu        499 E=    -872.203954743699     steps=  211 RMS= 0.69493E-02 Markov E=    -877.569607196614     t=       15.8
 Qu        500 E=    -875.395789724560     steps=   91 RMS= 0.61645E-02 Markov E=    -877.569607196614     t=       15.8
Acceptance ratio for previous     50 steps=  0.0400  FAC=  1.0500
 Qu        501 E=    -845.958322072678     steps=  511 RMS= 0.68031E-02 Markov E=    -877.569607196614     t=       15.9
 Qu        502 E=    -872.144671542984     steps=  137 RMS= 0.66646E-02 Markov E=    -877.569607196614     t=       15.9
 Qu        503 E=    -866.165863251377     steps=  123 RMS= 0.65513E-02 Markov E=    -877.569607196614     t=       15.9
 Qu        504 E=    -870.936538281735     steps=  164 RMS= 0.58379E-02 Markov E=    -877.569607196614     t=       16.0
 Qu        505 E=    -876.782132782908     steps=  158 RMS= 0.57591E-02 Markov E=    -877.569607196614     t=       16.0
 Qu        506 E=    -872.630126193527     steps=  104 RMS= 0.48328E-02 Markov E=    -876.782132782908     t=       16.0
 Qu        507 E=    -870.986139871809     steps=  135 RMS= 0.59957E-02 Markov E=    -876.782132782908     t=       16.0
 Qu        508 E=    -850.567480094095     steps=  233 RMS= 0.67058E-02 Markov E=    -876.782132782908     t=       16.0
 Qu        509 E=    -870.187464473196     steps=  159 RMS= 0.55464E-02 Markov E=    -876.782132782908     t=       16.1
 Qu        510 E=    -875.593412464937     steps=   93 RMS= 0.43233E-02 Markov E=    -876.782132782908     t=       16.1
 Qu        511 E=    -864.508505981191     steps=  186 RMS= 0.62462E-02 Markov E=    -876.782132782908     t=       16.1
 Qu        512 E=    -846.862500746967     steps=  288 RMS= 0.66706E-02 Markov E=    -876.782132782908     t=       16.1
 Qu        513 E=    -840.819803383011     steps=  332 RMS= 0.62117E-02 Markov E=    -876.782132782908     t=       16.2
 Qu        514 E=    -868.371653317121     steps=  166 RMS= 0.68389E-02 Markov E=    -876.782132782908     t=       16.2
 Qu        515 E=    -873.774815833111     steps=  141 RMS= 0.45802E-02 Markov E=    -876.782132782908     t=       16.2
 Qu        516 E=    -876.432031123860     steps=  102 RMS= 0.60686E-02 Markov E=    -876.782132782908     t=       16.2
 Qu        517 E=    -859.911928767959     steps=  264 RMS= 0.61592E-02 Markov E=    -876.432031123860     t=       16.3
 Qu        518 E=    -870.415437608022     steps=  127 RMS= 0.62416E-02 Markov E=    -876.432031123860     t=       16.3
 Qu        519 E=    -865.279713429224     steps=  108 RMS= 0.49054E-02 Markov E=    -876.432031123860     t=       16.3
 Qu        520 E=    -867.283714637438     steps=  265 RMS= 0.68595E-02 Markov E=    -876.432031123860     t=       16.4
 Qu        521 E=    -844.379106058281     steps=  490 RMS= 0.67187E-02 Markov E=    -876.432031123860     t=       16.4
 Qu        522 E=    -874.160669364931     steps=  184 RMS= 0.42171E-02 Markov E=    -876.432031123860     t=       16.4
 Qu        523 E=    -872.852460444928     steps=  135 RMS= 0.59794E-02 Markov E=    -876.432031123860     t=       16.5
 Qu        524 E=    -872.699953994389     steps=   94 RMS= 0.57412E-02 Markov E=    -876.432031123860     t=       16.5
 Qu        525 E=    -869.053040849802     steps=  160 RMS= 0.57684E-02 Markov E=    -876.432031123860     t=       16.5
 Qu        526 E=    -863.126313677611     steps=  162 RMS= 0.53803E-02 Markov E=    -876.432031123860     t=       16.5
 Qu        527 E=    -871.501300452639     steps=  239 RMS= 0.51104E-02 Markov E=    -876.432031123860     t=       16.6
 Qu        528 E=    -876.431984334954     steps=   91 RMS= 0.61953E-02 Markov E=    -876.432031123860     t=       16.6
 Qu        529 E=    -844.758721143356     steps=  297 RMS= 0.67595E-02 Markov E=    -876.431984334954     t=       16.6
 Qu        530 E=    -871.578247919111     steps=  171 RMS= 0.69169E-02 Markov E=    -876.431984334954     t=       16.6
 Qu        531 E=    -850.680105806638     steps=  205 RMS= 0.53181E-02 Markov E=    -876.431984334954     t=       16.7
 Qu        532 E=    -865.838749272803     steps=  138 RMS= 0.46139E-02 Markov E=    -876.431984334954     t=       16.7
 Qu        533 E=    -875.895378245985     steps=  205 RMS= 0.52234E-02 Markov E=    -876.431984334954     t=       16.7
 Qu        534 E=    -868.472635089432     steps=  149 RMS= 0.64613E-02 Markov E=    -875.895378245985     t=       16.7
 Qu        535 E=    -873.596451712560     steps=  104 RMS= 0.57669E-02 Markov E=    -875.895378245985     t=       16.7
 Qu        536 E=    -869.383202895742     steps=  192 RMS= 0.61804E-02 Markov E=    -875.895378245985     t=       16.8
 Qu        537 E=    -877.008865675568     steps=  126 RMS= 0.46760E-02 Markov E=    -875.895378245985     t=       16.8
 Qu        538 E=    -867.965637608848     steps=  118 RMS= 0.67609E-02 Markov E=    -877.008865675568     t=       16.8
 Qu        539 E=    -872.141404942087     steps=  114 RMS= 0.61213E-02 Markov E=    -877.008865675568     t=       16.8
 Qu        540 E=    -844.239054189010     steps=  193 RMS= 0.62420E-02 Markov E=    -877.008865675568     t=       16.9
 Qu        541 E=    -867.478062048972     steps=  131 RMS= 0.69626E-02 Markov E=    -877.008865675568     t=       16.9
 Qu        542 E=    -875.895915058446     steps=   93 RMS= 0.55578E-02 Markov E=    -877.008865675568     t=       16.9
 Qu        543 E=    -872.310436316634     steps=  119 RMS= 0.69600E-02 Markov E=    -877.008865675568     t=       16.9
 Qu        544 E=    -869.779131951103     steps=  165 RMS= 0.62169E-02 Markov E=    -877.008865675568     t=       16.9
 Qu        545 E=    -844.365866091949     steps=  548 RMS= 0.69557E-02 Markov E=    -877.008865675568     t=       17.0
 Qu        546 E=    -845.255567083664     steps=  352 RMS= 0.68854E-02 Markov E=    -877.008865675568     t=       17.1
 Qu        547 E=    -870.236957572456     steps=  154 RMS= 0.62576E-02 Markov E=    -877.008865675568     t=       17.1
 Qu        548 E=    -845.492882088962     steps=  258 RMS= 0.63816E-02 Markov E=    -877.008865675568     t=       17.1
 Qu        549 E=    -835.243976347227     steps=  239 RMS= 0.66457E-02 Markov E=    -877.008865675568     t=       17.1
 Qu        550 E=    -863.389601425879     steps=  219 RMS= 0.58445E-02 Markov E=    -877.008865675568     t=       17.2
Acceptance ratio for previous     50 steps=  0.1000  FAC=  1.0500
 Qu        551 E=    -873.164179943930     steps=  105 RMS= 0.67716E-02 Markov E=    -877.008865675568     t=       17.2
 Qu        552 E=    -872.605999473869     steps=  190 RMS= 0.42423E-02 Markov E=    -877.008865675568     t=       17.2
 Qu        553 E=    -867.997741198111     steps=  249 RMS= 0.58593E-02 Markov E=    -877.008865675568     t=       17.2
 Qu        554 E=    -863.749770629241     steps=  138 RMS= 0.60957E-02 Markov E=    -877.008865675568     t=       17.3
 Qu        555 E=    -869.599511474861     steps=  153 RMS= 0.60320E-02 Markov E=    -877.008865675568     t=       17.3
 Qu        556 E=    -872.936458122774     steps=  105 RMS= 0.51758E-02 Markov E=    -877.008865675568     t=       17.3
 Qu        557 E=    -875.895923594055     steps=  135 RMS= 0.69653E-02 Markov E=    -877.008865675568     t=       17.3
 Qu        558 E=    -875.078573759991     steps=  100 RMS= 0.50800E-02 Markov E=    -875.895923594055     t=       17.3
 Qu        559 E=    -872.175688415137     steps=   94 RMS= 0.63603E-02 Markov E=    -875.895923594055     t=       17.4
 Qu        560 E=    -871.089038525787     steps=  115 RMS= 0.68472E-02 Markov E=    -875.895923594055     t=       17.4
 Qu        561 E=    -873.842798260795     steps=  125 RMS= 0.51155E-02 Markov E=    -875.895923594055     t=       17.4
 Qu        562 E=    -873.038275443766     steps=   90 RMS= 0.54805E-02 Markov E=    -875.895923594055     t=       17.4
 Qu        563 E=    -841.590763235035     steps=  325 RMS= 0.42920E-02 Markov E=    -875.895923594055     t=       17.4
 Qu        564 E=    -852.561907176709     steps=  247 RMS= 0.65285E-02 Markov E=    -875.895923594055     t=       17.5
 Qu        565 E=    -862.359723620211     steps=  235 RMS= 0.65010E-02 Markov E=    -875.895923594055     t=       17.5
 Qu        566 E=    -859.538004945868     steps=  336 RMS= 0.67839E-02 Markov E=    -875.895923594055     t=       17.6
 Qu        567 E=    -870.064710659205     steps=  168 RMS= 0.55047E-02 Markov E=    -875.895923594055     t=       17.6
 Qu        568 E=    -875.699437103724     steps=  132 RMS= 0.63380E-02 Markov E=    -875.895923594055     t=       17.6
 Qu        569 E=    -867.409065074361     steps=  157 RMS= 0.68760E-02 Markov E=    -875.699437103724     t=       17.6
 Qu        570 E=    -872.710032658581     steps=  187 RMS= 0.58377E-02 Markov E=    -875.699437103724     t=       17.6
 Qu        571 E=    -874.224385196851     steps=  199 RMS= 0.68373E-02 Markov E=    -875.699437103724     t=       17.7
 Qu        572 E=    -872.007405002127     steps=  122 RMS= 0.65137E-02 Markov E=    -874.224385196851     t=       17.7
 Qu        573 E=    -868.652658494826     steps=   94 RMS= 0.46042E-02 Markov E=    -872.007405002127     t=       17.7
 Qu        574 E=    -870.772486810324     steps=   97 RMS= 0.44411E-02 Markov E=    -872.007405002127     t=       17.7
 Qu        575 E=    -837.388343631371     steps=  294 RMS= 0.56494E-02 Markov E=    -872.007405002127     t=       17.8
 Qu        576 E=    -871.004519880926     steps=  109 RMS= 0.58964E-02 Markov E=    -872.007405002127     t=       17.8
 Qu        577 E=    -870.914424378721     steps=  118 RMS= 0.65662E-02 Markov E=    -871.004519880926     t=       17.8
 Qu        578 E=    -861.680931504037     steps=  134 RMS= 0.53219E-02 Markov E=    -870.914424378721     t=       17.8
 Qu        579 E=    -871.589590317475     steps=  228 RMS= 0.57301E-02 Markov E=    -870.914424378721     t=       17.8
 Qu        580 E=    -869.825668474058     steps=  161 RMS= 0.49561E-02 Markov E=    -871.589590317475     t=       17.9
 Qu        581 E=    -860.826829061179     steps=  177 RMS= 0.62811E-02 Markov E=    -871.589590317475     t=       17.9
 Qu        582 E=    -867.740179065357     steps=  109 RMS= 0.68849E-02 Markov E=    -871.589590317475     t=       17.9
 Qu        583 E=    -866.414711916196     steps=  176 RMS= 0.69286E-02 Markov E=    -871.589590317475     t=       17.9
 Qu        584 E=    -871.521305232261     steps=   96 RMS= 0.51250E-02 Markov E=    -871.589590317475     t=       17.9
 Qu        585 E=    -853.929952851757     steps=  662 RMS= 0.69826E-02 Markov E=    -871.521305232261     t=       18.0
 Qu        586 E=    -872.576511516528     steps=  170 RMS= 0.69573E-02 Markov E=    -871.521305232261     t=       18.0
 Qu        587 E=    -845.433141295437     steps=  410 RMS= 0.51702E-02 Markov E=    -872.576511516528     t=       18.1
 Qu        588 E=    -861.205651854596     steps=  343 RMS= 0.42242E-02 Markov E=    -872.576511516528     t=       18.2
 Qu        589 E=    -864.305954253712     steps=  356 RMS= 0.66210E-02 Markov E=    -872.576511516528     t=       18.2
 Qu        590 E=    -867.539248186764     steps=  143 RMS= 0.56516E-02 Markov E=    -872.576511516528     t=       18.2
 Qu        591 E=    -869.062555031588     steps=  210 RMS= 0.62216E-02 Markov E=    -872.576511516528     t=       18.3
 Qu        592 E=    -869.240147523859     steps=  219 RMS= 0.61819E-02 Markov E=    -872.576511516528     t=       18.3
 Qu        593 E=    -867.616743004664     steps=  146 RMS= 0.56724E-02 Markov E=    -872.576511516528     t=       18.3
 Qu        594 E=    -861.244939501839     steps=  125 RMS= 0.65061E-02 Markov E=    -872.576511516528     t=       18.3
 Qu        595 E=    -867.538719007073     steps=  110 RMS= 0.68039E-02 Markov E=    -872.576511516528     t=       18.3
 Qu        596 E=    -869.608729370987     steps=  105 RMS= 0.66912E-02 Markov E=    -872.576511516528     t=       18.4
 Qu        597 E=    -871.593217691811     steps=  126 RMS= 0.67061E-02 Markov E=    -872.576511516528     t=       18.4
 Qu        598 E=    -866.804946161934     steps=  162 RMS= 0.62049E-02 Markov E=    -871.593217691811     t=       18.4
 Qu        599 E=    -860.941022274098     steps=  275 RMS= 0.61586E-02 Markov E=    -871.593217691811     t=       18.4
 Qu        600 E=    -874.312561091798     steps=  152 RMS= 0.34450E-02 Markov E=    -871.593217691811     t=       18.5
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu        601 E=    -855.316955676884     steps=  271 RMS= 0.65082E-02 Markov E=    -874.312561091798     t=       18.5
 Qu        602 E=    -836.897934103257     steps=  184 RMS= 0.68053E-02 Markov E=    -874.312561091798     t=       18.5
 Qu        603 E=    -845.370044118475     steps=  290 RMS= 0.62566E-02 Markov E=    -874.312561091798     t=       18.6
 Qu        604 E=    -842.406577176952     steps=  350 RMS= 0.58411E-02 Markov E=    -874.312561091798     t=       18.6
 Qu        605 E=    -851.958047046474     steps=  370 RMS= 0.55017E-02 Markov E=    -874.312561091798     t=       18.7
 Qu        606 E=    -861.763816812742     steps=  217 RMS= 0.54691E-02 Markov E=    -874.312561091798     t=       18.7
 Qu        607 E=    -870.706493567110     steps=  392 RMS= 0.66449E-02 Markov E=    -874.312561091798     t=       18.7
 Qu        608 E=    -867.170340260831     steps=  428 RMS= 0.64818E-02 Markov E=    -874.312561091798     t=       18.8
 Qu        609 E=    -863.439937935110     steps=  269 RMS= 0.67602E-02 Markov E=    -874.312561091798     t=       18.8
 Qu        610 E=    -841.855586517667     steps=  240 RMS= 0.62922E-02 Markov E=    -874.312561091798     t=       18.9
 Qu        611 E=    -869.105652862032     steps=  412 RMS= 0.69802E-02 Markov E=    -874.312561091798     t=       18.9
 Qu        612 E=    -875.583801197333     steps=  124 RMS= 0.69360E-02 Markov E=    -874.312561091798     t=       19.0
 Qu        613 E=    -863.670397885099     steps=  152 RMS= 0.52872E-02 Markov E=    -875.583801197333     t=       19.0
 Qu        614 E=    -866.420903621639     steps=  148 RMS= 0.44872E-02 Markov E=    -875.583801197333     t=       19.0
 Qu        615 E=    -844.649953667905     steps=  216 RMS= 0.56549E-02 Markov E=    -875.583801197333     t=       19.0
 Qu        616 E=    -868.430656586826     steps=  138 RMS= 0.68966E-02 Markov E=    -875.583801197333     t=       19.0
 Qu        617 E=    -855.366652507790     steps=  315 RMS= 0.53580E-02 Markov E=    -875.583801197333     t=       19.1
 Qu        618 E=    -851.436663569403     steps=  464 RMS= 0.69101E-02 Markov E=    -875.583801197333     t=       19.2
 Qu        619 E=    -868.538832223561     steps=  193 RMS= 0.60540E-02 Markov E=    -875.583801197333     t=       19.2
 Qu        620 E=    -865.398255982517     steps=  165 RMS= 0.57431E-02 Markov E=    -875.583801197333     t=       19.2
 Qu        621 E=    -861.001933149640     steps=  264 RMS= 0.57584E-02 Markov E=    -875.583801197333     t=       19.2
 Qu        622 E=    -845.557818113752     steps=  338 RMS= 0.64111E-02 Markov E=    -875.583801197333     t=       19.3
 Qu        623 E=    -872.134693069890     steps=  113 RMS= 0.64878E-02 Markov E=    -875.583801197333     t=       19.3
 Qu        624 E=    -843.920723854382     steps=  392 RMS= 0.64193E-02 Markov E=    -875.583801197333     t=       19.4
 Qu        625 E=    -873.360379810320     steps=  319 RMS= 0.67885E-02 Markov E=    -875.583801197333     t=       19.4
 Qu        626 E=    -875.667625322516     steps=  122 RMS= 0.63873E-02 Markov E=    -875.583801197333     t=       19.4
 Qu        627 E=    -866.044433943702     steps=  233 RMS= 0.62083E-02 Markov E=    -875.667625322516     t=       19.4
 Qu        628 E=    -875.962821806978     steps=  107 RMS= 0.69979E-02 Markov E=    -875.667625322516     t=       19.5
 Qu        629 E=    -871.210628209963     steps=  100 RMS= 0.63070E-02 Markov E=    -875.962821806978     t=       19.5
 Qu        630 E=    -875.399445042118     steps=  101 RMS= 0.63703E-02 Markov E=    -875.962821806978     t=       19.5
 Qu        631 E=    -869.388174816677     steps=  281 RMS= 0.65324E-02 Markov E=    -875.399445042118     t=       19.5
 Qu        632 E=    -868.218660101640     steps=  227 RMS= 0.69194E-02 Markov E=    -875.399445042118     t=       19.6
 Qu        633 E=    -860.659026748273     steps=  195 RMS= 0.67434E-02 Markov E=    -875.399445042118     t=       19.6
 Qu        634 E=    -860.895026600353     steps=  159 RMS= 0.59533E-02 Markov E=    -875.399445042118     t=       19.6
 Qu        635 E=    -872.703921749867     steps=  118 RMS= 0.66269E-02 Markov E=    -875.399445042118     t=       19.6
 Qu        636 E=    -863.251699363844     steps=  264 RMS= 0.62346E-02 Markov E=    -872.703921749867     t=       19.7
 Qu        637 E=    -869.600289781793     steps=  107 RMS= 0.66366E-02 Markov E=    -872.703921749867     t=       19.7
 Qu        638 E=    -839.088522049057     steps=  196 RMS= 0.57153E-02 Markov E=    -872.703921749867     t=       19.7
 Qu        639 E=    -872.071512216289     steps=  286 RMS= 0.69561E-02 Markov E=    -872.703921749867     t=       19.7
 Qu        640 E=    -844.363037751485     steps=  255 RMS= 0.60379E-02 Markov E=    -872.071512216289     t=       19.8
 Qu        641 E=    -857.736453666939     steps=  164 RMS= 0.56960E-02 Markov E=    -872.071512216289     t=       19.8
 Qu        642 E=    -874.280488721460     steps=  125 RMS= 0.59670E-02 Markov E=    -872.071512216289     t=       19.8
 Qu        643 E=    -869.858239050030     steps=  106 RMS= 0.69808E-02 Markov E=    -874.280488721460     t=       19.8
 Qu        644 E=    -873.651925250644     steps=  219 RMS= 0.68849E-02 Markov E=    -874.280488721460     t=       19.9
 Qu        645 E=    -874.602871802488     steps=  123 RMS= 0.63351E-02 Markov E=    -873.651925250644     t=       19.9
 Qu        646 E=    -858.167880435143     steps=  381 RMS= 0.63896E-02 Markov E=    -874.602871802488     t=       19.9
 Qu        647 E=    -867.270622910557     steps=  155 RMS= 0.62695E-02 Markov E=    -874.602871802488     t=       20.0
 Qu        648 E=    -842.503686298083     steps=  347 RMS= 0.66727E-02 Markov E=    -874.602871802488     t=       20.0
 Qu        649 E=    -846.182300567131     steps=  271 RMS= 0.60639E-02 Markov E=    -874.602871802488     t=       20.0
 Qu        650 E=    -876.739964424170     steps=  147 RMS= 0.64284E-02 Markov E=    -874.602871802488     t=       20.1
Acceptance ratio for previous     50 steps=  0.2000  FAC=  1.0500
 Qu        651 E=    -872.670018384833     steps=  161 RMS= 0.44681E-02 Markov E=    -876.739964424170     t=       20.1
 Qu        652 E=    -877.203066369500     steps=  118 RMS= 0.65754E-02 Markov E=    -876.739964424170     t=       20.1
 Qu        653 E=    -868.704713154286     steps=  196 RMS= 0.43297E-02 Markov E=    -877.203066369500     t=       20.1
 Qu        654 E=    -844.655845443981     steps=  262 RMS= 0.64153E-02 Markov E=    -877.203066369500     t=       20.2
 Qu        655 E=    -873.197513977463     steps=   77 RMS= 0.59769E-02 Markov E=    -877.203066369500     t=       20.2
 Qu        656 E=    -874.607248804414     steps=  111 RMS= 0.53397E-02 Markov E=    -877.203066369500     t=       20.2
 Qu        657 E=    -861.937287929918     steps=  174 RMS= 0.66177E-02 Markov E=    -874.607248804414     t=       20.2
 Qu        658 E=    -874.549088614505     steps=  120 RMS= 0.57872E-02 Markov E=    -874.607248804414     t=       20.2
 Qu        659 E=    -872.101873634513     steps=  171 RMS= 0.69452E-02 Markov E=    -874.549088614505     t=       20.3
 Qu        660 E=    -866.392055699981     steps=  189 RMS= 0.56366E-02 Markov E=    -874.549088614505     t=       20.3
 Qu        661 E=    -854.508971656365     steps=  287 RMS= 0.66384E-02 Markov E=    -874.549088614505     t=       20.3
 Qu        662 E=    -872.760595931466     steps=  129 RMS= 0.59493E-02 Markov E=    -874.549088614505     t=       20.3
 Qu        663 E=    -872.265571461336     steps=  150 RMS= 0.67419E-02 Markov E=    -874.549088614505     t=       20.4
 Qu        664 E=    -866.568674157516     steps=  165 RMS= 0.62975E-02 Markov E=    -874.549088614505     t=       20.4
 Qu        665 E=    -859.926797794173     steps=  198 RMS= 0.69628E-02 Markov E=    -874.549088614505     t=       20.4
 Qu        666 E=    -866.212963716026     steps=  171 RMS= 0.64862E-02 Markov E=    -874.549088614505     t=       20.4
 Qu        667 E=    -870.324872948042     steps=  134 RMS= 0.69077E-02 Markov E=    -874.549088614505     t=       20.5
 Qu        668 E=    -872.909831379262     steps=  140 RMS= 0.61032E-02 Markov E=    -874.549088614505     t=       20.5
 Qu        669 E=    -853.841336616855     steps=  199 RMS= 0.68458E-02 Markov E=    -872.909831379262     t=       20.5
 Qu        670 E=    -859.467867895885     steps=  187 RMS= 0.65840E-02 Markov E=    -872.909831379262     t=       20.5
 Qu        671 E=    -852.135515614011     steps=  214 RMS= 0.63898E-02 Markov E=    -872.909831379262     t=       20.6
 Qu        672 E=    -869.431979860940     steps=  176 RMS= 0.64646E-02 Markov E=    -872.909831379262     t=       20.6
 Qu        673 E=    -858.091489633814     steps=  175 RMS= 0.58896E-02 Markov E=    -872.909831379262     t=       20.6
 Qu        674 E=    -845.257515257012     steps=  336 RMS= 0.66356E-02 Markov E=    -872.909831379262     t=       20.7
 Qu        675 E=    -869.627928972835     steps=  157 RMS= 0.64512E-02 Markov E=    -872.909831379262     t=       20.7
 Qu        676 E=    -861.575309023951     steps=  230 RMS= 0.51355E-02 Markov E=    -872.909831379262     t=       20.7
 Qu        677 E=    -868.248617725475     steps=  215 RMS= 0.51321E-02 Markov E=    -872.909831379262     t=       20.7
 Qu        678 E=    -870.376598987258     steps=  202 RMS= 0.62424E-02 Markov E=    -872.909831379262     t=       20.8
 Qu        679 E=    -844.796016051878     steps=  312 RMS= 0.55061E-02 Markov E=    -872.909831379262     t=       20.8
 Qu        680 E=    -872.790236373759     steps=   93 RMS= 0.65643E-02 Markov E=    -872.909831379262     t=       20.8
 Qu        681 E=    -872.626437813474     steps=  135 RMS= 0.61702E-02 Markov E=    -872.790236373759     t=       20.8
 Qu        682 E=    -872.468621323804     steps=  108 RMS= 0.69836E-02 Markov E=    -872.790236373759     t=       20.9
 Qu        683 E=    -866.237653877743     steps=  166 RMS= 0.49388E-02 Markov E=    -872.468621323804     t=       20.9
 Qu        684 E=    -869.725819135858     steps=  130 RMS= 0.60025E-02 Markov E=    -872.468621323804     t=       20.9
 Qu        685 E=    -845.717207375659     steps=  249 RMS= 0.62576E-02 Markov E=    -872.468621323804     t=       20.9
 Qu        686 E=    -865.500042501646     steps=  204 RMS= 0.66306E-02 Markov E=    -872.468621323804     t=       21.0
 Qu        687 E=    -869.447414863117     steps=  321 RMS= 0.62130E-02 Markov E=    -872.468621323804     t=       21.0
 Qu        688 E=    -870.436584853813     steps=  195 RMS= 0.52014E-02 Markov E=    -869.447414863117     t=       21.0
 Qu        689 E=    -869.206029693324     steps=   99 RMS= 0.44254E-02 Markov E=    -870.436584853813     t=       21.1
 Qu        690 E=    -872.026697369889     steps=  167 RMS= 0.62714E-02 Markov E=    -870.436584853813     t=       21.1
 Qu        691 E=    -841.988446957057     steps=  210 RMS= 0.61780E-02 Markov E=    -872.026697369889     t=       21.1
 Qu        692 E=    -867.060306510496     steps=  193 RMS= 0.53821E-02 Markov E=    -872.026697369889     t=       21.1
 Qu        693 E=    -864.850904643077     steps=  224 RMS= 0.55835E-02 Markov E=    -872.026697369889     t=       21.2
 Qu        694 E=    -849.271751849827     steps=  371 RMS= 0.69416E-02 Markov E=    -872.026697369889     t=       21.2
 Qu        695 E=    -868.645039452765     steps=  202 RMS= 0.56104E-02 Markov E=    -872.026697369889     t=       21.2
 Qu        696 E=    -844.530378536910     steps=  211 RMS= 0.63421E-02 Markov E=    -872.026697369889     t=       21.3
 Qu        697 E=    -871.274208472103     steps=  128 RMS= 0.54615E-02 Markov E=    -872.026697369889     t=       21.3
 Qu        698 E=    -868.215693733205     steps=  156 RMS= 0.61733E-02 Markov E=    -872.026697369889     t=       21.3
 Qu        699 E=    -845.337499292180     steps=  775 RMS= 0.66256E-02 Markov E=    -872.026697369889     t=       21.4
 Qu        700 E=    -865.353574610695     steps=  183 RMS= 0.40445E-02 Markov E=    -872.026697369889     t=       21.4
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu        701 E=    -866.358670944450     steps=  178 RMS= 0.48436E-02 Markov E=    -872.026697369889     t=       21.5
 Qu        702 E=    -850.617683366666     steps=  357 RMS= 0.62027E-02 Markov E=    -872.026697369889     t=       21.5
 Qu        703 E=    -872.590720284040     steps=  205 RMS= 0.69726E-02 Markov E=    -872.026697369889     t=       21.5
 Qu        704 E=    -847.143316396936     steps=  329 RMS= 0.61566E-02 Markov E=    -872.590720284040     t=       21.6
 Qu        705 E=    -869.300246931872     steps=  237 RMS= 0.58997E-02 Markov E=    -872.590720284040     t=       21.6
 Qu        706 E=    -838.903415460625     steps=  240 RMS= 0.68282E-02 Markov E=    -872.590720284040     t=       21.7
 Qu        707 E=    -861.887190140462     steps=  142 RMS= 0.61630E-02 Markov E=    -872.590720284040     t=       21.7
 Qu        708 E=    -845.121957671246     steps=  242 RMS= 0.52838E-02 Markov E=    -872.590720284040     t=       21.7
 Qu        709 E=    -853.164132511980     steps=  584 RMS= 0.65597E-02 Markov E=    -872.590720284040     t=       21.8
 Qu        710 E=    -863.336063773478     steps=  179 RMS= 0.54270E-02 Markov E=    -872.590720284040     t=       21.8
 Qu        711 E=    -849.205393150681     steps=  515 RMS= 0.65807E-02 Markov E=    -872.590720284040     t=       21.9
 Qu        712 E=    -842.483415901530     steps=  266 RMS= 0.66093E-02 Markov E=    -872.590720284040     t=       21.9
 Qu        713 E=    -840.797405912027     steps=  229 RMS= 0.56682E-02 Markov E=    -872.590720284040     t=       22.0
 Qu        714 E=    -862.952764009176     steps=  209 RMS= 0.53807E-02 Markov E=    -872.590720284040     t=       22.0
 Qu        715 E=    -869.632371067566     steps=  372 RMS= 0.66876E-02 Markov E=    -872.590720284040     t=       22.0
 Qu        716 E=    -870.626567215270     steps=  146 RMS= 0.53260E-02 Markov E=    -872.590720284040     t=       22.1
 Qu        717 E=    -860.377803100851     steps=  384 RMS= 0.68639E-02 Markov E=    -872.590720284040     t=       22.1
 Qu        718 E=    -867.253438381886     steps=  119 RMS= 0.65439E-02 Markov E=    -872.590720284040     t=       22.1
 Qu        719 E=    -870.769392500220     steps=  137 RMS= 0.67503E-02 Markov E=    -872.590720284040     t=       22.1
 Qu        720 E=    -866.297785057630     steps=  153 RMS= 0.63873E-02 Markov E=    -872.590720284040     t=       22.2
 Qu        721 E=    -853.151808408340     steps=  315 RMS= 0.62970E-02 Markov E=    -872.590720284040     t=       22.2
 Qu        722 E=    -870.980258753264     steps=  117 RMS= 0.55876E-02 Markov E=    -872.590720284040     t=       22.2
 Qu        723 E=    -853.490863824671     steps=  302 RMS= 0.67154E-02 Markov E=    -872.590720284040     t=       22.3
 Qu        724 E=    -866.466448305259     steps=  134 RMS= 0.66950E-02 Markov E=    -872.590720284040     t=       22.3
 Qu        725 E=    -860.093560945128     steps=  138 RMS= 0.66414E-02 Markov E=    -872.590720284040     t=       22.3
 Qu        726 E=    -865.431463762228     steps=  321 RMS= 0.65138E-02 Markov E=    -872.590720284040     t=       22.4
 Qu        727 E=    -843.008421569062     steps=  397 RMS= 0.68026E-02 Markov E=    -872.590720284040     t=       22.4
 Qu        728 E=    -871.245038689188     steps=  157 RMS= 0.63919E-02 Markov E=    -872.590720284040     t=       22.4
 Qu        729 E=    -848.336482003861     steps=  321 RMS= 0.64847E-02 Markov E=    -872.590720284040     t=       22.5
 Qu        730 E=    -844.972377913171     steps=  258 RMS= 0.56203E-02 Markov E=    -872.590720284040     t=       22.5
 Qu        731 E=    -864.130898500962     steps=  143 RMS= 0.42783E-02 Markov E=    -872.590720284040     t=       22.5
 Qu        732 E=    -869.618845176279     steps=  104 RMS= 0.65284E-02 Markov E=    -872.590720284040     t=       22.5
 Qu        733 E=    -874.491906039034     steps=  148 RMS= 0.66640E-02 Markov E=    -872.590720284040     t=       22.6
 Qu        734 E=    -843.213556838350     steps=  354 RMS= 0.66457E-02 Markov E=    -874.491906039034     t=       22.6
 Qu        735 E=    -861.185902906840     steps=  104 RMS= 0.63130E-02 Markov E=    -874.491906039034     t=       22.6
 Qu        736 E=    -862.829282923240     steps=  148 RMS= 0.64156E-02 Markov E=    -874.491906039034     t=       22.6
 Qu        737 E=    -873.052827739357     steps=  115 RMS= 0.47188E-02 Markov E=    -874.491906039034     t=       22.7
 Qu        738 E=    -870.158283110744     steps=  130 RMS= 0.61310E-02 Markov E=    -874.491906039034     t=       22.7
 Qu        739 E=    -871.067643700300     steps=  111 RMS= 0.59469E-02 Markov E=    -874.491906039034     t=       22.7
 Qu        740 E=    -866.724480893200     steps=  289 RMS= 0.56223E-02 Markov E=    -874.491906039034     t=       22.7
 Qu        741 E=    -871.181548308141     steps=  142 RMS= 0.57700E-02 Markov E=    -874.491906039034     t=       22.8
 Qu        742 E=    -869.983190576566     steps=  141 RMS= 0.67144E-02 Markov E=    -874.491906039034     t=       22.8
 Qu        743 E=    -846.393294376054     steps=  375 RMS= 0.57960E-02 Markov E=    -874.491906039034     t=       22.8
 Qu        744 E=    -862.759857601076     steps=  277 RMS= 0.64313E-02 Markov E=    -874.491906039034     t=       22.9
 Qu        745 E=    -873.165431811193     steps=   88 RMS= 0.57696E-02 Markov E=    -874.491906039034     t=       22.9
 Qu        746 E=    -866.990450459245     steps=  297 RMS= 0.64144E-02 Markov E=    -874.491906039034     t=       22.9
 Qu        747 E=    -846.480904608879     steps=  394 RMS= 0.67776E-02 Markov E=    -874.491906039034     t=       23.0
 Qu        748 E=    -869.751336759029     steps=  139 RMS= 0.66799E-02 Markov E=    -874.491906039034     t=       23.0
 Qu        749 E=    -874.046289254811     steps=   83 RMS= 0.58483E-02 Markov E=    -874.491906039034     t=       23.0
 Qu        750 E=    -870.483347562935     steps=   98 RMS= 0.54581E-02 Markov E=    -874.046289254811     t=       23.0
Acceptance ratio for previous     50 steps=  0.0600  FAC=  1.0500
 Qu        751 E=    -874.641504057483     steps=  135 RMS= 0.59375E-02 Markov E=    -874.046289254811     t=       23.0
 Qu        752 E=    -872.853081569624     steps=  152 RMS= 0.43429E-02 Markov E=    -874.641504057483     t=       23.1
 Qu        753 E=    -866.633002198530     steps=  178 RMS= 0.56504E-02 Markov E=    -874.641504057483     t=       23.1
 Qu        754 E=    -870.808157594696     steps=  154 RMS= 0.68778E-02 Markov E=    -874.641504057483     t=       23.1
 Qu        755 E=    -853.974318668209     steps=  224 RMS= 0.58428E-02 Markov E=    -874.641504057483     t=       23.1
 Qu        756 E=    -861.549550903894     steps=  341 RMS= 0.67351E-02 Markov E=    -874.641504057483     t=       23.2
 Qu        757 E=    -871.833595553387     steps=  311 RMS= 0.58069E-02 Markov E=    -874.641504057483     t=       23.2
 Qu        758 E=    -873.699949944756     steps=   88 RMS= 0.56007E-02 Markov E=    -874.641504057483     t=       23.2
 Qu        759 E=    -869.386185911277     steps=  106 RMS= 0.65026E-02 Markov E=    -874.641504057483     t=       23.3
 Qu        760 E=    -872.700848592163     steps=  310 RMS= 0.41897E-02 Markov E=    -874.641504057483     t=       23.3
 Qu        761 E=    -872.779915972835     steps=  253 RMS= 0.60641E-02 Markov E=    -874.641504057483     t=       23.3
 Qu        762 E=    -862.894420666120     steps=  143 RMS= 0.64878E-02 Markov E=    -872.779915972835     t=       23.4
 Qu        763 E=    -853.767974593136     steps=  406 RMS= 0.43928E-02 Markov E=    -872.779915972835     t=       23.4
 Qu        764 E=    -842.375428263173     steps=  445 RMS= 0.66571E-02 Markov E=    -872.779915972835     t=       23.5
 Qu        765 E=    -842.936218147586     steps=  426 RMS= 0.66557E-02 Markov E=    -872.779915972835     t=       23.5
 Qu        766 E=    -867.073415151593     steps=  307 RMS= 0.64111E-02 Markov E=    -872.779915972835     t=       23.6
 Qu        767 E=    -861.233247985120     steps=  320 RMS= 0.56418E-02 Markov E=    -872.779915972835     t=       23.6
 Qu        768 E=    -870.452343248194     steps=  103 RMS= 0.68764E-02 Markov E=    -872.779915972835     t=       23.6
 Qu        769 E=    -867.947692959210     steps=  130 RMS= 0.50271E-02 Markov E=    -872.779915972835     t=       23.6
 Qu        770 E=    -868.362999453265     steps=  168 RMS= 0.57173E-02 Markov E=    -872.779915972835     t=       23.7
 Qu        771 E=    -868.923835616298     steps=  128 RMS= 0.45624E-02 Markov E=    -872.779915972835     t=       23.7
 Qu        772 E=    -857.397045173275     steps=  219 RMS= 0.65627E-02 Markov E=    -872.779915972835     t=       23.7
 Qu        773 E=    -857.386417773029     steps=  165 RMS= 0.65262E-02 Markov E=    -872.779915972835     t=       23.7
 Qu        774 E=    -843.826446413965     steps=  409 RMS= 0.54795E-02 Markov E=    -872.779915972835     t=       23.8
 Qu        775 E=    -849.405266228302     steps=  340 RMS= 0.53981E-02 Markov E=    -872.779915972835     t=       23.8
 Qu        776 E=    -867.905195738493     steps=  127 RMS= 0.55121E-02 Markov E=    -872.779915972835     t=       23.9
 Qu        777 E=    -870.157652918561     steps=  101 RMS= 0.42809E-02 Markov E=    -872.779915972835     t=       23.9
 Qu        778 E=    -870.445526279157     steps=  253 RMS= 0.44772E-02 Markov E=    -872.779915972835     t=       23.9
 Qu        779 E=    -869.274403372674     steps=  234 RMS= 0.52605E-02 Markov E=    -872.779915972835     t=       23.9
 Qu        780 E=    -856.714734813249     steps=  271 RMS= 0.63615E-02 Markov E=    -869.274403372674     t=       24.0
 Qu        781 E=    -842.951072244195     steps=  312 RMS= 0.49442E-02 Markov E=    -869.274403372674     t=       24.0
 Qu        782 E=    -857.961037832529     steps=  221 RMS= 0.69809E-02 Markov E=    -869.274403372674     t=       24.1
 Qu        783 E=    -861.795585079346     steps=  482 RMS= 0.60600E-02 Markov E=    -869.274403372674     t=       24.1
 Qu        784 E=    -864.106825565054     steps=  151 RMS= 0.66539E-02 Markov E=    -869.274403372674     t=       24.1
 Qu        785 E=    -866.567662822601     steps=  126 RMS= 0.60532E-02 Markov E=    -869.274403372674     t=       24.2
 Qu        786 E=    -865.400493740381     steps=  311 RMS= 0.56799E-02 Markov E=    -869.274403372674     t=       24.2
 Qu        787 E=    -846.572150535846     steps=  261 RMS= 0.64804E-02 Markov E=    -869.274403372674     t=       24.2
 Qu        788 E=    -866.408676958725     steps=  111 RMS= 0.65775E-02 Markov E=    -869.274403372674     t=       24.3
 Qu        789 E=    -866.057896373106     steps=  213 RMS= 0.50630E-02 Markov E=    -869.274403372674     t=       24.3
 Qu        790 E=    -845.978016501000     steps=  319 RMS= 0.65171E-02 Markov E=    -869.274403372674     t=       24.3
 Qu        791 E=    -847.324589092162     steps=  160 RMS= 0.53067E-02 Markov E=    -869.274403372674     t=       24.3
 Qu        792 E=    -864.568587139292     steps=  167 RMS= 0.60902E-02 Markov E=    -869.274403372674     t=       24.4
 Qu        793 E=    -840.745607833480     steps=  237 RMS= 0.60415E-02 Markov E=    -869.274403372674     t=       24.4
 Qu        794 E=    -839.840394864680     steps=  221 RMS= 0.69902E-02 Markov E=    -869.274403372674     t=       24.4
 Qu        795 E=    -843.716555689510     steps=  347 RMS= 0.65858E-02 Markov E=    -869.274403372674     t=       24.5
 Qu        796 E=    -856.935066713280     steps=  151 RMS= 0.65642E-02 Markov E=    -869.274403372674     t=       24.5
 Qu        797 E=    -846.191183143653     steps=  367 RMS= 0.48393E-02 Markov E=    -869.274403372674     t=       24.6
 Qu        798 E=    -858.261196201766     steps=  174 RMS= 0.57203E-02 Markov E=    -869.274403372674     t=       24.6
 Qu        799 E=    -868.866306790184     steps=  255 RMS= 0.65104E-02 Markov E=    -869.274403372674     t=       24.6
 Qu        800 E=    -846.761985244210     steps=  426 RMS= 0.62401E-02 Markov E=    -868.866306790184     t=       24.7
Acceptance ratio for previous     50 steps=  0.0800  FAC=  1.0500
 Qu        801 E=    -858.615994455078     steps=  367 RMS= 0.59715E-02 Markov E=    -868.866306790184     t=       24.7
 Qu        802 E=    -858.466600266199     steps=  183 RMS= 0.64271E-02 Markov E=    -868.866306790184     t=       24.7
 Qu        803 E=    -841.423729353020     steps=  257 RMS= 0.69196E-02 Markov E=    -868.866306790184     t=       24.8
 Qu        804 E=    -864.580316252809     steps=   99 RMS= 0.63267E-02 Markov E=    -868.866306790184     t=       24.8
 Qu        805 E=    -862.570472531688     steps=  250 RMS= 0.66815E-02 Markov E=    -868.866306790184     t=       24.8
 Qu        806 E=    -858.597722947502     steps=  246 RMS= 0.55285E-02 Markov E=    -868.866306790184     t=       24.9
 Qu        807 E=    -841.951572159010     steps=  361 RMS= 0.61224E-02 Markov E=    -868.866306790184     t=       24.9
 Qu        808 E=    -850.839281580682     steps=  171 RMS= 0.67390E-02 Markov E=    -868.866306790184     t=       24.9
 Qu        809 E=    -863.350962131113     steps=  207 RMS= 0.51623E-02 Markov E=    -868.866306790184     t=       25.0
 Qu        810 E=    -868.364990257953     steps=  101 RMS= 0.58223E-02 Markov E=    -868.866306790184     t=       25.0
 Qu        811 E=    -868.738968286298     steps=  145 RMS= 0.69560E-02 Markov E=    -868.364990257953     t=       25.0
 Qu        812 E=    -854.556418566755     steps=  332 RMS= 0.47040E-02 Markov E=    -868.738968286298     t=       25.0
 Qu        813 E=    -860.221460373523     steps=  149 RMS= 0.62091E-02 Markov E=    -868.738968286298     t=       25.1
 Qu        814 E=    -867.594909218848     steps=  124 RMS= 0.65732E-02 Markov E=    -868.738968286298     t=       25.1
 Qu        815 E=    -839.495891515749     steps=  300 RMS= 0.62772E-02 Markov E=    -868.738968286298     t=       25.1
 Qu        816 E=    -843.035936261865     steps=  509 RMS= 0.60377E-02 Markov E=    -868.738968286298     t=       25.2
 Qu        817 E=    -870.947627085768     steps=  232 RMS= 0.50710E-02 Markov E=    -868.738968286298     t=       25.2
 Qu        818 E=    -869.180971604535     steps=  106 RMS= 0.67595E-02 Markov E=    -870.947627085768     t=       25.2
 Qu        819 E=    -839.769995832603     steps=  408 RMS= 0.68237E-02 Markov E=    -870.947627085768     t=       25.3
 Qu        820 E=    -866.954373459149     steps=  105 RMS= 0.56148E-02 Markov E=    -870.947627085768     t=       25.3
 Qu        821 E=    -867.721725973345     steps=  126 RMS= 0.63675E-02 Markov E=    -866.954373459149     t=       25.3
 Qu        822 E=    -863.954325827649     steps=  150 RMS= 0.69767E-02 Markov E=    -867.721725973345     t=       25.4
 Qu        823 E=    -867.753226110619     steps=  122 RMS= 0.62863E-02 Markov E=    -867.721725973345     t=       25.4
 Qu        824 E=    -861.099376659934     steps=  181 RMS= 0.66080E-02 Markov E=    -867.753226110619     t=       25.4
 Qu        825 E=    -847.223372394381     steps=  250 RMS= 0.57228E-02 Markov E=    -867.753226110619     t=       25.4
 Qu        826 E=    -865.781584052364     steps=  179 RMS= 0.67934E-02 Markov E=    -867.753226110619     t=       25.5
 Qu        827 E=    -868.167028568893     steps=  124 RMS= 0.56388E-02 Markov E=    -865.781584052364     t=       25.5
 Qu        828 E=    -850.832111386283     steps=  552 RMS= 0.57525E-02 Markov E=    -868.167028568893     t=       25.6
 Qu        829 E=    -862.685393820301     steps=  157 RMS= 0.53396E-02 Markov E=    -868.167028568893     t=       25.6
 Qu        830 E=    -860.430237482887     steps=  147 RMS= 0.69416E-02 Markov E=    -868.167028568893     t=       25.6
 Qu        831 E=    -845.241356148893     steps=  566 RMS= 0.62651E-02 Markov E=    -868.167028568893     t=       25.7
 Qu        832 E=    -856.118055241164     steps=  307 RMS= 0.49501E-02 Markov E=    -868.167028568893     t=       25.7
 Qu        833 E=    -842.421998210270     steps=  220 RMS= 0.54971E-02 Markov E=    -868.167028568893     t=       25.8
 Qu        834 E=    -848.007812495919     steps=  205 RMS= 0.60115E-02 Markov E=    -868.167028568893     t=       25.8
 Qu        835 E=    -862.913751367211     steps=  259 RMS= 0.54326E-02 Markov E=    -868.167028568893     t=       25.8
 Qu        836 E=    -867.614281540080     steps=  134 RMS= 0.59870E-02 Markov E=    -868.167028568893     t=       25.8
 Qu        837 E=    -862.258013048157     steps=  151 RMS= 0.54254E-02 Markov E=    -867.614281540080     t=       25.9
 Qu        838 E=    -867.687220384719     steps=  144 RMS= 0.55996E-02 Markov E=    -867.614281540080     t=       25.9
 Qu        839 E=    -867.687662760343     steps=  133 RMS= 0.41045E-02 Markov E=    -867.687220384719     t=       25.9
 Qu        840 E=    -863.614582772090     steps=  166 RMS= 0.61092E-02 Markov E=    -867.687662760343     t=       25.9
 Qu        841 E=    -857.094315812945     steps=  151 RMS= 0.60808E-02 Markov E=    -867.687662760343     t=       25.9
 Qu        842 E=    -862.414486614084     steps=  182 RMS= 0.59109E-02 Markov E=    -867.687662760343     t=       26.0
 Qu        843 E=    -848.009018207735     steps=  581 RMS= 0.65627E-02 Markov E=    -867.687662760343     t=       26.0
 Qu        844 E=    -869.810946783541     steps=  146 RMS= 0.40387E-02 Markov E=    -867.687662760343     t=       26.1
 Qu        845 E=    -845.802532551001     steps=  342 RMS= 0.62741E-02 Markov E=    -869.810946783541     t=       26.1
 Qu        846 E=    -859.877562846977     steps=  185 RMS= 0.69791E-02 Markov E=    -869.810946783541     t=       26.1
 Qu        847 E=    -871.826026213371     steps=  195 RMS= 0.69895E-02 Markov E=    -869.810946783541     t=       26.2
 Qu        848 E=    -864.913511239280     steps=  126 RMS= 0.43174E-02 Markov E=    -871.826026213371     t=       26.2
 Qu        849 E=    -868.129232089266     steps=  204 RMS= 0.39343E-02 Markov E=    -871.826026213371     t=       26.2
 Qu        850 E=    -862.102352881177     steps=  150 RMS= 0.57115E-02 Markov E=    -871.826026213371     t=       26.2
Acceptance ratio for previous     50 steps=  0.2600  FAC=  1.0500
 Qu        851 E=    -867.351954546650     steps=  266 RMS= 0.62854E-02 Markov E=    -871.826026213371     t=       26.3
 Qu        852 E=    -864.260946488374     steps=  297 RMS= 0.59875E-02 Markov E=    -871.826026213371     t=       26.3
 Qu        853 E=    -846.640381307508     steps=  239 RMS= 0.69639E-02 Markov E=    -871.826026213371     t=       26.3
 Qu        854 E=    -871.780985720568     steps=  151 RMS= 0.51169E-02 Markov E=    -871.826026213371     t=       26.4
 Qu        855 E=    -864.868784239419     steps=  120 RMS= 0.69317E-02 Markov E=    -871.780985720568     t=       26.4
 Qu        856 E=    -855.767123968469     steps=  241 RMS= 0.59813E-02 Markov E=    -871.780985720568     t=       26.4
 Qu        857 E=    -868.252662099458     steps=  158 RMS= 0.52740E-02 Markov E=    -871.780985720568     t=       26.4
 Qu        858 E=    -868.506634835134     steps=  101 RMS= 0.47269E-02 Markov E=    -871.780985720568     t=       26.5
 Qu        859 E=    -869.666857625685     steps=  227 RMS= 0.67267E-02 Markov E=    -871.780985720568     t=       26.5
 Qu        860 E=    -841.412319243249     steps=  438 RMS= 0.51933E-02 Markov E=    -871.780985720568     t=       26.6
 Qu        861 E=    -847.766419398215     steps=  276 RMS= 0.67271E-02 Markov E=    -871.780985720568     t=       26.6
 Qu        862 E=    -841.057152076697     steps=  359 RMS= 0.61863E-02 Markov E=    -871.780985720568     t=       26.6
 Qu        863 E=    -857.486120716892     steps=  185 RMS= 0.57672E-02 Markov E=    -871.780985720568     t=       26.7
 Qu        864 E=    -855.135704226995     steps=  415 RMS= 0.68468E-02 Markov E=    -871.780985720568     t=       26.7
 Qu        865 E=    -854.740885782984     steps=  233 RMS= 0.66474E-02 Markov E=    -871.780985720568     t=       26.8
 Qu        866 E=    -842.260219939695     steps=  499 RMS= 0.68111E-02 Markov E=    -871.780985720568     t=       26.8
 Qu        867 E=    -858.872636962365     steps=  149 RMS= 0.63323E-02 Markov E=    -871.780985720568     t=       26.9
 Qu        868 E=    -860.963582822377     steps=  405 RMS= 0.49627E-02 Markov E=    -871.780985720568     t=       26.9
 Qu        869 E=    -865.651700306679     steps=  132 RMS= 0.50943E-02 Markov E=    -871.780985720568     t=       26.9
 Qu        870 E=    -854.194401055023     steps=  254 RMS= 0.69153E-02 Markov E=    -871.780985720568     t=       27.0
 Qu        871 E=    -844.869046232984     steps=  213 RMS= 0.57324E-02 Markov E=    -871.780985720568     t=       27.0
 Qu        872 E=    -873.129526542436     steps=  105 RMS= 0.62032E-02 Markov E=    -871.780985720568     t=       27.0
 Qu        873 E=    -872.569948151112     steps=  152 RMS= 0.62307E-02 Markov E=    -873.129526542436     t=       27.0
 Qu        874 E=    -861.390890091664     steps=  257 RMS= 0.57755E-02 Markov E=    -873.129526542436     t=       27.1
 Qu        875 E=    -866.248220053433     steps=  220 RMS= 0.63285E-02 Markov E=    -873.129526542436     t=       27.1
 Qu        876 E=    -875.170005451238     steps=  147 RMS= 0.51411E-02 Markov E=    -873.129526542436     t=       27.1
 Qu        877 E=    -872.632675650508     steps=  168 RMS= 0.63011E-02 Markov E=    -875.170005451238     t=       27.2
 Qu        878 E=    -870.885612298680     steps=  114 RMS= 0.54305E-02 Markov E=    -875.170005451238     t=       27.2
 Qu        879 E=    -841.564396931525     steps=  354 RMS= 0.57353E-02 Markov E=    -875.170005451238     t=       27.2
 Qu        880 E=    -848.404769269914     steps=  456 RMS= 0.64716E-02 Markov E=    -875.170005451238     t=       27.3
 Qu        881 E=    -870.870804157231     steps=  185 RMS= 0.57431E-02 Markov E=    -875.170005451238     t=       27.3
 Qu        882 E=    -855.681224275133     steps=  400 RMS= 0.58401E-02 Markov E=    -875.170005451238     t=       27.4
 Qu        883 E=    -873.416625104490     steps=   99 RMS= 0.64201E-02 Markov E=    -875.170005451238     t=       27.4
 Qu        884 E=    -869.040219153936     steps=  112 RMS= 0.67070E-02 Markov E=    -875.170005451238     t=       27.4
 Qu        885 E=    -870.272574338187     steps=  144 RMS= 0.54611E-02 Markov E=    -875.170005451238     t=       27.4
 Qu        886 E=    -871.138980171764     steps=   95 RMS= 0.59499E-02 Markov E=    -875.170005451238     t=       27.4
 Qu        887 E=    -849.790885590955     steps=  174 RMS= 0.58148E-02 Markov E=    -875.170005451238     t=       27.5
 Qu        888 E=    -864.075521403396     steps=  222 RMS= 0.62230E-02 Markov E=    -875.170005451238     t=       27.5
 Qu        889 E=    -869.856453742163     steps=  127 RMS= 0.67326E-02 Markov E=    -875.170005451238     t=       27.5
 Qu        890 E=    -844.626118784494     steps=  462 RMS= 0.60573E-02 Markov E=    -875.170005451238     t=       27.6
 Qu        891 E=    -876.396504286755     steps=  114 RMS= 0.65972E-02 Markov E=    -875.170005451238     t=       27.6
 Qu        892 E=    -843.604578899442     steps=  311 RMS= 0.57503E-02 Markov E=    -876.396504286755     t=       27.6
 Qu        893 E=    -868.390429331760     steps=  264 RMS= 0.52531E-02 Markov E=    -876.396504286755     t=       27.7
 Qu        894 E=    -877.416870988106     steps=   97 RMS= 0.57052E-02 Markov E=    -876.396504286755     t=       27.7
 Qu        895 E=    -873.157301016205     steps=  113 RMS= 0.64914E-02 Markov E=    -877.416870988106     t=       27.7
 Qu        896 E=    -871.818123653074     steps=  257 RMS= 0.57424E-02 Markov E=    -877.416870988106     t=       27.7
 Qu        897 E=    -849.483777756290     steps=  393 RMS= 0.66593E-02 Markov E=    -871.818123653074     t=       27.8
 Qu        898 E=    -866.733025784929     steps=  126 RMS= 0.68857E-02 Markov E=    -871.818123653074     t=       27.8
 Qu        899 E=    -861.994306814090     steps=  167 RMS= 0.59009E-02 Markov E=    -871.818123653074     t=       27.8
 Qu        900 E=    -874.108099909227     steps=  113 RMS= 0.57140E-02 Markov E=    -871.818123653074     t=       27.8
Acceptance ratio for previous     50 steps=  0.1400  FAC=  1.0500
 Qu        901 E=    -846.454605113676     steps=  234 RMS= 0.66665E-02 Markov E=    -874.108099909227     t=       27.9
 Qu        902 E=    -874.516226539063     steps=  177 RMS= 0.49028E-02 Markov E=    -874.108099909227     t=       27.9
 Qu        903 E=    -873.414675995200     steps=  219 RMS= 0.68142E-02 Markov E=    -874.516226539063     t=       27.9
 Qu        904 E=    -850.140597456826     steps=  258 RMS= 0.46421E-02 Markov E=    -874.516226539063     t=       28.0
 Qu        905 E=    -869.173982783341     steps=  390 RMS= 0.53259E-02 Markov E=    -874.516226539063     t=       28.0
 Qu        906 E=    -875.557810587550     steps=  115 RMS= 0.61520E-02 Markov E=    -874.516226539063     t=       28.0
 Qu        907 E=    -870.161000677577     steps=  358 RMS= 0.65644E-02 Markov E=    -875.557810587550     t=       28.1
 Qu        908 E=    -855.778688386546     steps=  400 RMS= 0.52201E-02 Markov E=    -875.557810587550     t=       28.1
 Qu        909 E=    -873.694828054966     steps=  272 RMS= 0.45121E-02 Markov E=    -875.557810587550     t=       28.2
 Qu        910 E=    -842.099146247974     steps=  248 RMS= 0.54121E-02 Markov E=    -875.557810587550     t=       28.2
 Qu        911 E=    -866.333345502337     steps=   85 RMS= 0.54290E-02 Markov E=    -875.557810587550     t=       28.2
 Qu        912 E=    -853.559100339499     steps=  520 RMS= 0.59676E-02 Markov E=    -875.557810587550     t=       28.3
 Qu        913 E=    -866.997115029964     steps=  193 RMS= 0.64394E-02 Markov E=    -875.557810587550     t=       28.3
 Qu        914 E=    -873.796631815287     steps=  116 RMS= 0.55887E-02 Markov E=    -875.557810587550     t=       28.4
 Qu        915 E=    -869.179145310063     steps=  144 RMS= 0.51911E-02 Markov E=    -875.557810587550     t=       28.4
 Qu        916 E=    -871.995617861104     steps=  149 RMS= 0.59880E-02 Markov E=    -875.557810587550     t=       28.4
 Qu        917 E=    -852.989348751067     steps=  358 RMS= 0.56029E-02 Markov E=    -875.557810587550     t=       28.4
 Qu        918 E=    -846.090320567920     steps=  365 RMS= 0.60967E-02 Markov E=    -875.557810587550     t=       28.5
 Qu        919 E=    -867.010114727243     steps=  153 RMS= 0.64559E-02 Markov E=    -875.557810587550     t=       28.5
 Qu        920 E=    -865.937718928154     steps=  120 RMS= 0.49466E-02 Markov E=    -875.557810587550     t=       28.5
 Qu        921 E=    -851.897927495177     steps=  318 RMS= 0.66188E-02 Markov E=    -875.557810587550     t=       28.6
 Qu        922 E=    -849.899583479746     steps=  295 RMS= 0.58788E-02 Markov E=    -875.557810587550     t=       28.6
 Qu        923 E=    -841.722933503661     steps=  206 RMS= 0.57250E-02 Markov E=    -875.557810587550     t=       28.6
 Qu        924 E=    -872.132852813536     steps=   99 RMS= 0.66817E-02 Markov E=    -875.557810587550     t=       28.7
 Qu        925 E=    -872.945314274414     steps=  114 RMS= 0.63919E-02 Markov E=    -875.557810587550     t=       28.7
 Qu        926 E=    -844.582101934019     steps=  378 RMS= 0.69234E-02 Markov E=    -875.557810587550     t=       28.7
 Qu        927 E=    -846.738057839461     steps=  487 RMS= 0.67687E-02 Markov E=    -875.557810587550     t=       28.8
 Qu        928 E=    -874.485118583437     steps=  142 RMS= 0.59074E-02 Markov E=    -875.557810587550     t=       28.8
 Qu        929 E=    -874.807444761873     steps=  147 RMS= 0.59954E-02 Markov E=    -875.557810587550     t=       28.8
 Qu        930 E=    -869.939745932195     steps=  116 RMS= 0.59754E-02 Markov E=    -875.557810587550     t=       28.9
 Qu        931 E=    -869.224790233112     steps=  293 RMS= 0.64618E-02 Markov E=    -875.557810587550     t=       28.9
 Qu        932 E=    -860.773085504608     steps=  191 RMS= 0.53714E-02 Markov E=    -875.557810587550     t=       28.9
 Qu        933 E=    -873.487358218931     steps=  235 RMS= 0.50444E-02 Markov E=    -875.557810587550     t=       29.0
 Qu        934 E=    -842.125744091995     steps=  380 RMS= 0.62158E-02 Markov E=    -875.557810587550     t=       29.0
 Qu        935 E=    -870.174078958524     steps=  166 RMS= 0.53618E-02 Markov E=    -875.557810587550     t=       29.0
 Qu        936 E=    -848.075636613635     steps=  302 RMS= 0.53111E-02 Markov E=    -875.557810587550     t=       29.1
 Qu        937 E=    -845.831993014981     steps=  335 RMS= 0.61875E-02 Markov E=    -875.557810587550     t=       29.1
 Qu        938 E=    -853.898786259311     steps=  462 RMS= 0.60242E-02 Markov E=    -875.557810587550     t=       29.2
 Qu        939 E=    -873.187310449978     steps=  131 RMS= 0.52797E-02 Markov E=    -875.557810587550     t=       29.2
 Qu        940 E=    -836.911659881944     steps=  196 RMS= 0.66611E-02 Markov E=    -875.557810587550     t=       29.2
 Qu        941 E=    -868.444947309872     steps=  200 RMS= 0.64793E-02 Markov E=    -875.557810587550     t=       29.3
 Qu        942 E=    -863.914710574306     steps=  208 RMS= 0.67719E-02 Markov E=    -875.557810587550     t=       29.3
 Qu        943 E=    -869.916005653332     steps=  100 RMS= 0.54147E-02 Markov E=    -875.557810587550     t=       29.3
 Qu        944 E=    -872.211287944982     steps=  113 RMS= 0.43421E-02 Markov E=    -875.557810587550     t=       29.3
 Qu        945 E=    -865.319738831079     steps=  255 RMS= 0.68944E-02 Markov E=    -875.557810587550     t=       29.3
 Qu        946 E=    -870.870900055162     steps=  111 RMS= 0.60329E-02 Markov E=    -875.557810587550     t=       29.4
 Qu        947 E=    -873.425890560325     steps=  146 RMS= 0.67587E-02 Markov E=    -875.557810587550     t=       29.4
 Qu        948 E=    -870.227943431458     steps=  163 RMS= 0.61668E-02 Markov E=    -875.557810587550     t=       29.4
 Qu        949 E=    -841.073708248005     steps=  369 RMS= 0.54884E-02 Markov E=    -875.557810587550     t=       29.5
 Qu        950 E=    -845.603210264534     steps=  299 RMS= 0.64741E-02 Markov E=    -875.557810587550     t=       29.5
Acceptance ratio for previous     50 steps=  0.0400  FAC=  1.0500
 Qu        951 E=    -871.457321425471     steps=  110 RMS= 0.56333E-02 Markov E=    -875.557810587550     t=       29.5
 Qu        952 E=    -870.062555277022     steps=  179 RMS= 0.58549E-02 Markov E=    -875.557810587550     t=       29.5
 Qu        953 E=    -871.573581428907     steps=  124 RMS= 0.57462E-02 Markov E=    -875.557810587550     t=       29.6
 Qu        954 E=    -873.109795891140     steps=  151 RMS= 0.51681E-02 Markov E=    -875.557810587550     t=       29.6
 Qu        955 E=    -872.420480006813     steps=  130 RMS= 0.55172E-02 Markov E=    -875.557810587550     t=       29.6
 Qu        956 E=    -860.590515208092     steps=  258 RMS= 0.67326E-02 Markov E=    -875.557810587550     t=       29.6
 Qu        957 E=    -870.837545507483     steps=  110 RMS= 0.63703E-02 Markov E=    -875.557810587550     t=       29.6
 Qu        958 E=    -865.696732215378     steps=  322 RMS= 0.51140E-02 Markov E=    -875.557810587550     t=       29.7
 Qu        959 E=    -853.065295020059     steps=  214 RMS= 0.60620E-02 Markov E=    -875.557810587550     t=       29.7
 Qu        960 E=    -869.724466273360     steps=  152 RMS= 0.58398E-02 Markov E=    -875.557810587550     t=       29.7
 Qu        961 E=    -873.381010855225     steps=  192 RMS= 0.65246E-02 Markov E=    -875.557810587550     t=       29.8
 Qu        962 E=    -865.832441826938     steps=   83 RMS= 0.61598E-02 Markov E=    -875.557810587550     t=       29.8
 Qu        963 E=    -868.877881674220     steps=  154 RMS= 0.60538E-02 Markov E=    -875.557810587550     t=       29.8
 Qu        964 E=    -868.313262295643     steps=  155 RMS= 0.36812E-02 Markov E=    -875.557810587550     t=       29.8
 Qu        965 E=    -869.594162026352     steps=  344 RMS= 0.63276E-02 Markov E=    -875.557810587550     t=       29.9
 Qu        966 E=    -846.290058421565     steps=  225 RMS= 0.60425E-02 Markov E=    -875.557810587550     t=       29.9
 Qu        967 E=    -871.192896494127     steps=   97 RMS= 0.68771E-02 Markov E=    -875.557810587550     t=       29.9
 Qu        968 E=    -868.160872586472     steps=  126 RMS= 0.69121E-02 Markov E=    -875.557810587550     t=       29.9
 Qu        969 E=    -857.545500216856     steps=  371 RMS= 0.60947E-02 Markov E=    -875.557810587550     t=       30.0
 Qu        970 E=    -858.776325188984     steps=  347 RMS= 0.50197E-02 Markov E=    -875.557810587550     t=       30.0
 Qu        971 E=    -864.724531103302     steps=  245 RMS= 0.63708E-02 Markov E=    -875.557810587550     t=       30.1
 Qu        972 E=    -863.783946084559     steps=  190 RMS= 0.62945E-02 Markov E=    -875.557810587550     t=       30.1
 Qu        973 E=    -873.082014632422     steps=  122 RMS= 0.59348E-02 Markov E=    -875.557810587550     t=       30.1
 Qu        974 E=    -874.525783419330     steps=  135 RMS= 0.55469E-02 Markov E=    -875.557810587550     t=       30.1
 Qu        975 E=    -846.784920532490     steps=  149 RMS= 0.66960E-02 Markov E=    -874.525783419330     t=       30.2
 Qu        976 E=    -869.415290290420     steps=  146 RMS= 0.61719E-02 Markov E=    -874.525783419330     t=       30.2
 Qu        977 E=    -867.541090801647     steps=  132 RMS= 0.32077E-02 Markov E=    -874.525783419330     t=       30.2
 Qu        978 E=    -865.487793567209     steps=  107 RMS= 0.51568E-02 Markov E=    -874.525783419330     t=       30.2
 Qu        979 E=    -867.612258159445     steps=  113 RMS= 0.68058E-02 Markov E=    -874.525783419330     t=       30.2
 Qu        980 E=    -851.278730083405     steps=  471 RMS= 0.64424E-02 Markov E=    -874.525783419330     t=       30.3
 Qu        981 E=    -875.518007857866     steps=  195 RMS= 0.57958E-02 Markov E=    -874.525783419330     t=       30.3
 Qu        982 E=    -873.691896961778     steps=  124 RMS= 0.61943E-02 Markov E=    -875.518007857866     t=       30.3
 Qu        983 E=    -872.163878330117     steps=   97 RMS= 0.60645E-02 Markov E=    -875.518007857866     t=       30.3
 Qu        984 E=    -840.946358931869     steps=  358 RMS= 0.68687E-02 Markov E=    -875.518007857866     t=       30.4
 Qu        985 E=    -875.256256031113     steps=  144 RMS= 0.68492E-02 Markov E=    -875.518007857866     t=       30.4
 Qu        986 E=    -873.932655860698     steps=   87 RMS= 0.60452E-02 Markov E=    -875.256256031113     t=       30.4
 Qu        987 E=    -848.097419049909     steps=  352 RMS= 0.58106E-02 Markov E=    -875.256256031113     t=       30.5
 Qu        988 E=    -872.683510317223     steps=  100 RMS= 0.57463E-02 Markov E=    -875.256256031113     t=       30.5
 Qu        989 E=    -873.301121565796     steps=  128 RMS= 0.50565E-02 Markov E=    -875.256256031113     t=       30.5
 Qu        990 E=    -844.352603902509     steps=  275 RMS= 0.66822E-02 Markov E=    -875.256256031113     t=       30.5
 Qu        991 E=    -847.305423374651     steps=  340 RMS= 0.64520E-02 Markov E=    -875.256256031113     t=       30.6
 Qu        992 E=    -871.162330268422     steps=   88 RMS= 0.62603E-02 Markov E=    -875.256256031113     t=       30.6
 Qu        993 E=    -873.366320885643     steps=  158 RMS= 0.68748E-02 Markov E=    -875.256256031113     t=       30.6
 Qu        994 E=    -854.831420113851     steps=  296 RMS= 0.68709E-02 Markov E=    -875.256256031113     t=       30.7
 Qu        995 E=    -872.948035967311     steps=  141 RMS= 0.43144E-02 Markov E=    -875.256256031113     t=       30.7
 Qu        996 E=    -870.929916530595     steps=   88 RMS= 0.69262E-02 Markov E=    -875.256256031113     t=       30.7
 Qu        997 E=    -874.242934733275     steps=  169 RMS= 0.67409E-02 Markov E=    -875.256256031113     t=       30.7
 Qu        998 E=    -870.381204414838     steps=   98 RMS= 0.61817E-02 Markov E=    -875.256256031113     t=       30.7
 Qu        999 E=    -873.784711083798     steps=  104 RMS= 0.68874E-02 Markov E=    -875.256256031113     t=       30.7
 Qu       1000 E=    -852.557404275168     steps=  198 RMS= 0.57650E-02 Markov E=    -875.256256031113     t=       30.8
Acceptance ratio for previous     50 steps=  0.0600  FAC=  1.0500
 Qu       1001 E=    -873.033403945900     steps=  162 RMS= 0.54296E-02 Markov E=    -875.256256031113     t=       30.8
 Qu       1002 E=    -868.796275259029     steps=  185 RMS= 0.52196E-02 Markov E=    -875.256256031113     t=       30.8
 Qu       1003 E=    -855.854007556538     steps=  374 RMS= 0.64933E-02 Markov E=    -875.256256031113     t=       30.9
 Qu       1004 E=    -866.624929359407     steps=  193 RMS= 0.43242E-02 Markov E=    -875.256256031113     t=       30.9
 Qu       1005 E=    -870.374493197393     steps=  227 RMS= 0.56167E-02 Markov E=    -875.256256031113     t=       30.9
 Qu       1006 E=    -871.142274762310     steps=  125 RMS= 0.65648E-02 Markov E=    -875.256256031113     t=       31.0
 Qu       1007 E=    -874.292207567315     steps=  131 RMS= 0.65051E-02 Markov E=    -875.256256031113     t=       31.0
 Qu       1008 E=    -858.147335926744     steps=  179 RMS= 0.62267E-02 Markov E=    -874.292207567315     t=       31.0
 Qu       1009 E=    -872.992884999647     steps=  144 RMS= 0.63975E-02 Markov E=    -874.292207567315     t=       31.0
 Qu       1010 E=    -871.920630899316     steps=  113 RMS= 0.67198E-02 Markov E=    -874.292207567315     t=       31.0
 Qu       1011 E=    -862.627546049305     steps=  192 RMS= 0.54073E-02 Markov E=    -871.920630899316     t=       31.1
 Qu       1012 E=    -873.061751327807     steps=  169 RMS= 0.37454E-02 Markov E=    -871.920630899316     t=       31.1
 Qu       1013 E=    -865.047844123359     steps=  115 RMS= 0.64863E-02 Markov E=    -873.061751327807     t=       31.1
 Qu       1014 E=    -849.315541512806     steps=  172 RMS= 0.56393E-02 Markov E=    -873.061751327807     t=       31.1
 Qu       1015 E=    -867.934468660226     steps=  262 RMS= 0.58175E-02 Markov E=    -873.061751327807     t=       31.2
 Qu       1016 E=    -870.600712271235     steps=  261 RMS= 0.63109E-02 Markov E=    -873.061751327807     t=       31.2
 Qu       1017 E=    -845.600539795625     steps=  280 RMS= 0.69642E-02 Markov E=    -873.061751327807     t=       31.2
 Qu       1018 E=    -865.170264519897     steps=  164 RMS= 0.68142E-02 Markov E=    -873.061751327807     t=       31.3
 Qu       1019 E=    -869.431076737793     steps=  167 RMS= 0.37733E-02 Markov E=    -873.061751327807     t=       31.3
 Qu       1020 E=    -840.099553709828     steps=  314 RMS= 0.68025E-02 Markov E=    -873.061751327807     t=       31.3
 Qu       1021 E=    -838.468413415355     steps=  392 RMS= 0.69080E-02 Markov E=    -873.061751327807     t=       31.4
 Qu       1022 E=    -872.108752831427     steps=  129 RMS= 0.51906E-02 Markov E=    -873.061751327807     t=       31.4
 Qu       1023 E=    -852.294757591744     steps=  216 RMS= 0.52875E-02 Markov E=    -873.061751327807     t=       31.4
 Qu       1024 E=    -859.255053128874     steps=  438 RMS= 0.61855E-02 Markov E=    -873.061751327807     t=       31.5
 Qu       1025 E=    -872.839836119079     steps=  113 RMS= 0.67540E-02 Markov E=    -873.061751327807     t=       31.5
 Qu       1026 E=    -836.909411528473     steps=  209 RMS= 0.64897E-02 Markov E=    -872.839836119079     t=       31.5
 Qu       1027 E=    -841.255982110889     steps=  487 RMS= 0.68705E-02 Markov E=    -872.839836119079     t=       31.6
 Qu       1028 E=    -841.006690724082     steps=  244 RMS= 0.57013E-02 Markov E=    -872.839836119079     t=       31.6
 Qu       1029 E=    -845.793514423379     steps=  263 RMS= 0.65519E-02 Markov E=    -872.839836119079     t=       31.7
 Qu       1030 E=    -874.548535819445     steps=  112 RMS= 0.54190E-02 Markov E=    -872.839836119079     t=       31.7
 Qu       1031 E=    -866.296613808580     steps=  151 RMS= 0.69643E-02 Markov E=    -874.548535819445     t=       31.7
 Qu       1032 E=    -868.085079684660     steps=  222 RMS= 0.65555E-02 Markov E=    -874.548535819445     t=       31.7
 Qu       1033 E=    -843.770390996693     steps=  312 RMS= 0.59876E-02 Markov E=    -874.548535819445     t=       31.8
 Qu       1034 E=    -841.493452697142     steps=  325 RMS= 0.67760E-02 Markov E=    -874.548535819445     t=       31.8
 Qu       1035 E=    -845.520073358645     steps=  347 RMS= 0.69261E-02 Markov E=    -874.548535819445     t=       31.9
 Qu       1036 E=    -871.891264640836     steps=  143 RMS= 0.61158E-02 Markov E=    -874.548535819445     t=       31.9
 Qu       1037 E=    -871.784279109047     steps=  104 RMS= 0.69402E-02 Markov E=    -871.891264640836     t=       31.9
 Qu       1038 E=    -839.102872007139     steps=  297 RMS= 0.67154E-02 Markov E=    -871.891264640836     t=       31.9
 Qu       1039 E=    -872.895619224642     steps=  179 RMS= 0.57783E-02 Markov E=    -871.891264640836     t=       32.0
 Qu       1040 E=    -850.444169866963     steps=  291 RMS= 0.57496E-02 Markov E=    -872.895619224642     t=       32.0
 Qu       1041 E=    -848.818550237469     steps=  356 RMS= 0.66534E-02 Markov E=    -872.895619224642     t=       32.1
 Qu       1042 E=    -864.294117884948     steps=  212 RMS= 0.46822E-02 Markov E=    -872.895619224642     t=       32.1
 Qu       1043 E=    -863.598667172701     steps=  117 RMS= 0.57814E-02 Markov E=    -872.895619224642     t=       32.1
 Qu       1044 E=    -869.630914017407     steps=  129 RMS= 0.66448E-02 Markov E=    -872.895619224642     t=       32.1
 Qu       1045 E=    -869.632214664761     steps=  217 RMS= 0.65206E-02 Markov E=    -872.895619224642     t=       32.2
 Qu       1046 E=    -870.392066243406     steps=  147 RMS= 0.60346E-02 Markov E=    -872.895619224642     t=       32.2
 Qu       1047 E=    -857.778758583631     steps=  191 RMS= 0.67228E-02 Markov E=    -872.895619224642     t=       32.2
 Qu       1048 E=    -867.605291335885     steps=  115 RMS= 0.67459E-02 Markov E=    -872.895619224642     t=       32.2
 Qu       1049 E=    -863.989832761659     steps=  109 RMS= 0.63994E-02 Markov E=    -872.895619224642     t=       32.2
 Qu       1050 E=    -856.232673801349     steps=  244 RMS= 0.65241E-02 Markov E=    -872.895619224642     t=       32.3
Acceptance ratio for previous     50 steps=  0.1400  FAC=  1.0500
 Qu       1051 E=    -849.114224248987     steps=  541 RMS= 0.62553E-02 Markov E=    -872.895619224642     t=       32.3
 Qu       1052 E=    -855.044514149195     steps=  172 RMS= 0.60285E-02 Markov E=    -872.895619224642     t=       32.4
 Qu       1053 E=    -861.284428908266     steps=  306 RMS= 0.61462E-02 Markov E=    -872.895619224642     t=       32.4
 Qu       1054 E=    -871.139242978348     steps=   95 RMS= 0.55990E-02 Markov E=    -872.895619224642     t=       32.4
 Qu       1055 E=    -846.728627993424     steps=  275 RMS= 0.56198E-02 Markov E=    -872.895619224642     t=       32.5
 Qu       1056 E=    -871.022153078574     steps=  156 RMS= 0.66929E-02 Markov E=    -872.895619224642     t=       32.5
 Qu       1057 E=    -861.900070750400     steps=  250 RMS= 0.55660E-02 Markov E=    -872.895619224642     t=       32.5
 Qu       1058 E=    -869.056635955560     steps=  120 RMS= 0.64682E-02 Markov E=    -872.895619224642     t=       32.5
 Qu       1059 E=    -855.628159971043     steps=  214 RMS= 0.69147E-02 Markov E=    -872.895619224642     t=       32.6
 Qu       1060 E=    -868.678097214728     steps=  127 RMS= 0.58316E-02 Markov E=    -872.895619224642     t=       32.6
 Qu       1061 E=    -866.633029186795     steps=  146 RMS= 0.55089E-02 Markov E=    -872.895619224642     t=       32.6
 Qu       1062 E=    -871.526647716296     steps=  151 RMS= 0.61911E-02 Markov E=    -872.895619224642     t=       32.6
 Qu       1063 E=    -874.490341603694     steps=  133 RMS= 0.66440E-02 Markov E=    -872.895619224642     t=       32.6
 Qu       1064 E=    -854.007435855626     steps=  294 RMS= 0.67540E-02 Markov E=    -874.490341603694     t=       32.7
 Qu       1065 E=    -841.939265261402     steps=  217 RMS= 0.63735E-02 Markov E=    -874.490341603694     t=       32.7
 Qu       1066 E=    -871.504546536895     steps=  246 RMS= 0.55977E-02 Markov E=    -874.490341603694     t=       32.7
 Qu       1067 E=    -873.896819179333     steps=  211 RMS= 0.62648E-02 Markov E=    -874.490341603694     t=       32.8
 Qu       1068 E=    -844.674338080192     steps=  361 RMS= 0.64258E-02 Markov E=    -873.896819179333     t=       32.8
 Qu       1069 E=    -872.117800189009     steps=  104 RMS= 0.60624E-02 Markov E=    -873.896819179333     t=       32.8
 Qu       1070 E=    -872.294130769861     steps=  206 RMS= 0.68558E-02 Markov E=    -873.896819179333     t=       32.9
 Qu       1071 E=    -872.905285716229     steps=  132 RMS= 0.69901E-02 Markov E=    -873.896819179333     t=       32.9
 Qu       1072 E=    -871.322487138065     steps=  219 RMS= 0.62012E-02 Markov E=    -873.896819179333     t=       32.9
 Qu       1073 E=    -844.328116094011     steps=  294 RMS= 0.56272E-02 Markov E=    -873.896819179333     t=       33.0
 Qu       1074 E=    -842.223550271199     steps=  291 RMS= 0.65230E-02 Markov E=    -873.896819179333     t=       33.0
 Qu       1075 E=    -854.737531745501     steps=  201 RMS= 0.64730E-02 Markov E=    -873.896819179333     t=       33.0
 Qu       1076 E=    -847.997423510439     steps=  313 RMS= 0.59506E-02 Markov E=    -873.896819179333     t=       33.1
 Qu       1077 E=    -867.563810385437     steps=  142 RMS= 0.68946E-02 Markov E=    -873.896819179333     t=       33.1
 Qu       1078 E=    -861.912875376829     steps=  237 RMS= 0.59834E-02 Markov E=    -873.896819179333     t=       33.1
 Qu       1079 E=    -874.969112550255     steps=  161 RMS= 0.69273E-02 Markov E=    -873.896819179333     t=       33.1
 Qu       1080 E=    -854.397075047087     steps=  354 RMS= 0.69122E-02 Markov E=    -874.969112550255     t=       33.2
 Qu       1081 E=    -872.095412085188     steps=  135 RMS= 0.68589E-02 Markov E=    -874.969112550255     t=       33.2
 Qu       1082 E=    -874.905884597092     steps=  132 RMS= 0.62963E-02 Markov E=    -874.969112550255     t=       33.2
 Qu       1083 E=    -871.170493457908     steps=  143 RMS= 0.46603E-02 Markov E=    -874.905884597092     t=       33.2
 Qu       1084 E=    -869.930926770230     steps=  192 RMS= 0.60317E-02 Markov E=    -874.905884597092     t=       33.3
 Qu       1085 E=    -847.800060010025     steps=  372 RMS= 0.69759E-02 Markov E=    -874.905884597092     t=       33.3
 Qu       1086 E=    -845.548207617379     steps=  406 RMS= 0.69693E-02 Markov E=    -874.905884597092     t=       33.4
 Qu       1087 E=    -872.217008021515     steps=  108 RMS= 0.54808E-02 Markov E=    -874.905884597092     t=       33.4
 Qu       1088 E=    -875.924450652113     steps=  101 RMS= 0.58368E-02 Markov E=    -874.905884597092     t=       33.4
 Qu       1089 E=    -866.497120025797     steps=  170 RMS= 0.62164E-02 Markov E=    -875.924450652113     t=       33.4
 Qu       1090 E=    -869.083782494865     steps=  191 RMS= 0.55526E-02 Markov E=    -875.924450652113     t=       33.5
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -878.4412360        -877.5933704    
 Qu       1091 E=    -878.441235978171     steps=  124 RMS= 0.60260E-02 Markov E=    -875.924450652113     t=       33.5
 Qu       1092 E=    -862.895004065855     steps=  217 RMS= 0.57099E-02 Markov E=    -878.441235978171     t=       33.5
 Qu       1093 E=    -840.063335505514     steps=  191 RMS= 0.64302E-02 Markov E=    -878.441235978171     t=       33.5
 Qu       1094 E=    -873.948761745445     steps=  171 RMS= 0.60173E-02 Markov E=    -878.441235978171     t=       33.6
 Qu       1095 E=    -851.449792169674     steps=  458 RMS= 0.61305E-02 Markov E=    -878.441235978171     t=       33.6
 Qu       1096 E=    -862.036348897510     steps=  198 RMS= 0.61504E-02 Markov E=    -878.441235978171     t=       33.7
 Qu       1097 E=    -872.864078723301     steps=  221 RMS= 0.56223E-02 Markov E=    -878.441235978171     t=       33.7
 Qu       1098 E=    -868.340087839140     steps=  150 RMS= 0.61011E-02 Markov E=    -878.441235978171     t=       33.7
 Qu       1099 E=    -876.679701125331     steps=  129 RMS= 0.52473E-02 Markov E=    -878.441235978171     t=       33.7
 Qu       1100 E=    -868.306645460405     steps=  120 RMS= 0.58740E-02 Markov E=    -878.441235978171     t=       33.8
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1101 E=    -874.894867941392     steps=  156 RMS= 0.59676E-02 Markov E=    -878.441235978171     t=       33.8
 Qu       1102 E=    -842.940954805085     steps=  305 RMS= 0.66594E-02 Markov E=    -878.441235978171     t=       33.8
 Qu       1103 E=    -874.940096550544     steps=  134 RMS= 0.59392E-02 Markov E=    -878.441235978171     t=       33.8
 Qu       1104 E=    -867.361987954957     steps=  158 RMS= 0.51230E-02 Markov E=    -878.441235978171     t=       33.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -878.9803555        -878.4412360    
 Qu       1105 E=    -878.980355526723     steps=  202 RMS= 0.61906E-02 Markov E=    -878.441235978171     t=       33.9
 Qu       1106 E=    -878.141318894011     steps=  126 RMS= 0.42662E-02 Markov E=    -878.980355526723     t=       33.9
 Qu       1107 E=    -874.663337344546     steps=  108 RMS= 0.54762E-02 Markov E=    -878.980355526723     t=       33.9
 Qu       1108 E=    -874.229753343603     steps=  307 RMS= 0.46557E-02 Markov E=    -878.980355526723     t=       34.0
 Qu       1109 E=    -872.328140480658     steps=  205 RMS= 0.56010E-02 Markov E=    -878.980355526723     t=       34.0
 Qu       1110 E=    -843.791184631524     steps=  342 RMS= 0.65811E-02 Markov E=    -878.980355526723     t=       34.0
 Qu       1111 E=    -869.967289270934     steps=  235 RMS= 0.67116E-02 Markov E=    -878.980355526723     t=       34.1
 Qu       1112 E=    -874.064496217850     steps=  110 RMS= 0.60465E-02 Markov E=    -878.980355526723     t=       34.1
 Qu       1113 E=    -876.839998138747     steps=  148 RMS= 0.58024E-02 Markov E=    -878.980355526723     t=       34.1
 Qu       1114 E=    -874.184834237701     steps=   95 RMS= 0.69293E-02 Markov E=    -878.980355526723     t=       34.1
 Qu       1115 E=    -875.164636378620     steps=  209 RMS= 0.60560E-02 Markov E=    -878.980355526723     t=       34.2
 Qu       1116 E=    -866.273406474102     steps=  143 RMS= 0.58264E-02 Markov E=    -878.980355526723     t=       34.2
 Qu       1117 E=    -867.866661217301     steps=  121 RMS= 0.68523E-02 Markov E=    -878.980355526723     t=       34.2
 Qu       1118 E=    -878.141193185893     steps=  151 RMS= 0.43634E-02 Markov E=    -878.980355526723     t=       34.2
 Qu       1119 E=    -870.419867202200     steps=  144 RMS= 0.63328E-02 Markov E=    -878.980355526723     t=       34.2
 Qu       1120 E=    -877.726921587986     steps=  173 RMS= 0.50198E-02 Markov E=    -878.980355526723     t=       34.3
 Qu       1121 E=    -874.760776217140     steps=  303 RMS= 0.60203E-02 Markov E=    -878.980355526723     t=       34.3
 Qu       1122 E=    -871.000197328391     steps=  115 RMS= 0.59866E-02 Markov E=    -878.980355526723     t=       34.3
 Qu       1123 E=    -876.746954666288     steps=  136 RMS= 0.64666E-02 Markov E=    -878.980355526723     t=       34.3
 Qu       1124 E=    -848.734725737986     steps=  370 RMS= 0.55522E-02 Markov E=    -878.980355526723     t=       34.4
 Qu       1125 E=    -872.350931762729     steps=  103 RMS= 0.62701E-02 Markov E=    -878.980355526723     t=       34.4
 Qu       1126 E=    -851.047506460167     steps=  401 RMS= 0.63487E-02 Markov E=    -878.980355526723     t=       34.5
 Qu       1127 E=    -869.484733858088     steps=  168 RMS= 0.57478E-02 Markov E=    -878.980355526723     t=       34.5
 Qu       1128 E=    -877.242454743982     steps=  175 RMS= 0.61158E-02 Markov E=    -878.980355526723     t=       34.5
 Qu       1129 E=    -864.663197849449     steps=  250 RMS= 0.69594E-02 Markov E=    -878.980355526723     t=       34.5
 Qu       1130 E=    -873.149583945746     steps=  174 RMS= 0.55895E-02 Markov E=    -878.980355526723     t=       34.6
 Qu       1131 E=    -874.863292017337     steps=  105 RMS= 0.59286E-02 Markov E=    -878.980355526723     t=       34.6
 Qu       1132 E=    -844.198167460466     steps=  261 RMS= 0.62420E-02 Markov E=    -878.980355526723     t=       34.6
 Qu       1133 E=    -867.610143268464     steps=  486 RMS= 0.54913E-02 Markov E=    -878.980355526723     t=       34.7
 Qu       1134 E=    -875.931452763582     steps=  150 RMS= 0.56082E-02 Markov E=    -878.980355526723     t=       34.7
 Qu       1135 E=    -845.781722918450     steps=  303 RMS= 0.65988E-02 Markov E=    -878.980355526723     t=       34.7
 Qu       1136 E=    -877.168491720505     steps=  100 RMS= 0.51686E-02 Markov E=    -878.980355526723     t=       34.8
 Qu       1137 E=    -871.865904872656     steps=  172 RMS= 0.65996E-02 Markov E=    -877.168491720505     t=       34.8
 Qu       1138 E=    -848.772927434879     steps=  392 RMS= 0.67715E-02 Markov E=    -877.168491720505     t=       34.8
 Qu       1139 E=    -877.620163098654     steps=  190 RMS= 0.51934E-02 Markov E=    -877.168491720505     t=       34.9
 Qu       1140 E=    -876.295219917335     steps=  107 RMS= 0.62730E-02 Markov E=    -877.620163098654     t=       34.9
 Qu       1141 E=    -845.358449543300     steps=  282 RMS= 0.64248E-02 Markov E=    -877.620163098654     t=       34.9
 Qu       1142 E=    -874.987680695486     steps=  141 RMS= 0.63422E-02 Markov E=    -877.620163098654     t=       34.9
 Qu       1143 E=    -847.578349587860     steps=  536 RMS= 0.65205E-02 Markov E=    -877.620163098654     t=       35.0
 Qu       1144 E=    -867.103285949174     steps=  158 RMS= 0.48391E-02 Markov E=    -877.620163098654     t=       35.0
 Qu       1145 E=    -859.195198285041     steps=  196 RMS= 0.61651E-02 Markov E=    -877.620163098654     t=       35.1
 Qu       1146 E=    -875.093906278596     steps=  163 RMS= 0.50515E-02 Markov E=    -877.620163098654     t=       35.1
 Qu       1147 E=    -877.363604182188     steps=  137 RMS= 0.57709E-02 Markov E=    -877.620163098654     t=       35.1
 Qu       1148 E=    -867.853954577193     steps=  234 RMS= 0.66154E-02 Markov E=    -877.363604182188     t=       35.1
 Qu       1149 E=    -876.908841843408     steps=  137 RMS= 0.58724E-02 Markov E=    -877.363604182188     t=       35.2
 Qu       1150 E=    -877.087960934874     steps=  121 RMS= 0.56291E-02 Markov E=    -876.908841843408     t=       35.2
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1151 E=    -874.134411867183     steps=  155 RMS= 0.68650E-02 Markov E=    -877.087960934874     t=       35.2
 Qu       1152 E=    -875.988189076607     steps=  120 RMS= 0.66925E-02 Markov E=    -877.087960934874     t=       35.2
 Qu       1153 E=    -872.866944282694     steps=  167 RMS= 0.62390E-02 Markov E=    -875.988189076607     t=       35.2
 Qu       1154 E=    -867.901283579139     steps=  182 RMS= 0.63532E-02 Markov E=    -875.988189076607     t=       35.3
 Qu       1155 E=    -872.417409535715     steps=  125 RMS= 0.46576E-02 Markov E=    -875.988189076607     t=       35.3
 Qu       1156 E=    -876.440333436198     steps=  164 RMS= 0.66416E-02 Markov E=    -875.988189076607     t=       35.3
 Qu       1157 E=    -842.094003029441     steps=  319 RMS= 0.66307E-02 Markov E=    -876.440333436198     t=       35.3
 Qu       1158 E=    -844.501202359555     steps=  363 RMS= 0.59681E-02 Markov E=    -876.440333436198     t=       35.4
 Qu       1159 E=    -873.517349270236     steps=  139 RMS= 0.63249E-02 Markov E=    -876.440333436198     t=       35.4
 Qu       1160 E=    -867.358423289408     steps=  184 RMS= 0.64961E-02 Markov E=    -876.440333436198     t=       35.4
 Qu       1161 E=    -864.604327014030     steps=  205 RMS= 0.53723E-02 Markov E=    -876.440333436198     t=       35.5
 Qu       1162 E=    -869.903250618512     steps=  124 RMS= 0.69140E-02 Markov E=    -876.440333436198     t=       35.5
 Qu       1163 E=    -867.553998105586     steps=  106 RMS= 0.69584E-02 Markov E=    -876.440333436198     t=       35.5
 Qu       1164 E=    -869.353252716210     steps=  137 RMS= 0.59465E-02 Markov E=    -876.440333436198     t=       35.5
 Qu       1165 E=    -867.450662952213     steps=  345 RMS= 0.56246E-02 Markov E=    -876.440333436198     t=       35.6
 Qu       1166 E=    -862.115918550017     steps=  172 RMS= 0.61349E-02 Markov E=    -876.440333436198     t=       35.6
 Qu       1167 E=    -872.880937969404     steps=  162 RMS= 0.47084E-02 Markov E=    -876.440333436198     t=       35.6
 Qu       1168 E=    -874.276711093969     steps=  108 RMS= 0.52376E-02 Markov E=    -876.440333436198     t=       35.6
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -878.9868819        -878.9803555    
 Qu       1169 E=    -878.986881867469     steps=  110 RMS= 0.39431E-02 Markov E=    -876.440333436198     t=       35.6
 Qu       1170 E=    -877.038822442187     steps=  103 RMS= 0.63369E-02 Markov E=    -878.986881867469     t=       35.7
 Qu       1171 E=    -875.459490452145     steps=  165 RMS= 0.50989E-02 Markov E=    -878.986881867469     t=       35.7
 Qu       1172 E=    -870.082413015623     steps=  798 RMS= 0.64565E-02 Markov E=    -878.986881867469     t=       35.8
 Qu       1173 E=    -878.235953915655     steps=  149 RMS= 0.66718E-02 Markov E=    -878.986881867469     t=       35.8
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -879.9731869        -878.9868819    
 Qu       1174 E=    -879.973186894237     steps=  151 RMS= 0.52003E-02 Markov E=    -878.986881867469     t=       35.8
 Qu       1175 E=    -841.317349981145     steps=  268 RMS= 0.63177E-02 Markov E=    -879.973186894237     t=       35.9
 Qu       1176 E=    -860.823201068552     steps=  223 RMS= 0.61771E-02 Markov E=    -879.973186894237     t=       35.9
 Qu       1177 E=    -847.157069311583     steps=  392 RMS= 0.59327E-02 Markov E=    -879.973186894237     t=       36.0
 Qu       1178 E=    -846.710189900018     steps=  275 RMS= 0.55563E-02 Markov E=    -879.973186894237     t=       36.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -880.8267761        -879.9731869    
 Qu       1179 E=    -880.826776065598     steps=   86 RMS= 0.46310E-02 Markov E=    -879.973186894237     t=       36.0
 Qu       1180 E=    -844.991884376031     steps=  359 RMS= 0.65584E-02 Markov E=    -880.826776065598     t=       36.1
 Qu       1181 E=    -872.461297291202     steps=  252 RMS= 0.38922E-02 Markov E=    -880.826776065598     t=       36.1
 Qu       1182 E=    -845.168116620901     steps=  238 RMS= 0.64866E-02 Markov E=    -880.826776065598     t=       36.1
 Qu       1183 E=    -878.535722063237     steps=  116 RMS= 0.68560E-02 Markov E=    -880.826776065598     t=       36.1
 Qu       1184 E=    -879.414217912458     steps=  139 RMS= 0.68236E-02 Markov E=    -880.826776065598     t=       36.2
 Qu       1185 E=    -846.735674683877     steps=  286 RMS= 0.68063E-02 Markov E=    -880.826776065598     t=       36.2
 Qu       1186 E=    -873.433752580239     steps=  113 RMS= 0.36833E-02 Markov E=    -880.826776065598     t=       36.2
 Qu       1187 E=    -855.017104875943     steps=  315 RMS= 0.60609E-02 Markov E=    -880.826776065598     t=       36.3
 Qu       1188 E=    -875.175143566643     steps=  135 RMS= 0.64854E-02 Markov E=    -880.826776065598     t=       36.3
 Qu       1189 E=    -869.090937974831     steps=  164 RMS= 0.55668E-02 Markov E=    -880.826776065598     t=       36.3
 Qu       1190 E=    -877.407560916846     steps=  108 RMS= 0.57424E-02 Markov E=    -880.826776065598     t=       36.3
 Qu       1191 E=    -845.324893369456     steps=  373 RMS= 0.66049E-02 Markov E=    -880.826776065598     t=       36.4
 Qu       1192 E=    -877.175959049725     steps=  101 RMS= 0.69617E-02 Markov E=    -880.826776065598     t=       36.4
 Qu       1193 E=    -843.473164721179     steps=  329 RMS= 0.61701E-02 Markov E=    -880.826776065598     t=       36.4
 Qu       1194 E=    -877.236038570389     steps=  268 RMS= 0.36886E-02 Markov E=    -880.826776065598     t=       36.5
 Qu       1195 E=    -869.076902064392     steps=  128 RMS= 0.54957E-02 Markov E=    -880.826776065598     t=       36.5
 Qu       1196 E=    -879.641401554176     steps=  154 RMS= 0.65912E-02 Markov E=    -880.826776065598     t=       36.5
 Qu       1197 E=    -870.530950408255     steps=  155 RMS= 0.61193E-02 Markov E=    -880.826776065598     t=       36.5
 Qu       1198 E=    -874.740671988748     steps=  135 RMS= 0.60157E-02 Markov E=    -880.826776065598     t=       36.5
 Qu       1199 E=    -843.868884768682     steps=  208 RMS= 0.61779E-02 Markov E=    -880.826776065598     t=       36.6
 Qu       1200 E=    -873.238760126942     steps=  247 RMS= 0.54929E-02 Markov E=    -880.826776065598     t=       36.6
Acceptance ratio for previous     50 steps=  0.1000  FAC=  1.0500
 Qu       1201 E=    -879.426772663343     steps=   94 RMS= 0.59174E-02 Markov E=    -880.826776065598     t=       36.6
 Qu       1202 E=    -875.073534609907     steps=  107 RMS= 0.63597E-02 Markov E=    -880.826776065598     t=       36.6
 Qu       1203 E=    -862.308959246540     steps=  433 RMS= 0.56050E-02 Markov E=    -880.826776065598     t=       36.7
 Qu       1204 E=    -874.990996758445     steps=  203 RMS= 0.52783E-02 Markov E=    -880.826776065598     t=       36.7
 Qu       1205 E=    -874.580576332221     steps=  110 RMS= 0.61830E-02 Markov E=    -880.826776065598     t=       36.7
 Qu       1206 E=    -878.432816306463     steps=   89 RMS= 0.65205E-02 Markov E=    -880.826776065598     t=       36.7
 Qu       1207 E=    -853.241040450570     steps=  186 RMS= 0.67547E-02 Markov E=    -880.826776065598     t=       36.8
 Qu       1208 E=    -873.796937510440     steps=  200 RMS= 0.49672E-02 Markov E=    -880.826776065598     t=       36.8
 Qu       1209 E=    -879.705408445977     steps=  102 RMS= 0.43737E-02 Markov E=    -880.826776065598     t=       36.8
 Qu       1210 E=    -874.929202994831     steps=  216 RMS= 0.44613E-02 Markov E=    -880.826776065598     t=       36.8
 Qu       1211 E=    -873.488649972421     steps=  223 RMS= 0.63266E-02 Markov E=    -880.826776065598     t=       36.9
 Qu       1212 E=    -873.383454389270     steps=  187 RMS= 0.63377E-02 Markov E=    -880.826776065598     t=       36.9
 Qu       1213 E=    -872.216691571000     steps=  141 RMS= 0.58412E-02 Markov E=    -880.826776065598     t=       36.9
 Qu       1214 E=    -875.812753647106     steps=   97 RMS= 0.67287E-02 Markov E=    -880.826776065598     t=       36.9
 Qu       1215 E=    -872.596442324094     steps=  187 RMS= 0.38948E-02 Markov E=    -880.826776065598     t=       37.0
 Qu       1216 E=    -839.878669148836     steps=  359 RMS= 0.67637E-02 Markov E=    -880.826776065598     t=       37.0
 Qu       1217 E=    -879.042715653176     steps=  100 RMS= 0.63597E-02 Markov E=    -880.826776065598     t=       37.0
 Qu       1218 E=    -879.542331997810     steps=   90 RMS= 0.66686E-02 Markov E=    -880.826776065598     t=       37.0
 Qu       1219 E=    -874.714127045877     steps=  302 RMS= 0.58245E-02 Markov E=    -879.542331997810     t=       37.1
 Qu       1220 E=    -860.901948694822     steps=  248 RMS= 0.64216E-02 Markov E=    -879.542331997810     t=       37.1
 Qu       1221 E=    -873.966480599529     steps=  161 RMS= 0.47958E-02 Markov E=    -879.542331997810     t=       37.1
 Qu       1222 E=    -867.062374865035     steps=  274 RMS= 0.69892E-02 Markov E=    -879.542331997810     t=       37.2
 Qu       1223 E=    -871.266629185240     steps=  266 RMS= 0.60164E-02 Markov E=    -879.542331997810     t=       37.2
 Qu       1224 E=    -854.865162100539     steps=  360 RMS= 0.59705E-02 Markov E=    -879.542331997810     t=       37.3
 Qu       1225 E=    -879.542422012530     steps=   95 RMS= 0.58133E-02 Markov E=    -879.542331997810     t=       37.3
 Qu       1226 E=    -873.666692553699     steps=  125 RMS= 0.68312E-02 Markov E=    -879.542422012530     t=       37.3
 Qu       1227 E=    -876.158899109891     steps=  126 RMS= 0.42312E-02 Markov E=    -879.542422012530     t=       37.3
 Qu       1228 E=    -865.098739491906     steps=  469 RMS= 0.69056E-02 Markov E=    -879.542422012530     t=       37.4
 Qu       1229 E=    -880.796081695940     steps=  100 RMS= 0.50506E-02 Markov E=    -879.542422012530     t=       37.4
 Qu       1230 E=    -876.090531154678     steps=  287 RMS= 0.61980E-02 Markov E=    -880.796081695940     t=       37.4
 Qu       1231 E=    -878.113007480416     steps=   82 RMS= 0.48293E-02 Markov E=    -880.796081695940     t=       37.4
 Qu       1232 E=    -879.426662785015     steps=   83 RMS= 0.59492E-02 Markov E=    -880.796081695940     t=       37.4
 Qu       1233 E=    -873.844434577807     steps=  159 RMS= 0.69298E-02 Markov E=    -879.426662785015     t=       37.5
 Qu       1234 E=    -872.707355539413     steps=  217 RMS= 0.53704E-02 Markov E=    -879.426662785015     t=       37.5
 Qu       1235 E=    -873.600163541322     steps=  166 RMS= 0.60789E-02 Markov E=    -879.426662785015     t=       37.5
 Qu       1236 E=    -843.751347950621     steps=  406 RMS= 0.69278E-02 Markov E=    -879.426662785015     t=       37.6
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -881.0103963        -880.8267761    
 Qu       1237 E=    -881.010396349426     steps=  215 RMS= 0.39889E-02 Markov E=    -879.426662785015     t=       37.6
 Qu       1238 E=    -875.044270694199     steps=  161 RMS= 0.54251E-02 Markov E=    -881.010396349426     t=       37.6
 Qu       1239 E=    -866.424236073729     steps=  605 RMS= 0.69301E-02 Markov E=    -881.010396349426     t=       37.7
 Qu       1240 E=    -841.627317984107     steps=  261 RMS= 0.68294E-02 Markov E=    -881.010396349426     t=       37.8
 Qu       1241 E=    -866.909339604625     steps=  491 RMS= 0.47013E-02 Markov E=    -881.010396349426     t=       37.8
 Qu       1242 E=    -878.316352478834     steps=  119 RMS= 0.64891E-02 Markov E=    -881.010396349426     t=       37.8
 Qu       1243 E=    -879.080187170027     steps=  109 RMS= 0.55573E-02 Markov E=    -881.010396349426     t=       37.9
 Qu       1244 E=    -867.356478664543     steps=  107 RMS= 0.67874E-02 Markov E=    -881.010396349426     t=       37.9
 Qu       1245 E=    -880.800796265550     steps=   86 RMS= 0.60735E-02 Markov E=    -881.010396349426     t=       37.9
 Qu       1246 E=    -867.060919795527     steps=  213 RMS= 0.68680E-02 Markov E=    -880.800796265550     t=       37.9
 Qu       1247 E=    -875.407965876939     steps=  168 RMS= 0.62127E-02 Markov E=    -880.800796265550     t=       37.9
 Qu       1248 E=    -876.976227513723     steps=  180 RMS= 0.68547E-02 Markov E=    -880.800796265550     t=       38.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -881.1529189        -881.0103963    
 Qu       1249 E=    -881.152918910347     steps=  126 RMS= 0.60210E-02 Markov E=    -880.800796265550     t=       38.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -881.6043423        -881.1529189    
 Qu       1250 E=    -881.604342326595     steps=  155 RMS= 0.62415E-02 Markov E=    -881.152918910347     t=       38.0
Acceptance ratio for previous     50 steps=  0.1600  FAC=  1.0500
 Qu       1251 E=    -880.606075834030     steps=  153 RMS= 0.44750E-02 Markov E=    -881.604342326595     t=       38.0
 Qu       1252 E=    -857.192045219409     steps=  424 RMS= 0.61649E-02 Markov E=    -881.604342326595     t=       38.1
 Qu       1253 E=    -879.055481750931     steps=  111 RMS= 0.66830E-02 Markov E=    -881.604342326595     t=       38.1
 Qu       1254 E=    -840.139107048950     steps=  323 RMS= 0.64477E-02 Markov E=    -881.604342326595     t=       38.1
 Qu       1255 E=    -860.072007593784     steps=  440 RMS= 0.60294E-02 Markov E=    -881.604342326595     t=       38.2
 Qu       1256 E=    -875.536088845989     steps=  186 RMS= 0.53473E-02 Markov E=    -881.604342326595     t=       38.2
 Qu       1257 E=    -835.462167872873     steps=  241 RMS= 0.68786E-02 Markov E=    -881.604342326595     t=       38.3
 Qu       1258 E=    -876.337966002656     steps=  132 RMS= 0.62131E-02 Markov E=    -881.604342326595     t=       38.3
 Qu       1259 E=    -877.475754430589     steps=  174 RMS= 0.49100E-02 Markov E=    -881.604342326595     t=       38.3
 Qu       1260 E=    -870.699870211209     steps=  447 RMS= 0.69765E-02 Markov E=    -881.604342326595     t=       38.4
 Qu       1261 E=    -880.484426936865     steps=   84 RMS= 0.59317E-02 Markov E=    -881.604342326595     t=       38.4
 Qu       1262 E=    -876.161112628599     steps=  187 RMS= 0.62922E-02 Markov E=    -880.484426936865     t=       38.4
 Qu       1263 E=    -877.128077501545     steps=  151 RMS= 0.33890E-02 Markov E=    -880.484426936865     t=       38.4
 Qu       1264 E=    -881.587881769743     steps=  151 RMS= 0.53869E-02 Markov E=    -880.484426936865     t=       38.5
 Qu       1265 E=    -875.711857691542     steps=  193 RMS= 0.65498E-02 Markov E=    -881.587881769743     t=       38.5
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -882.9006749        -881.6043423    
 Qu       1266 E=    -882.900674898244     steps=  137 RMS= 0.61138E-02 Markov E=    -881.587881769743     t=       38.5
 Qu       1267 E=    -873.685671761524     steps=  158 RMS= 0.57704E-02 Markov E=    -882.900674898244     t=       38.5
 Qu       1268 E=    -875.507171191169     steps=  107 RMS= 0.68794E-02 Markov E=    -882.900674898244     t=       38.5
 Qu       1269 E=    -875.007740476655     steps=  159 RMS= 0.52605E-02 Markov E=    -882.900674898244     t=       38.6
 Qu       1270 E=    -874.428990117586     steps=   96 RMS= 0.55895E-02 Markov E=    -882.900674898244     t=       38.6
 Qu       1271 E=    -878.186794183950     steps=  162 RMS= 0.51060E-02 Markov E=    -882.900674898244     t=       38.6
 Qu       1272 E=    -869.582887234124     steps=  169 RMS= 0.60792E-02 Markov E=    -882.900674898244     t=       38.6
 Qu       1273 E=    -875.990133682775     steps=  158 RMS= 0.49499E-02 Markov E=    -882.900674898244     t=       38.7
 Qu       1274 E=    -874.414353447897     steps=  339 RMS= 0.60174E-02 Markov E=    -882.900674898244     t=       38.7
 Qu       1275 E=    -852.005876660634     steps=  293 RMS= 0.66126E-02 Markov E=    -882.900674898244     t=       38.7
 Qu       1276 E=    -874.135676344453     steps=  140 RMS= 0.60463E-02 Markov E=    -882.900674898244     t=       38.8
 Qu       1277 E=    -881.248700438228     steps=   79 RMS= 0.68701E-02 Markov E=    -882.900674898244     t=       38.8
 Qu       1278 E=    -842.572632889632     steps=  244 RMS= 0.62683E-02 Markov E=    -881.248700438228     t=       38.8
 Qu       1279 E=    -880.328239958371     steps=  100 RMS= 0.60808E-02 Markov E=    -881.248700438228     t=       38.8
 Qu       1280 E=    -880.563262396131     steps=  199 RMS= 0.60291E-02 Markov E=    -881.248700438228     t=       38.8
 Qu       1281 E=    -877.812094306821     steps=  152 RMS= 0.65204E-02 Markov E=    -881.248700438228     t=       38.9
 Qu       1282 E=    -881.391346098121     steps=  152 RMS= 0.50968E-02 Markov E=    -881.248700438228     t=       38.9
 Qu       1283 E=    -880.387094481096     steps=  123 RMS= 0.67194E-02 Markov E=    -881.391346098121     t=       38.9
 Qu       1284 E=    -865.408817434310     steps=  487 RMS= 0.58096E-02 Markov E=    -880.387094481096     t=       39.0
 Qu       1285 E=    -880.713305516439     steps=   95 RMS= 0.51248E-02 Markov E=    -880.387094481096     t=       39.0
 Qu       1286 E=    -879.128147085437     steps=  102 RMS= 0.65974E-02 Markov E=    -880.713305516439     t=       39.0
 Qu       1287 E=    -879.460479578490     steps=  187 RMS= 0.68264E-02 Markov E=    -880.713305516439     t=       39.0
 Qu       1288 E=    -877.229824603058     steps=   87 RMS= 0.64610E-02 Markov E=    -880.713305516439     t=       39.0
 Qu       1289 E=    -870.326693574505     steps=  209 RMS= 0.60221E-02 Markov E=    -880.713305516439     t=       39.1
 Qu       1290 E=    -880.276959734070     steps=   93 RMS= 0.50129E-02 Markov E=    -880.713305516439     t=       39.1
 Qu       1291 E=    -868.779255241966     steps=  571 RMS= 0.68864E-02 Markov E=    -880.276959734070     t=       39.2
 Qu       1292 E=    -880.014435162817     steps=  138 RMS= 0.69859E-02 Markov E=    -880.276959734070     t=       39.2
 Qu       1293 E=    -855.937840021939     steps=  327 RMS= 0.56593E-02 Markov E=    -880.276959734070     t=       39.2
 Qu       1294 E=    -858.425193461926     steps=  257 RMS= 0.66227E-02 Markov E=    -880.276959734070     t=       39.3
 Qu       1295 E=    -881.392324900205     steps=  108 RMS= 0.59579E-02 Markov E=    -880.276959734070     t=       39.3
 Qu       1296 E=    -880.932956354507     steps=  316 RMS= 0.63128E-02 Markov E=    -881.392324900205     t=       39.3
 Qu       1297 E=    -868.394666394831     steps=  255 RMS= 0.65823E-02 Markov E=    -880.932956354507     t=       39.4
 Qu       1298 E=    -875.252491387314     steps=  279 RMS= 0.60001E-02 Markov E=    -880.932956354507     t=       39.4
 Qu       1299 E=    -874.142440133435     steps=  268 RMS= 0.47776E-02 Markov E=    -875.252491387314     t=       39.4
 Qu       1300 E=    -872.179600236744     steps=  102 RMS= 0.56550E-02 Markov E=    -875.252491387314     t=       39.4
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       1301 E=    -842.488857174256     steps=  250 RMS= 0.68603E-02 Markov E=    -875.252491387314     t=       39.5
 Qu       1302 E=    -872.651064171884     steps=  126 RMS= 0.67796E-02 Markov E=    -875.252491387314     t=       39.5
 Qu       1303 E=    -876.807463518051     steps=   98 RMS= 0.47406E-02 Markov E=    -875.252491387314     t=       39.5
 Qu       1304 E=    -865.711864102683     steps=  156 RMS= 0.58311E-02 Markov E=    -876.807463518051     t=       39.5
 Qu       1305 E=    -858.612948200281     steps=  216 RMS= 0.64365E-02 Markov E=    -876.807463518051     t=       39.6
 Qu       1306 E=    -878.003156468622     steps=  245 RMS= 0.35685E-02 Markov E=    -876.807463518051     t=       39.6
 Qu       1307 E=    -845.518852756418     steps=  303 RMS= 0.54799E-02 Markov E=    -878.003156468622     t=       39.6
 Qu       1308 E=    -869.201007595916     steps=  129 RMS= 0.60785E-02 Markov E=    -878.003156468622     t=       39.7
 Qu       1309 E=    -848.978682543116     steps=  304 RMS= 0.50513E-02 Markov E=    -878.003156468622     t=       39.7
 Qu       1310 E=    -857.826563635529     steps=  520 RMS= 0.68658E-02 Markov E=    -878.003156468622     t=       39.8
 Qu       1311 E=    -854.568143237270     steps=  330 RMS= 0.63160E-02 Markov E=    -878.003156468622     t=       39.8
 Qu       1312 E=    -870.829101133486     steps=  126 RMS= 0.57807E-02 Markov E=    -878.003156468622     t=       39.8
 Qu       1313 E=    -862.883199458841     steps=  245 RMS= 0.58524E-02 Markov E=    -878.003156468622     t=       39.9
 Qu       1314 E=    -874.112286760802     steps=   88 RMS= 0.61645E-02 Markov E=    -878.003156468622     t=       39.9
 Qu       1315 E=    -868.577733701857     steps=   97 RMS= 0.52883E-02 Markov E=    -878.003156468622     t=       39.9
 Qu       1316 E=    -879.316175654762     steps=  140 RMS= 0.59646E-02 Markov E=    -878.003156468622     t=       39.9
 Qu       1317 E=    -877.254629382046     steps=  138 RMS= 0.59875E-02 Markov E=    -879.316175654762     t=       39.9
 Qu       1318 E=    -866.605203938926     steps=  385 RMS= 0.63826E-02 Markov E=    -879.316175654762     t=       40.0
 Qu       1319 E=    -874.560073082505     steps=  146 RMS= 0.53241E-02 Markov E=    -879.316175654762     t=       40.0
 Qu       1320 E=    -847.930453350475     steps=  325 RMS= 0.69829E-02 Markov E=    -879.316175654762     t=       40.1
 Qu       1321 E=    -873.671205622652     steps=  172 RMS= 0.66005E-02 Markov E=    -879.316175654762     t=       40.1
 Qu       1322 E=    -869.840358286336     steps=  193 RMS= 0.69592E-02 Markov E=    -879.316175654762     t=       40.1
 Qu       1323 E=    -850.843330761852     steps=  324 RMS= 0.69345E-02 Markov E=    -879.316175654762     t=       40.2
 Qu       1324 E=    -877.819053090135     steps=  126 RMS= 0.61279E-02 Markov E=    -879.316175654762     t=       40.2
 Qu       1325 E=    -877.988508923571     steps=  325 RMS= 0.52636E-02 Markov E=    -879.316175654762     t=       40.2
 Qu       1326 E=    -870.494927503198     steps=  126 RMS= 0.68071E-02 Markov E=    -879.316175654762     t=       40.2
 Qu       1327 E=    -865.045282351348     steps=  172 RMS= 0.67730E-02 Markov E=    -879.316175654762     t=       40.3
 Qu       1328 E=    -862.865497312089     steps=  276 RMS= 0.64772E-02 Markov E=    -879.316175654762     t=       40.3
 Qu       1329 E=    -868.572026777890     steps=  174 RMS= 0.60101E-02 Markov E=    -879.316175654762     t=       40.3
 Qu       1330 E=    -877.945715619132     steps=  116 RMS= 0.57602E-02 Markov E=    -879.316175654762     t=       40.3
 Qu       1331 E=    -846.304819270749     steps=  557 RMS= 0.42582E-02 Markov E=    -879.316175654762     t=       40.4
 Qu       1332 E=    -874.938494691194     steps=  372 RMS= 0.58543E-02 Markov E=    -879.316175654762     t=       40.5
 Qu       1333 E=    -875.237151966856     steps=  122 RMS= 0.59009E-02 Markov E=    -879.316175654762     t=       40.5
 Qu       1334 E=    -868.209883171684     steps=  279 RMS= 0.53624E-02 Markov E=    -879.316175654762     t=       40.5
 Qu       1335 E=    -878.478637638264     steps=  114 RMS= 0.55734E-02 Markov E=    -879.316175654762     t=       40.5
 Qu       1336 E=    -846.254663171479     steps=  354 RMS= 0.67649E-02 Markov E=    -879.316175654762     t=       40.6
 Qu       1337 E=    -872.071611550810     steps=   94 RMS= 0.65818E-02 Markov E=    -879.316175654762     t=       40.6
 Qu       1338 E=    -875.981546995521     steps=   98 RMS= 0.54623E-02 Markov E=    -879.316175654762     t=       40.6
 Qu       1339 E=    -870.869957262345     steps=  240 RMS= 0.46351E-02 Markov E=    -879.316175654762     t=       40.7
 Qu       1340 E=    -862.173959922618     steps=  307 RMS= 0.64756E-02 Markov E=    -879.316175654762     t=       40.7
 Qu       1341 E=    -865.097419769023     steps=  158 RMS= 0.66960E-02 Markov E=    -879.316175654762     t=       40.7
 Qu       1342 E=    -878.257976233439     steps=  116 RMS= 0.47770E-02 Markov E=    -879.316175654762     t=       40.7
 Qu       1343 E=    -874.106160817991     steps=  197 RMS= 0.66273E-02 Markov E=    -879.316175654762     t=       40.8
 Qu       1344 E=    -853.379780950277     steps=  206 RMS= 0.68486E-02 Markov E=    -879.316175654762     t=       40.8
 Qu       1345 E=    -874.668270378160     steps=  130 RMS= 0.64032E-02 Markov E=    -879.316175654762     t=       40.8
 Qu       1346 E=    -877.088686083530     steps=   82 RMS= 0.67419E-02 Markov E=    -879.316175654762     t=       40.8
 Qu       1347 E=    -848.365831749481     steps=  227 RMS= 0.66785E-02 Markov E=    -879.316175654762     t=       40.9
 Qu       1348 E=    -877.143674051566     steps=   88 RMS= 0.63166E-02 Markov E=    -879.316175654762     t=       40.9
 Qu       1349 E=    -869.843036096999     steps=  446 RMS= 0.43615E-02 Markov E=    -879.316175654762     t=       40.9
 Qu       1350 E=    -880.563492890800     steps=  157 RMS= 0.54371E-02 Markov E=    -879.316175654762     t=       41.0
Acceptance ratio for previous     50 steps=  0.0800  FAC=  1.0500
 Qu       1351 E=    -841.644963178908     steps=  369 RMS= 0.62394E-02 Markov E=    -880.563492890800     t=       41.0
 Qu       1352 E=    -874.531379601035     steps=  136 RMS= 0.64646E-02 Markov E=    -880.563492890800     t=       41.0
 Qu       1353 E=    -872.524296158967     steps=  148 RMS= 0.69752E-02 Markov E=    -880.563492890800     t=       41.0
 Qu       1354 E=    -872.968423847722     steps=  176 RMS= 0.63740E-02 Markov E=    -880.563492890800     t=       41.1
 Qu       1355 E=    -845.341856909478     steps=  405 RMS= 0.50590E-02 Markov E=    -880.563492890800     t=       41.1
 Qu       1356 E=    -876.348305904286     steps=  248 RMS= 0.62743E-02 Markov E=    -880.563492890800     t=       41.2
 Qu       1357 E=    -878.173312448274     steps=  189 RMS= 0.63661E-02 Markov E=    -880.563492890800     t=       41.2
 Qu       1358 E=    -875.763383419034     steps=  208 RMS= 0.47715E-02 Markov E=    -878.173312448274     t=       41.2
 Qu       1359 E=    -869.324520124372     steps=  112 RMS= 0.60722E-02 Markov E=    -878.173312448274     t=       41.2
 Qu       1360 E=    -847.803605626858     steps=  191 RMS= 0.56966E-02 Markov E=    -878.173312448274     t=       41.3
 Qu       1361 E=    -876.384163767846     steps=  218 RMS= 0.59145E-02 Markov E=    -878.173312448274     t=       41.3
 Qu       1362 E=    -842.779752015902     steps=  250 RMS= 0.64152E-02 Markov E=    -878.173312448274     t=       41.3
 Qu       1363 E=    -873.193844354480     steps=  239 RMS= 0.63038E-02 Markov E=    -878.173312448274     t=       41.4
 Qu       1364 E=    -865.116363330633     steps=  167 RMS= 0.45288E-02 Markov E=    -878.173312448274     t=       41.4
 Qu       1365 E=    -874.701720286380     steps=  240 RMS= 0.55544E-02 Markov E=    -878.173312448274     t=       41.4
 Qu       1366 E=    -871.296278696117     steps=  169 RMS= 0.61930E-02 Markov E=    -878.173312448274     t=       41.4
 Qu       1367 E=    -876.056206054119     steps=  104 RMS= 0.65773E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1368 E=    -872.511569587044     steps=  144 RMS= 0.59953E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1369 E=    -875.661404313000     steps=  152 RMS= 0.66847E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1370 E=    -871.154657846984     steps=  153 RMS= 0.54915E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1371 E=    -872.584791743995     steps=  124 RMS= 0.62909E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1372 E=    -872.247239880399     steps=  119 RMS= 0.62746E-02 Markov E=    -878.173312448274     t=       41.5
 Qu       1373 E=    -880.387125189973     steps=  132 RMS= 0.69531E-02 Markov E=    -878.173312448274     t=       41.6
 Qu       1374 E=    -876.649393488690     steps=  127 RMS= 0.61915E-02 Markov E=    -880.387125189973     t=       41.6
 Qu       1375 E=    -866.634682733532     steps=  206 RMS= 0.67145E-02 Markov E=    -880.387125189973     t=       41.6
 Qu       1376 E=    -869.779152709698     steps=  113 RMS= 0.61455E-02 Markov E=    -880.387125189973     t=       41.6
 Qu       1377 E=    -875.557223338767     steps=  177 RMS= 0.59434E-02 Markov E=    -880.387125189973     t=       41.7
 Qu       1378 E=    -879.000665056810     steps=   80 RMS= 0.53074E-02 Markov E=    -880.387125189973     t=       41.7
 Qu       1379 E=    -879.214386542915     steps=   93 RMS= 0.52429E-02 Markov E=    -880.387125189973     t=       41.7
 Qu       1380 E=    -870.722609820748     steps=  147 RMS= 0.57903E-02 Markov E=    -880.387125189973     t=       41.7
 Qu       1381 E=    -879.002672946523     steps=   79 RMS= 0.47200E-02 Markov E=    -880.387125189973     t=       41.7
 Qu       1382 E=    -877.865403228756     steps=  123 RMS= 0.50783E-02 Markov E=    -879.002672946523     t=       41.7
 Qu       1383 E=    -877.998696840731     steps=   90 RMS= 0.61322E-02 Markov E=    -879.002672946523     t=       41.7
 Qu       1384 E=    -860.745905185664     steps=  229 RMS= 0.47017E-02 Markov E=    -879.002672946523     t=       41.8
 Qu       1385 E=    -848.815994989098     steps=  265 RMS= 0.64105E-02 Markov E=    -879.002672946523     t=       41.8
 Qu       1386 E=    -871.426685453529     steps=  179 RMS= 0.57475E-02 Markov E=    -879.002672946523     t=       41.8
 Qu       1387 E=    -862.612740852669     steps=  231 RMS= 0.60165E-02 Markov E=    -879.002672946523     t=       41.9
 Qu       1388 E=    -879.291045706618     steps=  135 RMS= 0.40504E-02 Markov E=    -879.002672946523     t=       41.9
 Qu       1389 E=    -879.389470807962     steps=  154 RMS= 0.67738E-02 Markov E=    -879.291045706618     t=       41.9
 Qu       1390 E=    -880.713837341042     steps=  117 RMS= 0.58940E-02 Markov E=    -879.389470807962     t=       41.9
 Qu       1391 E=    -879.483102117351     steps=  130 RMS= 0.59305E-02 Markov E=    -880.713837341042     t=       41.9
 Qu       1392 E=    -876.062934284273     steps=  234 RMS= 0.60564E-02 Markov E=    -880.713837341042     t=       42.0
 Qu       1393 E=    -864.365509923907     steps=  224 RMS= 0.57429E-02 Markov E=    -880.713837341042     t=       42.0
 Qu       1394 E=    -865.888681326574     steps=  363 RMS= 0.64549E-02 Markov E=    -880.713837341042     t=       42.1
 Qu       1395 E=    -876.715628876864     steps=  447 RMS= 0.56800E-02 Markov E=    -880.713837341042     t=       42.1
 Qu       1396 E=    -844.261877824826     steps=  448 RMS= 0.54330E-02 Markov E=    -880.713837341042     t=       42.2
 Qu       1397 E=    -877.668382633013     steps=  112 RMS= 0.51808E-02 Markov E=    -880.713837341042     t=       42.2
 Qu       1398 E=    -875.562124524029     steps=  114 RMS= 0.53227E-02 Markov E=    -880.713837341042     t=       42.2
 Qu       1399 E=    -879.539662040393     steps=   86 RMS= 0.55218E-02 Markov E=    -880.713837341042     t=       42.2
 Qu       1400 E=    -876.117133116495     steps=  148 RMS= 0.60879E-02 Markov E=    -880.713837341042     t=       42.2
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1401 E=    -873.954700521846     steps=  341 RMS= 0.69266E-02 Markov E=    -880.713837341042     t=       42.3
 Qu       1402 E=    -878.793786360980     steps=   79 RMS= 0.62649E-02 Markov E=    -880.713837341042     t=       42.3
 Qu       1403 E=    -841.828929701104     steps=  504 RMS= 0.68403E-02 Markov E=    -880.713837341042     t=       42.4
 Qu       1404 E=    -879.751570404041     steps=  126 RMS= 0.58605E-02 Markov E=    -880.713837341042     t=       42.4
 Qu       1405 E=    -877.517837573123     steps=  132 RMS= 0.59574E-02 Markov E=    -879.751570404041     t=       42.4
 Qu       1406 E=    -873.803151099632     steps=  243 RMS= 0.61736E-02 Markov E=    -879.751570404041     t=       42.4
 Qu       1407 E=    -875.597636221160     steps=  256 RMS= 0.68828E-02 Markov E=    -879.751570404041     t=       42.5
 Qu       1408 E=    -871.534804098059     steps=  172 RMS= 0.55690E-02 Markov E=    -879.751570404041     t=       42.5
 Qu       1409 E=    -868.607705336675     steps=  225 RMS= 0.66882E-02 Markov E=    -879.751570404041     t=       42.5
 Qu       1410 E=    -877.832109620718     steps=  135 RMS= 0.59219E-02 Markov E=    -879.751570404041     t=       42.5
 Qu       1411 E=    -846.582797497027     steps=  195 RMS= 0.55270E-02 Markov E=    -879.751570404041     t=       42.6
 Qu       1412 E=    -877.842661337891     steps=  135 RMS= 0.68295E-02 Markov E=    -879.751570404041     t=       42.6
 Qu       1413 E=    -845.686065564959     steps=  254 RMS= 0.59124E-02 Markov E=    -879.751570404041     t=       42.6
 Qu       1414 E=    -875.978672511244     steps=  117 RMS= 0.69528E-02 Markov E=    -879.751570404041     t=       42.6
 Qu       1415 E=    -878.203099695238     steps=   97 RMS= 0.61510E-02 Markov E=    -879.751570404041     t=       42.7
 Qu       1416 E=    -856.484806052768     steps=  206 RMS= 0.53377E-02 Markov E=    -879.751570404041     t=       42.7
 Qu       1417 E=    -869.868123940023     steps=  231 RMS= 0.59421E-02 Markov E=    -879.751570404041     t=       42.7
 Qu       1418 E=    -861.365782422605     steps=  364 RMS= 0.63821E-02 Markov E=    -879.751570404041     t=       42.8
 Qu       1419 E=    -849.320888189368     steps=  487 RMS= 0.66709E-02 Markov E=    -879.751570404041     t=       42.8
 Qu       1420 E=    -863.695519086215     steps=  552 RMS= 0.63113E-02 Markov E=    -879.751570404041     t=       42.9
 Qu       1421 E=    -877.046800137532     steps=  113 RMS= 0.64966E-02 Markov E=    -879.751570404041     t=       42.9
 Qu       1422 E=    -849.872487595664     steps=  284 RMS= 0.58680E-02 Markov E=    -879.751570404041     t=       43.0
 Qu       1423 E=    -870.368033010475     steps=  126 RMS= 0.57993E-02 Markov E=    -879.751570404041     t=       43.0
 Qu       1424 E=    -879.389636088340     steps=  132 RMS= 0.47540E-02 Markov E=    -879.751570404041     t=       43.0
 Qu       1425 E=    -877.348786854811     steps=  182 RMS= 0.43576E-02 Markov E=    -879.389636088340     t=       43.0
 Qu       1426 E=    -879.377168898981     steps=  171 RMS= 0.46353E-02 Markov E=    -879.389636088340     t=       43.1
 Qu       1427 E=    -849.065122997442     steps=  285 RMS= 0.68542E-02 Markov E=    -879.377168898981     t=       43.1
 Qu       1428 E=    -878.345890253774     steps=   94 RMS= 0.67544E-02 Markov E=    -879.377168898981     t=       43.1
 Qu       1429 E=    -872.317422401778     steps=  153 RMS= 0.66894E-02 Markov E=    -878.345890253774     t=       43.1
 Qu       1430 E=    -868.336413927708     steps=  194 RMS= 0.67483E-02 Markov E=    -878.345890253774     t=       43.2
 Qu       1431 E=    -875.779407207477     steps=  171 RMS= 0.62566E-02 Markov E=    -878.345890253774     t=       43.2
 Qu       1432 E=    -872.186537199729     steps=  264 RMS= 0.52800E-02 Markov E=    -878.345890253774     t=       43.2
 Qu       1433 E=    -875.931956092885     steps=  122 RMS= 0.39676E-02 Markov E=    -878.345890253774     t=       43.2
 Qu       1434 E=    -878.774108767752     steps=  272 RMS= 0.54933E-02 Markov E=    -878.345890253774     t=       43.3
 Qu       1435 E=    -875.126640621761     steps=  103 RMS= 0.61779E-02 Markov E=    -878.774108767752     t=       43.3
 Qu       1436 E=    -845.735552634054     steps=  322 RMS= 0.65796E-02 Markov E=    -878.774108767752     t=       43.3
 Qu       1437 E=    -867.360592212344     steps=  130 RMS= 0.61397E-02 Markov E=    -878.774108767752     t=       43.3
 Qu       1438 E=    -872.386717026013     steps=  170 RMS= 0.55649E-02 Markov E=    -878.774108767752     t=       43.4
 Qu       1439 E=    -866.341598289155     steps=  266 RMS= 0.64141E-02 Markov E=    -878.774108767752     t=       43.4
 Qu       1440 E=    -845.187181024632     steps=  427 RMS= 0.68660E-02 Markov E=    -878.774108767752     t=       43.5
 Qu       1441 E=    -844.078699276260     steps=  207 RMS= 0.67260E-02 Markov E=    -878.774108767752     t=       43.5
 Qu       1442 E=    -856.675124627381     steps=  310 RMS= 0.64956E-02 Markov E=    -878.774108767752     t=       43.5
 Qu       1443 E=    -878.532602358274     steps=  104 RMS= 0.59170E-02 Markov E=    -878.774108767752     t=       43.6
 Qu       1444 E=    -878.340912232681     steps=  124 RMS= 0.64952E-02 Markov E=    -878.774108767752     t=       43.6
 Qu       1445 E=    -855.767003027514     steps=  475 RMS= 0.53425E-02 Markov E=    -878.340912232681     t=       43.6
 Qu       1446 E=    -871.757605204615     steps=  172 RMS= 0.52227E-02 Markov E=    -878.340912232681     t=       43.7
 Qu       1447 E=    -876.400258716007     steps=   98 RMS= 0.63489E-02 Markov E=    -878.340912232681     t=       43.7
 Qu       1448 E=    -878.684197907425     steps=  134 RMS= 0.62706E-02 Markov E=    -878.340912232681     t=       43.7
 Qu       1449 E=    -874.059755236457     steps=  177 RMS= 0.56618E-02 Markov E=    -878.684197907425     t=       43.7
 Qu       1450 E=    -873.737271844535     steps=  170 RMS= 0.58463E-02 Markov E=    -878.684197907425     t=       43.7
Acceptance ratio for previous     50 steps=  0.1400  FAC=  1.0500
 Qu       1451 E=    -874.421202470399     steps=  299 RMS= 0.60884E-02 Markov E=    -878.684197907425     t=       43.8
 Qu       1452 E=    -867.574444717111     steps=  228 RMS= 0.54529E-02 Markov E=    -878.684197907425     t=       43.8
 Qu       1453 E=    -878.474367807233     steps=  122 RMS= 0.69698E-02 Markov E=    -878.684197907425     t=       43.8
 Qu       1454 E=    -872.671524057880     steps=  195 RMS= 0.54850E-02 Markov E=    -878.474367807233     t=       43.9
 Qu       1455 E=    -853.599526711317     steps=  395 RMS= 0.63935E-02 Markov E=    -878.474367807233     t=       43.9
 Qu       1456 E=    -876.796767486914     steps=  125 RMS= 0.68545E-02 Markov E=    -878.474367807233     t=       43.9
 Qu       1457 E=    -875.124020703229     steps=  227 RMS= 0.57453E-02 Markov E=    -878.474367807233     t=       44.0
 Qu       1458 E=    -836.801328938773     steps=  263 RMS= 0.61301E-02 Markov E=    -878.474367807233     t=       44.0
 Qu       1459 E=    -877.253298793437     steps=  141 RMS= 0.60813E-02 Markov E=    -878.474367807233     t=       44.0
 Qu       1460 E=    -878.474484470579     steps=   89 RMS= 0.54101E-02 Markov E=    -878.474367807233     t=       44.0
 Qu       1461 E=    -874.831923321366     steps=   96 RMS= 0.36348E-02 Markov E=    -878.474484470579     t=       44.1
 Qu       1462 E=    -874.898812873081     steps=  233 RMS= 0.69372E-02 Markov E=    -878.474484470579     t=       44.1
 Qu       1463 E=    -842.452045432956     steps=  271 RMS= 0.65523E-02 Markov E=    -878.474484470579     t=       44.1
 Qu       1464 E=    -876.157391093780     steps=  132 RMS= 0.46766E-02 Markov E=    -878.474484470579     t=       44.1
 Qu       1465 E=    -877.180273969314     steps=  105 RMS= 0.60009E-02 Markov E=    -878.474484470579     t=       44.2
 Qu       1466 E=    -868.664443695133     steps=  171 RMS= 0.64818E-02 Markov E=    -877.180273969314     t=       44.2
 Qu       1467 E=    -875.990309831993     steps=  101 RMS= 0.66624E-02 Markov E=    -877.180273969314     t=       44.2
 Qu       1468 E=    -869.562164399971     steps=  132 RMS= 0.63411E-02 Markov E=    -875.990309831993     t=       44.2
 Qu       1469 E=    -876.386162544115     steps=  169 RMS= 0.36917E-02 Markov E=    -875.990309831993     t=       44.2
 Qu       1470 E=    -872.738242511050     steps=  198 RMS= 0.68099E-02 Markov E=    -876.386162544115     t=       44.3
 Qu       1471 E=    -872.617970955909     steps=  108 RMS= 0.51291E-02 Markov E=    -876.386162544115     t=       44.3
 Qu       1472 E=    -842.660038598203     steps=  351 RMS= 0.65018E-02 Markov E=    -876.386162544115     t=       44.3
 Qu       1473 E=    -877.308318533207     steps=  132 RMS= 0.67916E-02 Markov E=    -876.386162544115     t=       44.3
 Qu       1474 E=    -860.923541967422     steps=  198 RMS= 0.67955E-02 Markov E=    -877.308318533207     t=       44.4
 Qu       1475 E=    -877.088437962178     steps=  108 RMS= 0.53764E-02 Markov E=    -877.308318533207     t=       44.4
 Qu       1476 E=    -862.600627238594     steps=  189 RMS= 0.67018E-02 Markov E=    -877.088437962178     t=       44.4
 Qu       1477 E=    -869.054387781308     steps=  409 RMS= 0.64706E-02 Markov E=    -877.088437962178     t=       44.5
 Qu       1478 E=    -855.245703894047     steps=  248 RMS= 0.65475E-02 Markov E=    -877.088437962178     t=       44.5
 Qu       1479 E=    -866.965792244467     steps=  246 RMS= 0.35610E-02 Markov E=    -877.088437962178     t=       44.5
 Qu       1480 E=    -878.334862492993     steps=  116 RMS= 0.67192E-02 Markov E=    -877.088437962178     t=       44.6
 Qu       1481 E=    -861.396023041328     steps=  314 RMS= 0.47129E-02 Markov E=    -878.334862492993     t=       44.6
 Qu       1482 E=    -877.887474741094     steps=  124 RMS= 0.62607E-02 Markov E=    -878.334862492993     t=       44.6
 Qu       1483 E=    -869.395433597360     steps=  308 RMS= 0.62246E-02 Markov E=    -877.887474741094     t=       44.7
 Qu       1484 E=    -855.567696130435     steps=  176 RMS= 0.64470E-02 Markov E=    -877.887474741094     t=       44.7
 Qu       1485 E=    -873.158022282220     steps=  128 RMS= 0.42107E-02 Markov E=    -877.887474741094     t=       44.7
 Qu       1486 E=    -871.815276191162     steps=  151 RMS= 0.43195E-02 Markov E=    -877.887474741094     t=       44.7
 Qu       1487 E=    -874.219552008717     steps=  132 RMS= 0.52708E-02 Markov E=    -877.887474741094     t=       44.7
 Qu       1488 E=    -875.719897349105     steps=  121 RMS= 0.69362E-02 Markov E=    -877.887474741094     t=       44.8
 Qu       1489 E=    -872.454358550351     steps=  136 RMS= 0.47880E-02 Markov E=    -877.887474741094     t=       44.8
 Qu       1490 E=    -841.491468601687     steps=  317 RMS= 0.54786E-02 Markov E=    -877.887474741094     t=       44.8
 Qu       1491 E=    -877.215505627951     steps=  174 RMS= 0.62021E-02 Markov E=    -877.887474741094     t=       44.9
 Qu       1492 E=    -876.111924652515     steps=  357 RMS= 0.55724E-02 Markov E=    -877.215505627951     t=       44.9
 Qu       1493 E=    -875.881753136668     steps=  155 RMS= 0.42583E-02 Markov E=    -877.215505627951     t=       44.9
 Qu       1494 E=    -870.575606085186     steps=  114 RMS= 0.67203E-02 Markov E=    -877.215505627951     t=       44.9
 Qu       1495 E=    -871.151958999620     steps=  169 RMS= 0.66450E-02 Markov E=    -877.215505627951     t=       45.0
 Qu       1496 E=    -866.526574000917     steps=  271 RMS= 0.53975E-02 Markov E=    -877.215505627951     t=       45.0
 Qu       1497 E=    -872.935895972824     steps=  168 RMS= 0.68046E-02 Markov E=    -877.215505627951     t=       45.0
 Qu       1498 E=    -870.622133521665     steps=   97 RMS= 0.60110E-02 Markov E=    -877.215505627951     t=       45.0
 Qu       1499 E=    -865.315046888870     steps=  382 RMS= 0.55121E-02 Markov E=    -877.215505627951     t=       45.1
 Qu       1500 E=    -874.411858775884     steps=  193 RMS= 0.49563E-02 Markov E=    -877.215505627951     t=       45.1
Acceptance ratio for previous     50 steps=  0.2000  FAC=  1.0500
 Qu       1501 E=    -876.956673542395     steps=  130 RMS= 0.67857E-02 Markov E=    -877.215505627951     t=       45.1
 Qu       1502 E=    -874.961875745217     steps=  137 RMS= 0.68776E-02 Markov E=    -876.956673542395     t=       45.2
 Qu       1503 E=    -871.095153201752     steps=  158 RMS= 0.67437E-02 Markov E=    -876.956673542395     t=       45.2
 Qu       1504 E=    -857.377514478857     steps=  227 RMS= 0.62365E-02 Markov E=    -876.956673542395     t=       45.2
 Qu       1505 E=    -875.289522400522     steps=  167 RMS= 0.58655E-02 Markov E=    -876.956673542395     t=       45.2
 Qu       1506 E=    -854.210745261652     steps=  207 RMS= 0.57342E-02 Markov E=    -876.956673542395     t=       45.3
 Qu       1507 E=    -876.881839436196     steps=  148 RMS= 0.69007E-02 Markov E=    -876.956673542395     t=       45.3
 Qu       1508 E=    -867.955286661373     steps=  289 RMS= 0.58208E-02 Markov E=    -876.956673542395     t=       45.3
 Qu       1509 E=    -872.703099236740     steps=  105 RMS= 0.54057E-02 Markov E=    -876.956673542395     t=       45.3
 Qu       1510 E=    -858.929990092180     steps=  217 RMS= 0.62557E-02 Markov E=    -876.956673542395     t=       45.4
 Qu       1511 E=    -874.409607031667     steps=  170 RMS= 0.50096E-02 Markov E=    -876.956673542395     t=       45.4
 Qu       1512 E=    -847.114872660861     steps=  448 RMS= 0.63885E-02 Markov E=    -874.409607031667     t=       45.5
 Qu       1513 E=    -873.351972446451     steps=  140 RMS= 0.48251E-02 Markov E=    -874.409607031667     t=       45.5
 Qu       1514 E=    -847.657573057077     steps=  284 RMS= 0.67868E-02 Markov E=    -873.351972446451     t=       45.5
 Qu       1515 E=    -868.504600150004     steps=  176 RMS= 0.51564E-02 Markov E=    -873.351972446451     t=       45.5
 Qu       1516 E=    -836.549563708445     steps=  150 RMS= 0.66797E-02 Markov E=    -873.351972446451     t=       45.6
 Qu       1517 E=    -873.334126935868     steps=  291 RMS= 0.64457E-02 Markov E=    -873.351972446451     t=       45.6
 Qu       1518 E=    -851.223323532348     steps=  428 RMS= 0.67560E-02 Markov E=    -873.334126935868     t=       45.7
 Qu       1519 E=    -873.470882463641     steps=  141 RMS= 0.60085E-02 Markov E=    -873.334126935868     t=       45.7
 Qu       1520 E=    -852.826702989741     steps=  312 RMS= 0.54561E-02 Markov E=    -873.470882463641     t=       45.7
 Qu       1521 E=    -862.424348556143     steps=  177 RMS= 0.51692E-02 Markov E=    -873.470882463641     t=       45.8
 Qu       1522 E=    -870.384667162795     steps=  207 RMS= 0.67923E-02 Markov E=    -873.470882463641     t=       45.8
 Qu       1523 E=    -875.016193369867     steps=  188 RMS= 0.64398E-02 Markov E=    -873.470882463641     t=       45.8
 Qu       1524 E=    -874.008503888181     steps=  120 RMS= 0.50789E-02 Markov E=    -875.016193369867     t=       45.8
 Qu       1525 E=    -847.012713636718     steps=  455 RMS= 0.61022E-02 Markov E=    -875.016193369867     t=       45.9
 Qu       1526 E=    -875.533678235774     steps=  139 RMS= 0.51446E-02 Markov E=    -875.016193369867     t=       45.9
 Qu       1527 E=    -848.137047624906     steps=  241 RMS= 0.68151E-02 Markov E=    -875.533678235774     t=       45.9
 Qu       1528 E=    -876.316004201557     steps=  127 RMS= 0.64770E-02 Markov E=    -875.533678235774     t=       46.0
 Qu       1529 E=    -874.088620643446     steps=  132 RMS= 0.64600E-02 Markov E=    -876.316004201557     t=       46.0
 Qu       1530 E=    -875.667586249311     steps=   79 RMS= 0.60418E-02 Markov E=    -876.316004201557     t=       46.0
 Qu       1531 E=    -874.543720284141     steps=  253 RMS= 0.57045E-02 Markov E=    -875.667586249311     t=       46.0
 Qu       1532 E=    -876.057744760323     steps=  196 RMS= 0.62253E-02 Markov E=    -874.543720284141     t=       46.1
 Qu       1533 E=    -871.865456629828     steps=  225 RMS= 0.67194E-02 Markov E=    -876.057744760323     t=       46.1
 Qu       1534 E=    -874.780943604195     steps=  116 RMS= 0.60641E-02 Markov E=    -876.057744760323     t=       46.1
 Qu       1535 E=    -874.869435414031     steps=   90 RMS= 0.66882E-02 Markov E=    -876.057744760323     t=       46.1
 Qu       1536 E=    -874.750160754043     steps=  117 RMS= 0.64952E-02 Markov E=    -874.869435414031     t=       46.1
 Qu       1537 E=    -872.989037507600     steps=  107 RMS= 0.46206E-02 Markov E=    -874.750160754043     t=       46.2
 Qu       1538 E=    -876.866602572706     steps=  112 RMS= 0.53776E-02 Markov E=    -874.750160754043     t=       46.2
 Qu       1539 E=    -875.540681341504     steps=  130 RMS= 0.62240E-02 Markov E=    -876.866602572706     t=       46.2
 Qu       1540 E=    -874.008645233972     steps=  258 RMS= 0.50639E-02 Markov E=    -876.866602572706     t=       46.2
 Qu       1541 E=    -875.264034088699     steps=  127 RMS= 0.39484E-02 Markov E=    -876.866602572706     t=       46.3
 Qu       1542 E=    -875.690704176944     steps=  243 RMS= 0.48141E-02 Markov E=    -876.866602572706     t=       46.3
 Qu       1543 E=    -875.660310359631     steps=  136 RMS= 0.53099E-02 Markov E=    -876.866602572706     t=       46.3
 Qu       1544 E=    -876.109938870613     steps=   90 RMS= 0.62758E-02 Markov E=    -876.866602572706     t=       46.3
 Qu       1545 E=    -854.345809415903     steps=  317 RMS= 0.65682E-02 Markov E=    -876.109938870613     t=       46.4
 Qu       1546 E=    -876.508692366224     steps=  135 RMS= 0.69234E-02 Markov E=    -876.109938870613     t=       46.4
 Qu       1547 E=    -869.826966956978     steps=  164 RMS= 0.67380E-02 Markov E=    -876.508692366224     t=       46.4
 Qu       1548 E=    -844.253878438006     steps=  253 RMS= 0.67078E-02 Markov E=    -876.508692366224     t=       46.4
 Qu       1549 E=    -845.904289862724     steps=  294 RMS= 0.62369E-02 Markov E=    -876.508692366224     t=       46.5
 Qu       1550 E=    -851.704046662621     steps=  451 RMS= 0.58507E-02 Markov E=    -876.508692366224     t=       46.5
Acceptance ratio for previous     50 steps=  0.3200  FAC=  1.0500
 Qu       1551 E=    -867.313180667499     steps=  303 RMS= 0.63655E-02 Markov E=    -876.508692366224     t=       46.6
 Qu       1552 E=    -871.238764412149     steps=  169 RMS= 0.57493E-02 Markov E=    -876.508692366224     t=       46.6
 Qu       1553 E=    -842.348086134157     steps=  383 RMS= 0.59895E-02 Markov E=    -876.508692366224     t=       46.7
 Qu       1554 E=    -877.278481495827     steps=  120 RMS= 0.51789E-02 Markov E=    -876.508692366224     t=       46.7
 Qu       1555 E=    -870.251250141562     steps=  331 RMS= 0.41253E-02 Markov E=    -877.278481495827     t=       46.7
 Qu       1556 E=    -877.168642564140     steps=   95 RMS= 0.61542E-02 Markov E=    -877.278481495827     t=       46.7
 Qu       1557 E=    -877.058930989980     steps=  119 RMS= 0.59376E-02 Markov E=    -877.168642564140     t=       46.8
 Qu       1558 E=    -877.370246410109     steps=  172 RMS= 0.42303E-02 Markov E=    -877.058930989980     t=       46.8
 Qu       1559 E=    -876.246908680888     steps=  155 RMS= 0.69877E-02 Markov E=    -877.370246410109     t=       46.8
 Qu       1560 E=    -872.379923731149     steps=  126 RMS= 0.64679E-02 Markov E=    -876.246908680888     t=       46.8
 Qu       1561 E=    -855.168955836367     steps=  166 RMS= 0.66619E-02 Markov E=    -876.246908680888     t=       46.8
 Qu       1562 E=    -869.140526534747     steps=  226 RMS= 0.60818E-02 Markov E=    -876.246908680888     t=       46.9
 Qu       1563 E=    -875.319047673122     steps=   98 RMS= 0.65851E-02 Markov E=    -876.246908680888     t=       46.9
 Qu       1564 E=    -846.030241859247     steps=  320 RMS= 0.65564E-02 Markov E=    -876.246908680888     t=       46.9
 Qu       1565 E=    -864.867379543333     steps=  243 RMS= 0.51856E-02 Markov E=    -876.246908680888     t=       47.0
 Qu       1566 E=    -872.938320119916     steps=  328 RMS= 0.50783E-02 Markov E=    -876.246908680888     t=       47.0
 Qu       1567 E=    -855.800415221402     steps=  253 RMS= 0.65832E-02 Markov E=    -876.246908680888     t=       47.0
 Qu       1568 E=    -860.923559289181     steps=  281 RMS= 0.66778E-02 Markov E=    -876.246908680888     t=       47.1
 Qu       1569 E=    -846.033940257026     steps=  240 RMS= 0.61706E-02 Markov E=    -876.246908680888     t=       47.1
 Qu       1570 E=    -855.652257081779     steps=  418 RMS= 0.68445E-02 Markov E=    -876.246908680888     t=       47.2
 Qu       1571 E=    -872.646551077247     steps=  139 RMS= 0.59225E-02 Markov E=    -876.246908680888     t=       47.2
 Qu       1572 E=    -868.438795426357     steps=  199 RMS= 0.57102E-02 Markov E=    -876.246908680888     t=       47.2
 Qu       1573 E=    -846.956063196411     steps=  209 RMS= 0.60751E-02 Markov E=    -876.246908680888     t=       47.3
 Qu       1574 E=    -873.743613471523     steps=  233 RMS= 0.55779E-02 Markov E=    -876.246908680888     t=       47.3
 Qu       1575 E=    -843.249950238094     steps=  219 RMS= 0.66541E-02 Markov E=    -876.246908680888     t=       47.3
 Qu       1576 E=    -874.233243410540     steps=  300 RMS= 0.69417E-02 Markov E=    -876.246908680888     t=       47.4
 Qu       1577 E=    -867.149682227220     steps=  257 RMS= 0.67283E-02 Markov E=    -876.246908680888     t=       47.4
 Qu       1578 E=    -868.111917472871     steps=  175 RMS= 0.54746E-02 Markov E=    -876.246908680888     t=       47.4
 Qu       1579 E=    -868.986860685136     steps=  151 RMS= 0.51206E-02 Markov E=    -876.246908680888     t=       47.4
 Qu       1580 E=    -840.980168407137     steps=  264 RMS= 0.57171E-02 Markov E=    -876.246908680888     t=       47.5
 Qu       1581 E=    -861.890529988730     steps=  406 RMS= 0.64073E-02 Markov E=    -876.246908680888     t=       47.5
 Qu       1582 E=    -871.662145690099     steps=  178 RMS= 0.45026E-02 Markov E=    -876.246908680888     t=       47.6
 Qu       1583 E=    -847.229176302827     steps=  280 RMS= 0.69706E-02 Markov E=    -876.246908680888     t=       47.6
 Qu       1584 E=    -846.805504468730     steps=  254 RMS= 0.65214E-02 Markov E=    -876.246908680888     t=       47.6
 Qu       1585 E=    -839.674103602004     steps=  312 RMS= 0.63254E-02 Markov E=    -876.246908680888     t=       47.7
 Qu       1586 E=    -846.477855253320     steps=  532 RMS= 0.59100E-02 Markov E=    -876.246908680888     t=       47.8
 Qu       1587 E=    -848.455318406668     steps=  379 RMS= 0.69632E-02 Markov E=    -876.246908680888     t=       47.8
 Qu       1588 E=    -850.451248701819     steps=  392 RMS= 0.69876E-02 Markov E=    -876.246908680888     t=       47.9
 Qu       1589 E=    -875.432222422291     steps=  444 RMS= 0.51498E-02 Markov E=    -876.246908680888     t=       47.9
 Qu       1590 E=    -848.602055545415     steps=  214 RMS= 0.69624E-02 Markov E=    -876.246908680888     t=       48.0
 Qu       1591 E=    -843.111510542169     steps=  311 RMS= 0.53664E-02 Markov E=    -876.246908680888     t=       48.0
 Qu       1592 E=    -846.714441920007     steps=  500 RMS= 0.62070E-02 Markov E=    -876.246908680888     t=       48.1
 Qu       1593 E=    -873.285901882872     steps=  539 RMS= 0.47762E-02 Markov E=    -876.246908680888     t=       48.1
 Qu       1594 E=    -873.524818239167     steps=  103 RMS= 0.57206E-02 Markov E=    -876.246908680888     t=       48.2
 Qu       1595 E=    -859.473439431014     steps=  294 RMS= 0.61119E-02 Markov E=    -876.246908680888     t=       48.2
 Qu       1596 E=    -843.838250688759     steps=  362 RMS= 0.56691E-02 Markov E=    -876.246908680888     t=       48.2
 Qu       1597 E=    -870.091607941174     steps=  142 RMS= 0.68587E-02 Markov E=    -876.246908680888     t=       48.3
 Qu       1598 E=    -863.701161989897     steps=  146 RMS= 0.68541E-02 Markov E=    -876.246908680888     t=       48.3
 Qu       1599 E=    -873.260825695645     steps=  441 RMS= 0.66446E-02 Markov E=    -876.246908680888     t=       48.3
 Qu       1600 E=    -876.337693711423     steps=  143 RMS= 0.52147E-02 Markov E=    -876.246908680888     t=       48.4
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1601 E=    -874.727794405581     steps=  119 RMS= 0.58507E-02 Markov E=    -876.337693711423     t=       48.4
 Qu       1602 E=    -870.573460914037     steps=  130 RMS= 0.49036E-02 Markov E=    -876.337693711423     t=       48.4
 Qu       1603 E=    -870.216822268366     steps=  140 RMS= 0.66719E-02 Markov E=    -876.337693711423     t=       48.4
 Qu       1604 E=    -857.197616787012     steps=  227 RMS= 0.67943E-02 Markov E=    -876.337693711423     t=       48.5
 Qu       1605 E=    -869.889173158858     steps=  171 RMS= 0.53635E-02 Markov E=    -876.337693711423     t=       48.5
 Qu       1606 E=    -847.892474925929     steps=  374 RMS= 0.59648E-02 Markov E=    -876.337693711423     t=       48.5
 Qu       1607 E=    -860.552827287514     steps=  228 RMS= 0.60553E-02 Markov E=    -876.337693711423     t=       48.6
 Qu       1608 E=    -875.416718253364     steps=   96 RMS= 0.66055E-02 Markov E=    -876.337693711423     t=       48.6
 Qu       1609 E=    -871.657004103336     steps=  178 RMS= 0.62329E-02 Markov E=    -876.337693711423     t=       48.6
 Qu       1610 E=    -875.233017305140     steps=  171 RMS= 0.63374E-02 Markov E=    -876.337693711423     t=       48.6
 Qu       1611 E=    -844.841749043410     steps=  290 RMS= 0.64772E-02 Markov E=    -876.337693711423     t=       48.7
 Qu       1612 E=    -871.013471637001     steps=  125 RMS= 0.58597E-02 Markov E=    -876.337693711423     t=       48.7
 Qu       1613 E=    -872.703856150716     steps=  196 RMS= 0.65702E-02 Markov E=    -876.337693711423     t=       48.7
 Qu       1614 E=    -873.181149572116     steps=  125 RMS= 0.56853E-02 Markov E=    -876.337693711423     t=       48.7
 Qu       1615 E=    -874.477522454424     steps=  195 RMS= 0.47251E-02 Markov E=    -876.337693711423     t=       48.7
 Qu       1616 E=    -851.553755501862     steps=  381 RMS= 0.57643E-02 Markov E=    -874.477522454424     t=       48.8
 Qu       1617 E=    -867.051503916888     steps=  150 RMS= 0.57076E-02 Markov E=    -874.477522454424     t=       48.8
 Qu       1618 E=    -871.043568900573     steps=  127 RMS= 0.63666E-02 Markov E=    -874.477522454424     t=       48.8
 Qu       1619 E=    -847.242811124073     steps=  255 RMS= 0.55189E-02 Markov E=    -874.477522454424     t=       48.9
 Qu       1620 E=    -869.699792221092     steps=  152 RMS= 0.69172E-02 Markov E=    -874.477522454424     t=       48.9
 Qu       1621 E=    -854.307891569293     steps=  177 RMS= 0.63743E-02 Markov E=    -874.477522454424     t=       48.9
 Qu       1622 E=    -873.311724153421     steps=  121 RMS= 0.61498E-02 Markov E=    -874.477522454424     t=       48.9
 Qu       1623 E=    -851.063846130873     steps=  296 RMS= 0.59104E-02 Markov E=    -873.311724153421     t=       49.0
 Qu       1624 E=    -855.916587292653     steps=  557 RMS= 0.66582E-02 Markov E=    -873.311724153421     t=       49.0
 Qu       1625 E=    -869.439914074738     steps=  158 RMS= 0.67905E-02 Markov E=    -873.311724153421     t=       49.1
 Qu       1626 E=    -872.283649925085     steps=  103 RMS= 0.65568E-02 Markov E=    -873.311724153421     t=       49.1
 Qu       1627 E=    -869.462771321612     steps=  236 RMS= 0.51914E-02 Markov E=    -872.283649925085     t=       49.1
 Qu       1628 E=    -867.687063467273     steps=  318 RMS= 0.47608E-02 Markov E=    -872.283649925085     t=       49.1
 Qu       1629 E=    -841.421084287798     steps=  349 RMS= 0.65832E-02 Markov E=    -872.283649925085     t=       49.2
 Qu       1630 E=    -871.970970162067     steps=  148 RMS= 0.42911E-02 Markov E=    -872.283649925085     t=       49.2
 Qu       1631 E=    -843.112612368099     steps=  214 RMS= 0.62307E-02 Markov E=    -871.970970162067     t=       49.2
 Qu       1632 E=    -850.644471905463     steps=  406 RMS= 0.51874E-02 Markov E=    -871.970970162067     t=       49.3
 Qu       1633 E=    -868.005132980273     steps=  128 RMS= 0.68111E-02 Markov E=    -871.970970162067     t=       49.3
 Qu       1634 E=    -873.310458989078     steps=  122 RMS= 0.51070E-02 Markov E=    -871.970970162067     t=       49.3
 Qu       1635 E=    -870.776522776716     steps=  239 RMS= 0.57468E-02 Markov E=    -873.310458989078     t=       49.4
 Qu       1636 E=    -855.946769590244     steps=  247 RMS= 0.52338E-02 Markov E=    -873.310458989078     t=       49.4
 Qu       1637 E=    -870.031688138597     steps=  121 RMS= 0.52157E-02 Markov E=    -873.310458989078     t=       49.4
 Qu       1638 E=    -851.480561610932     steps=  408 RMS= 0.63098E-02 Markov E=    -873.310458989078     t=       49.5
 Qu       1639 E=    -838.968743520230     steps=  176 RMS= 0.56728E-02 Markov E=    -873.310458989078     t=       49.5
 Qu       1640 E=    -873.145992827806     steps=   93 RMS= 0.69018E-02 Markov E=    -873.310458989078     t=       49.5
 Qu       1641 E=    -845.872824503918     steps=  238 RMS= 0.52666E-02 Markov E=    -873.145992827806     t=       49.5
 Qu       1642 E=    -858.032001094634     steps=  590 RMS= 0.63200E-02 Markov E=    -873.145992827806     t=       49.6
 Qu       1643 E=    -870.995283483503     steps=  217 RMS= 0.53776E-02 Markov E=    -873.145992827806     t=       49.6
 Qu       1644 E=    -864.126311968548     steps=  173 RMS= 0.57270E-02 Markov E=    -873.145992827806     t=       49.7
 Qu       1645 E=    -849.261214627698     steps=  353 RMS= 0.57996E-02 Markov E=    -873.145992827806     t=       49.7
 Qu       1646 E=    -839.346105717517     steps=  192 RMS= 0.66510E-02 Markov E=    -873.145992827806     t=       49.7
 Qu       1647 E=    -869.200625020555     steps=  113 RMS= 0.67046E-02 Markov E=    -873.145992827806     t=       49.8
 Qu       1648 E=    -843.666616639592     steps=  332 RMS= 0.58182E-02 Markov E=    -873.145992827806     t=       49.8
 Qu       1649 E=    -847.693133712597     steps=  230 RMS= 0.61168E-02 Markov E=    -873.145992827806     t=       49.8
 Qu       1650 E=    -861.747881591085     steps=  277 RMS= 0.49802E-02 Markov E=    -873.145992827806     t=       49.9
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1651 E=    -866.189958215687     steps=  157 RMS= 0.58732E-02 Markov E=    -873.145992827806     t=       49.9
 Qu       1652 E=    -868.687422024096     steps=  103 RMS= 0.46868E-02 Markov E=    -873.145992827806     t=       49.9
 Qu       1653 E=    -871.024592614362     steps=  146 RMS= 0.60342E-02 Markov E=    -873.145992827806     t=       49.9
 Qu       1654 E=    -873.164268315211     steps=  226 RMS= 0.60964E-02 Markov E=    -873.145992827806     t=       50.0
 Qu       1655 E=    -865.771324626674     steps=  270 RMS= 0.59425E-02 Markov E=    -873.164268315211     t=       50.0
 Qu       1656 E=    -847.002863111820     steps=  184 RMS= 0.68336E-02 Markov E=    -873.164268315211     t=       50.0
 Qu       1657 E=    -843.483529934757     steps=  299 RMS= 0.62055E-02 Markov E=    -873.164268315211     t=       50.1
 Qu       1658 E=    -865.545929240275     steps=  110 RMS= 0.55168E-02 Markov E=    -873.164268315211     t=       50.1
 Qu       1659 E=    -862.821110222058     steps=  321 RMS= 0.56300E-02 Markov E=    -873.164268315211     t=       50.1
 Qu       1660 E=    -870.988979855035     steps=  130 RMS= 0.51907E-02 Markov E=    -873.164268315211     t=       50.1
 Qu       1661 E=    -865.018777679872     steps=   97 RMS= 0.59125E-02 Markov E=    -870.988979855035     t=       50.1
 Qu       1662 E=    -866.191321348010     steps=  219 RMS= 0.51426E-02 Markov E=    -870.988979855035     t=       50.2
 Qu       1663 E=    -866.692854026759     steps=  132 RMS= 0.57327E-02 Markov E=    -870.988979855035     t=       50.2
 Qu       1664 E=    -870.291039211093     steps=  105 RMS= 0.62147E-02 Markov E=    -870.988979855035     t=       50.2
 Qu       1665 E=    -865.385388857266     steps=  156 RMS= 0.42311E-02 Markov E=    -870.291039211093     t=       50.2
 Qu       1666 E=    -866.049491055249     steps=  303 RMS= 0.62885E-02 Markov E=    -870.291039211093     t=       50.3
 Qu       1667 E=    -869.722501888213     steps=  207 RMS= 0.64036E-02 Markov E=    -870.291039211093     t=       50.3
 Qu       1668 E=    -870.490933422606     steps=  151 RMS= 0.53724E-02 Markov E=    -869.722501888213     t=       50.3
 Qu       1669 E=    -868.761365705211     steps=  136 RMS= 0.63337E-02 Markov E=    -870.490933422606     t=       50.3
 Qu       1670 E=    -866.384598354471     steps=  150 RMS= 0.42615E-02 Markov E=    -870.490933422606     t=       50.3
 Qu       1671 E=    -869.958527767622     steps=  130 RMS= 0.35058E-02 Markov E=    -870.490933422606     t=       50.4
 Qu       1672 E=    -872.700348863065     steps=  184 RMS= 0.66630E-02 Markov E=    -869.958527767622     t=       50.4
 Qu       1673 E=    -865.046113614200     steps=  143 RMS= 0.63657E-02 Markov E=    -872.700348863065     t=       50.4
 Qu       1674 E=    -871.232226024028     steps=  180 RMS= 0.63463E-02 Markov E=    -872.700348863065     t=       50.4
 Qu       1675 E=    -875.932276480643     steps=  143 RMS= 0.55239E-02 Markov E=    -872.700348863065     t=       50.5
 Qu       1676 E=    -864.515977997292     steps=  163 RMS= 0.62455E-02 Markov E=    -875.932276480643     t=       50.5
 Qu       1677 E=    -868.463840400265     steps=  267 RMS= 0.45086E-02 Markov E=    -875.932276480643     t=       50.5
 Qu       1678 E=    -844.208718653532     steps=  306 RMS= 0.54675E-02 Markov E=    -875.932276480643     t=       50.6
 Qu       1679 E=    -873.281803806664     steps=  167 RMS= 0.69878E-02 Markov E=    -875.932276480643     t=       50.6
 Qu       1680 E=    -873.084007178487     steps=  245 RMS= 0.57978E-02 Markov E=    -875.932276480643     t=       50.6
 Qu       1681 E=    -874.274424528434     steps=  232 RMS= 0.60065E-02 Markov E=    -875.932276480643     t=       50.6
 Qu       1682 E=    -874.067630974621     steps=  112 RMS= 0.63569E-02 Markov E=    -874.274424528434     t=       50.7
 Qu       1683 E=    -869.112065134726     steps=  189 RMS= 0.68954E-02 Markov E=    -874.067630974621     t=       50.7
 Qu       1684 E=    -871.780401221622     steps=  148 RMS= 0.55761E-02 Markov E=    -874.067630974621     t=       50.7
 Qu       1685 E=    -872.319705101313     steps=  112 RMS= 0.50350E-02 Markov E=    -874.067630974621     t=       50.7
 Qu       1686 E=    -865.094020178828     steps=  216 RMS= 0.64384E-02 Markov E=    -874.067630974621     t=       50.7
 Qu       1687 E=    -874.117306902203     steps=  100 RMS= 0.62045E-02 Markov E=    -874.067630974621     t=       50.8
 Qu       1688 E=    -875.008605626621     steps=  100 RMS= 0.42691E-02 Markov E=    -874.117306902203     t=       50.8
 Qu       1689 E=    -872.830523283031     steps=   84 RMS= 0.57356E-02 Markov E=    -875.008605626621     t=       50.8
 Qu       1690 E=    -873.097783908676     steps=  108 RMS= 0.69367E-02 Markov E=    -875.008605626621     t=       50.8
 Qu       1691 E=    -870.672498946887     steps=  145 RMS= 0.57837E-02 Markov E=    -875.008605626621     t=       50.8
 Qu       1692 E=    -846.604379604414     steps=  239 RMS= 0.67142E-02 Markov E=    -875.008605626621     t=       50.9
 Qu       1693 E=    -870.155096770534     steps=  152 RMS= 0.67683E-02 Markov E=    -875.008605626621     t=       50.9
 Qu       1694 E=    -870.612705466529     steps=  231 RMS= 0.65627E-02 Markov E=    -875.008605626621     t=       50.9
 Qu       1695 E=    -853.971357393674     steps=  426 RMS= 0.68853E-02 Markov E=    -875.008605626621     t=       51.0
 Qu       1696 E=    -846.898166533029     steps=  383 RMS= 0.58227E-02 Markov E=    -875.008605626621     t=       51.0
 Qu       1697 E=    -871.639900627239     steps=  134 RMS= 0.46398E-02 Markov E=    -875.008605626621     t=       51.0
 Qu       1698 E=    -869.118842000344     steps=  131 RMS= 0.63108E-02 Markov E=    -875.008605626621     t=       51.0
 Qu       1699 E=    -875.506166178282     steps=  119 RMS= 0.68471E-02 Markov E=    -875.008605626621     t=       51.1
 Qu       1700 E=    -849.287495047477     steps=  367 RMS= 0.68433E-02 Markov E=    -875.506166178282     t=       51.1
Acceptance ratio for previous     50 steps=  0.2600  FAC=  1.0500
 Qu       1701 E=    -859.746902175141     steps=  271 RMS= 0.63760E-02 Markov E=    -875.506166178282     t=       51.1
 Qu       1702 E=    -871.252439159964     steps=  190 RMS= 0.50415E-02 Markov E=    -875.506166178282     t=       51.2
 Qu       1703 E=    -847.943269475817     steps=  383 RMS= 0.65501E-02 Markov E=    -875.506166178282     t=       51.2
 Qu       1704 E=    -867.621138095710     steps=  210 RMS= 0.51854E-02 Markov E=    -875.506166178282     t=       51.3
 Qu       1705 E=    -850.566691207836     steps=  405 RMS= 0.68572E-02 Markov E=    -875.506166178282     t=       51.3
 Qu       1706 E=    -875.294733258828     steps=  121 RMS= 0.55071E-02 Markov E=    -875.506166178282     t=       51.3
 Qu       1707 E=    -856.168792181059     steps=  239 RMS= 0.55988E-02 Markov E=    -875.506166178282     t=       51.4
 Qu       1708 E=    -870.783232019741     steps=  147 RMS= 0.61504E-02 Markov E=    -875.506166178282     t=       51.4
 Qu       1709 E=    -857.993126406993     steps=  176 RMS= 0.49319E-02 Markov E=    -875.506166178282     t=       51.4
 Qu       1710 E=    -875.616262863523     steps=  115 RMS= 0.32840E-02 Markov E=    -875.506166178282     t=       51.4
 Qu       1711 E=    -875.694703088608     steps=  121 RMS= 0.56573E-02 Markov E=    -875.616262863523     t=       51.4
 Qu       1712 E=    -843.403690687390     steps=  277 RMS= 0.65628E-02 Markov E=    -875.694703088608     t=       51.5
 Qu       1713 E=    -872.389212202729     steps=   99 RMS= 0.66991E-02 Markov E=    -875.694703088608     t=       51.5
 Qu       1714 E=    -849.466440256206     steps=  231 RMS= 0.54312E-02 Markov E=    -875.694703088608     t=       51.5
 Qu       1715 E=    -861.595474289821     steps=  289 RMS= 0.49681E-02 Markov E=    -875.694703088608     t=       51.6
 Qu       1716 E=    -863.644730993610     steps=  257 RMS= 0.58158E-02 Markov E=    -875.694703088608     t=       51.6
 Qu       1717 E=    -873.453640928987     steps=  103 RMS= 0.56603E-02 Markov E=    -875.694703088608     t=       51.6
 Qu       1718 E=    -874.337165958317     steps=  104 RMS= 0.68578E-02 Markov E=    -875.694703088608     t=       51.6
 Qu       1719 E=    -844.722036022838     steps=  414 RMS= 0.60857E-02 Markov E=    -875.694703088608     t=       51.7
 Qu       1720 E=    -855.835954053513     steps=  325 RMS= 0.66800E-02 Markov E=    -875.694703088608     t=       51.7
 Qu       1721 E=    -844.275039534353     steps=  236 RMS= 0.69109E-02 Markov E=    -875.694703088608     t=       51.7
 Qu       1722 E=    -873.801832947261     steps=  171 RMS= 0.50921E-02 Markov E=    -875.694703088608     t=       51.8
 Qu       1723 E=    -871.362813520045     steps=  160 RMS= 0.57023E-02 Markov E=    -873.801832947261     t=       51.8
 Qu       1724 E=    -866.580381942145     steps=  252 RMS= 0.68535E-02 Markov E=    -873.801832947261     t=       51.8
 Qu       1725 E=    -842.388930600177     steps=  473 RMS= 0.64906E-02 Markov E=    -873.801832947261     t=       51.9
 Qu       1726 E=    -859.509555130160     steps=  204 RMS= 0.57140E-02 Markov E=    -873.801832947261     t=       51.9
 Qu       1727 E=    -871.227671163313     steps=  168 RMS= 0.69889E-02 Markov E=    -873.801832947261     t=       51.9
 Qu       1728 E=    -872.959433705781     steps=  302 RMS= 0.59910E-02 Markov E=    -873.801832947261     t=       52.0
 Qu       1729 E=    -868.670930441182     steps=  152 RMS= 0.66934E-02 Markov E=    -873.801832947261     t=       52.0
 Qu       1730 E=    -873.783663013316     steps=  147 RMS= 0.64921E-02 Markov E=    -873.801832947261     t=       52.0
 Qu       1731 E=    -866.795842867933     steps=  121 RMS= 0.40567E-02 Markov E=    -873.783663013316     t=       52.0
 Qu       1732 E=    -873.837933551300     steps=  127 RMS= 0.55738E-02 Markov E=    -873.783663013316     t=       52.1
 Qu       1733 E=    -845.489050344505     steps=  521 RMS= 0.52750E-02 Markov E=    -873.837933551300     t=       52.1
 Qu       1734 E=    -850.987539453086     steps=  292 RMS= 0.68841E-02 Markov E=    -873.837933551300     t=       52.2
 Qu       1735 E=    -869.265654693020     steps=  186 RMS= 0.68696E-02 Markov E=    -873.837933551300     t=       52.2
 Qu       1736 E=    -870.180162569039     steps=  132 RMS= 0.66192E-02 Markov E=    -873.837933551300     t=       52.2
 Qu       1737 E=    -842.545135575511     steps=  260 RMS= 0.66633E-02 Markov E=    -873.837933551300     t=       52.3
 Qu       1738 E=    -869.276546908415     steps=  116 RMS= 0.56800E-02 Markov E=    -873.837933551300     t=       52.3
 Qu       1739 E=    -856.235466605799     steps=  144 RMS= 0.52476E-02 Markov E=    -873.837933551300     t=       52.3
 Qu       1740 E=    -869.111408884884     steps=  258 RMS= 0.49843E-02 Markov E=    -873.837933551300     t=       52.3
 Qu       1741 E=    -870.624499366021     steps=  145 RMS= 0.60141E-02 Markov E=    -873.837933551300     t=       52.3
 Qu       1742 E=    -866.043334816883     steps=  193 RMS= 0.66996E-02 Markov E=    -873.837933551300     t=       52.4
 Qu       1743 E=    -869.088771358201     steps=  316 RMS= 0.69543E-02 Markov E=    -873.837933551300     t=       52.4
 Qu       1744 E=    -869.850563514572     steps=  114 RMS= 0.47921E-02 Markov E=    -873.837933551300     t=       52.4
 Qu       1745 E=    -861.263883984335     steps=  251 RMS= 0.53635E-02 Markov E=    -873.837933551300     t=       52.5
 Qu       1746 E=    -872.494124691407     steps=  176 RMS= 0.63236E-02 Markov E=    -873.837933551300     t=       52.5
 Qu       1747 E=    -867.668958040124     steps=  248 RMS= 0.60045E-02 Markov E=    -873.837933551300     t=       52.5
 Qu       1748 E=    -859.784903334871     steps=  263 RMS= 0.63900E-02 Markov E=    -873.837933551300     t=       52.6
 Qu       1749 E=    -868.107881366938     steps=  140 RMS= 0.51931E-02 Markov E=    -873.837933551300     t=       52.6
 Qu       1750 E=    -873.956722645765     steps=  107 RMS= 0.68300E-02 Markov E=    -873.837933551300     t=       52.6
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1751 E=    -869.421325946422     steps=   92 RMS= 0.62600E-02 Markov E=    -873.956722645765     t=       52.6
 Qu       1752 E=    -870.420649570625     steps=  182 RMS= 0.51785E-02 Markov E=    -873.956722645765     t=       52.6
 Qu       1753 E=    -842.448265541131     steps=  227 RMS= 0.68981E-02 Markov E=    -873.956722645765     t=       52.7
 Qu       1754 E=    -843.677667260121     steps=  238 RMS= 0.67448E-02 Markov E=    -873.956722645765     t=       52.7
 Qu       1755 E=    -875.399108613889     steps=  108 RMS= 0.61625E-02 Markov E=    -873.956722645765     t=       52.7
 Qu       1756 E=    -871.925395035322     steps=  187 RMS= 0.56849E-02 Markov E=    -875.399108613889     t=       52.7
 Qu       1757 E=    -870.025765310788     steps=  142 RMS= 0.62264E-02 Markov E=    -875.399108613889     t=       52.7
 Qu       1758 E=    -871.389804404744     steps=  168 RMS= 0.49206E-02 Markov E=    -875.399108613889     t=       52.8
 Qu       1759 E=    -870.041836361409     steps=  197 RMS= 0.53805E-02 Markov E=    -875.399108613889     t=       52.8
 Qu       1760 E=    -849.506736745608     steps=  272 RMS= 0.67055E-02 Markov E=    -875.399108613889     t=       52.8
 Qu       1761 E=    -870.117249812045     steps=  141 RMS= 0.68691E-02 Markov E=    -875.399108613889     t=       52.9
 Qu       1762 E=    -873.106888210429     steps=  178 RMS= 0.66185E-02 Markov E=    -875.399108613889     t=       52.9
 Qu       1763 E=    -868.568096377420     steps=  161 RMS= 0.45191E-02 Markov E=    -875.399108613889     t=       52.9
 Qu       1764 E=    -861.116821022426     steps=  148 RMS= 0.55871E-02 Markov E=    -875.399108613889     t=       52.9
 Qu       1765 E=    -872.734908628667     steps=  196 RMS= 0.67670E-02 Markov E=    -875.399108613889     t=       52.9
 Qu       1766 E=    -873.919798398450     steps=  122 RMS= 0.63904E-02 Markov E=    -875.399108613889     t=       53.0
 Qu       1767 E=    -844.979698651075     steps=  404 RMS= 0.69348E-02 Markov E=    -875.399108613889     t=       53.0
 Qu       1768 E=    -872.618754321084     steps=  177 RMS= 0.63926E-02 Markov E=    -875.399108613889     t=       53.0
 Qu       1769 E=    -860.451678014842     steps=  207 RMS= 0.44170E-02 Markov E=    -875.399108613889     t=       53.1
 Qu       1770 E=    -865.100876407746     steps=  120 RMS= 0.69527E-02 Markov E=    -875.399108613889     t=       53.1
 Qu       1771 E=    -866.882372936630     steps=  322 RMS= 0.63947E-02 Markov E=    -875.399108613889     t=       53.1
 Qu       1772 E=    -869.355168278138     steps=  180 RMS= 0.68233E-02 Markov E=    -875.399108613889     t=       53.2
 Qu       1773 E=    -844.033104419394     steps=  228 RMS= 0.54816E-02 Markov E=    -875.399108613889     t=       53.2
 Qu       1774 E=    -862.838285948392     steps=  120 RMS= 0.54504E-02 Markov E=    -875.399108613889     t=       53.2
 Qu       1775 E=    -862.570246469426     steps=  173 RMS= 0.58749E-02 Markov E=    -875.399108613889     t=       53.2
 Qu       1776 E=    -864.298183742683     steps=  229 RMS= 0.68592E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1777 E=    -872.090562350836     steps=  165 RMS= 0.59753E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1778 E=    -868.994808254162     steps=  118 RMS= 0.69504E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1779 E=    -871.419267250967     steps=  137 RMS= 0.54346E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1780 E=    -866.743571106457     steps=  114 RMS= 0.39811E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1781 E=    -877.299560639123     steps=  117 RMS= 0.57751E-02 Markov E=    -875.399108613889     t=       53.3
 Qu       1782 E=    -854.470925225029     steps=  234 RMS= 0.59493E-02 Markov E=    -877.299560639123     t=       53.4
 Qu       1783 E=    -859.611680619793     steps=  153 RMS= 0.63211E-02 Markov E=    -877.299560639123     t=       53.4
 Qu       1784 E=    -845.537931869829     steps=  358 RMS= 0.58428E-02 Markov E=    -877.299560639123     t=       53.4
 Qu       1785 E=    -876.297912120897     steps=  155 RMS= 0.52351E-02 Markov E=    -877.299560639123     t=       53.5
 Qu       1786 E=    -868.937504018448     steps=  134 RMS= 0.47840E-02 Markov E=    -876.297912120897     t=       53.5
 Qu       1787 E=    -869.631877999083     steps=  184 RMS= 0.58397E-02 Markov E=    -876.297912120897     t=       53.5
 Qu       1788 E=    -869.498150969420     steps=  146 RMS= 0.65385E-02 Markov E=    -876.297912120897     t=       53.5
 Qu       1789 E=    -872.533786309309     steps=  133 RMS= 0.56309E-02 Markov E=    -876.297912120897     t=       53.5
 Qu       1790 E=    -869.699171971241     steps=  142 RMS= 0.48197E-02 Markov E=    -876.297912120897     t=       53.6
 Qu       1791 E=    -879.740462125575     steps=   89 RMS= 0.44440E-02 Markov E=    -876.297912120897     t=       53.6
 Qu       1792 E=    -850.316541822307     steps=  297 RMS= 0.69999E-02 Markov E=    -879.740462125575     t=       53.6
 Qu       1793 E=    -877.305383577185     steps=  114 RMS= 0.67271E-02 Markov E=    -879.740462125575     t=       53.6
 Qu       1794 E=    -842.625639937721     steps=  282 RMS= 0.65224E-02 Markov E=    -879.740462125575     t=       53.7
 Qu       1795 E=    -877.781847040352     steps=  113 RMS= 0.69607E-02 Markov E=    -879.740462125575     t=       53.7
 Qu       1796 E=    -874.824887762592     steps=  174 RMS= 0.64308E-02 Markov E=    -877.781847040352     t=       53.7
 Qu       1797 E=    -873.913826249602     steps=  128 RMS= 0.43507E-02 Markov E=    -877.781847040352     t=       53.7
 Qu       1798 E=    -854.232625036831     steps=  718 RMS= 0.63092E-02 Markov E=    -877.781847040352     t=       53.8
 Qu       1799 E=    -844.846805681851     steps=  279 RMS= 0.66071E-02 Markov E=    -877.781847040352     t=       53.9
 Qu       1800 E=    -878.673571186314     steps=   76 RMS= 0.65502E-02 Markov E=    -877.781847040352     t=       53.9
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       1801 E=    -854.610720505039     steps=  525 RMS= 0.63273E-02 Markov E=    -878.673571186314     t=       53.9
 Qu       1802 E=    -847.547431993352     steps=  330 RMS= 0.55632E-02 Markov E=    -878.673571186314     t=       54.0
 Qu       1803 E=    -877.522517973904     steps=  118 RMS= 0.64985E-02 Markov E=    -878.673571186314     t=       54.0
 Qu       1804 E=    -874.757855775346     steps=  169 RMS= 0.67456E-02 Markov E=    -878.673571186314     t=       54.0
 Qu       1805 E=    -847.160508688466     steps=  430 RMS= 0.61579E-02 Markov E=    -878.673571186314     t=       54.1
 Qu       1806 E=    -875.516466089406     steps=  182 RMS= 0.67058E-02 Markov E=    -878.673571186314     t=       54.1
 Qu       1807 E=    -864.383311495846     steps=  184 RMS= 0.55018E-02 Markov E=    -878.673571186314     t=       54.1
 Qu       1808 E=    -876.882724444778     steps=  125 RMS= 0.60880E-02 Markov E=    -878.673571186314     t=       54.2
 Qu       1809 E=    -843.811205595364     steps=  350 RMS= 0.59582E-02 Markov E=    -878.673571186314     t=       54.2
 Qu       1810 E=    -872.702102585247     steps=  143 RMS= 0.68703E-02 Markov E=    -878.673571186314     t=       54.2
 Qu       1811 E=    -864.967464188792     steps=  380 RMS= 0.62473E-02 Markov E=    -878.673571186314     t=       54.3
 Qu       1812 E=    -873.974549599236     steps=  129 RMS= 0.62210E-02 Markov E=    -878.673571186314     t=       54.3
 Qu       1813 E=    -872.344506754697     steps=  215 RMS= 0.52430E-02 Markov E=    -878.673571186314     t=       54.3
 Qu       1814 E=    -848.142875121153     steps=  200 RMS= 0.64133E-02 Markov E=    -878.673571186314     t=       54.4
 Qu       1815 E=    -874.115500795334     steps=  168 RMS= 0.50366E-02 Markov E=    -878.673571186314     t=       54.4
 Qu       1816 E=    -845.742959991908     steps=  386 RMS= 0.56562E-02 Markov E=    -878.673571186314     t=       54.4
 Qu       1817 E=    -877.342825097136     steps=  134 RMS= 0.59633E-02 Markov E=    -878.673571186314     t=       54.5
 Qu       1818 E=    -871.754203608983     steps=  166 RMS= 0.49009E-02 Markov E=    -877.342825097136     t=       54.5
 Qu       1819 E=    -875.387747509258     steps=  128 RMS= 0.62260E-02 Markov E=    -877.342825097136     t=       54.5
 Qu       1820 E=    -850.945085758482     steps=  232 RMS= 0.61757E-02 Markov E=    -875.387747509258     t=       54.5
 Qu       1821 E=    -877.211487558713     steps=  127 RMS= 0.62413E-02 Markov E=    -875.387747509258     t=       54.5
 Qu       1822 E=    -843.746913375089     steps=  289 RMS= 0.64023E-02 Markov E=    -877.211487558713     t=       54.6
 Qu       1823 E=    -876.011232207885     steps=   84 RMS= 0.59336E-02 Markov E=    -877.211487558713     t=       54.6
 Qu       1824 E=    -843.294700370385     steps=  234 RMS= 0.66168E-02 Markov E=    -877.211487558713     t=       54.6
 Qu       1825 E=    -874.543849289191     steps=   95 RMS= 0.68967E-02 Markov E=    -877.211487558713     t=       54.6
 Qu       1826 E=    -876.957074507964     steps=   79 RMS= 0.69736E-02 Markov E=    -877.211487558713     t=       54.7
 Qu       1827 E=    -873.298807321906     steps=   98 RMS= 0.64809E-02 Markov E=    -876.957074507964     t=       54.7
 Qu       1828 E=    -872.520488967778     steps=  132 RMS= 0.63874E-02 Markov E=    -876.957074507964     t=       54.7
 Qu       1829 E=    -857.507862142431     steps=  227 RMS= 0.65848E-02 Markov E=    -876.957074507964     t=       54.7
 Qu       1830 E=    -873.784278018825     steps=  108 RMS= 0.58459E-02 Markov E=    -876.957074507964     t=       54.7
 Qu       1831 E=    -858.867023194620     steps=  413 RMS= 0.65503E-02 Markov E=    -873.784278018825     t=       54.8
 Qu       1832 E=    -848.959549287860     steps=  259 RMS= 0.66757E-02 Markov E=    -873.784278018825     t=       54.8
 Qu       1833 E=    -867.029217530441     steps=  309 RMS= 0.63968E-02 Markov E=    -873.784278018825     t=       54.9
 Qu       1834 E=    -855.790155091835     steps=  352 RMS= 0.60107E-02 Markov E=    -873.784278018825     t=       54.9
 Qu       1835 E=    -843.101302597864     steps=  304 RMS= 0.69898E-02 Markov E=    -873.784278018825     t=       55.0
 Qu       1836 E=    -869.961057065383     steps=  122 RMS= 0.46592E-02 Markov E=    -873.784278018825     t=       55.0
 Qu       1837 E=    -874.973645024637     steps=  101 RMS= 0.67000E-02 Markov E=    -873.784278018825     t=       55.0
 Qu       1838 E=    -875.303753885381     steps=  106 RMS= 0.62176E-02 Markov E=    -874.973645024637     t=       55.0
 Qu       1839 E=    -870.670318984965     steps=  117 RMS= 0.55783E-02 Markov E=    -875.303753885381     t=       55.0
 Qu       1840 E=    -875.266905943717     steps=  119 RMS= 0.59266E-02 Markov E=    -875.303753885381     t=       55.0
 Qu       1841 E=    -874.537606141878     steps=  107 RMS= 0.69398E-02 Markov E=    -875.266905943717     t=       55.0
 Qu       1842 E=    -874.907396743982     steps=  106 RMS= 0.44231E-02 Markov E=    -875.266905943717     t=       55.1
 Qu       1843 E=    -870.083185271171     steps=  152 RMS= 0.68703E-02 Markov E=    -874.907396743982     t=       55.1
 Qu       1844 E=    -866.586668507521     steps=  138 RMS= 0.58943E-02 Markov E=    -874.907396743982     t=       55.1
 Qu       1845 E=    -863.677732167491     steps=  514 RMS= 0.63809E-02 Markov E=    -874.907396743982     t=       55.2
 Qu       1846 E=    -866.547633579669     steps=  209 RMS= 0.63256E-02 Markov E=    -874.907396743982     t=       55.2
 Qu       1847 E=    -868.519170479151     steps=  180 RMS= 0.53192E-02 Markov E=    -874.907396743982     t=       55.2
 Qu       1848 E=    -866.456103319336     steps=  144 RMS= 0.57569E-02 Markov E=    -874.907396743982     t=       55.2
 Qu       1849 E=    -875.229864306301     steps=  126 RMS= 0.52328E-02 Markov E=    -874.907396743982     t=       55.3
 Qu       1850 E=    -846.040514773198     steps=  315 RMS= 0.61911E-02 Markov E=    -875.229864306301     t=       55.3
Acceptance ratio for previous     50 steps=  0.2000  FAC=  1.0500
 Qu       1851 E=    -869.721072735796     steps=  148 RMS= 0.60120E-02 Markov E=    -875.229864306301     t=       55.3
 Qu       1852 E=    -875.979818928639     steps=  157 RMS= 0.51114E-02 Markov E=    -875.229864306301     t=       55.4
 Qu       1853 E=    -873.218982312239     steps=  207 RMS= 0.54937E-02 Markov E=    -875.979818928639     t=       55.4
 Qu       1854 E=    -842.286515578387     steps=  314 RMS= 0.62074E-02 Markov E=    -875.979818928639     t=       55.4
 Qu       1855 E=    -870.215232186045     steps=  142 RMS= 0.54642E-02 Markov E=    -875.979818928639     t=       55.4
 Qu       1856 E=    -848.123901095102     steps=  207 RMS= 0.65802E-02 Markov E=    -875.979818928639     t=       55.5
 Qu       1857 E=    -876.749957720795     steps=  138 RMS= 0.60089E-02 Markov E=    -875.979818928639     t=       55.5
 Qu       1858 E=    -853.933670255409     steps=  187 RMS= 0.69654E-02 Markov E=    -876.749957720795     t=       55.5
 Qu       1859 E=    -873.236324430647     steps=  149 RMS= 0.65579E-02 Markov E=    -876.749957720795     t=       55.5
 Qu       1860 E=    -874.859944244138     steps=  103 RMS= 0.41250E-02 Markov E=    -876.749957720795     t=       55.6
 Qu       1861 E=    -874.169819284061     steps=  253 RMS= 0.66185E-02 Markov E=    -874.859944244138     t=       55.6
 Qu       1862 E=    -872.967742841856     steps=  160 RMS= 0.57195E-02 Markov E=    -874.859944244138     t=       55.6
 Qu       1863 E=    -876.842849543794     steps=  130 RMS= 0.57706E-02 Markov E=    -874.859944244138     t=       55.6
 Qu       1864 E=    -865.504363055166     steps=  140 RMS= 0.64356E-02 Markov E=    -876.842849543794     t=       55.7
 Qu       1865 E=    -872.777388024878     steps=  115 RMS= 0.49808E-02 Markov E=    -876.842849543794     t=       55.7
 Qu       1866 E=    -875.770285945367     steps=  221 RMS= 0.51981E-02 Markov E=    -876.842849543794     t=       55.7
 Qu       1867 E=    -870.663446234268     steps=  126 RMS= 0.54366E-02 Markov E=    -876.842849543794     t=       55.7
 Qu       1868 E=    -875.557331157233     steps=  136 RMS= 0.67358E-02 Markov E=    -876.842849543794     t=       55.7
 Qu       1869 E=    -876.909607679549     steps=  126 RMS= 0.62364E-02 Markov E=    -876.842849543794     t=       55.8
 Qu       1870 E=    -869.530860687047     steps=  264 RMS= 0.58925E-02 Markov E=    -876.909607679549     t=       55.8
 Qu       1871 E=    -868.264100187736     steps=  312 RMS= 0.64195E-02 Markov E=    -876.909607679549     t=       55.8
 Qu       1872 E=    -866.915554614509     steps=  199 RMS= 0.67519E-02 Markov E=    -876.909607679549     t=       55.9
 Qu       1873 E=    -876.946631025218     steps=  113 RMS= 0.46802E-02 Markov E=    -876.909607679549     t=       55.9
 Qu       1874 E=    -843.431191257200     steps=  439 RMS= 0.69076E-02 Markov E=    -876.946631025218     t=       55.9
 Qu       1875 E=    -868.890450405752     steps=  190 RMS= 0.69474E-02 Markov E=    -876.946631025218     t=       56.0
 Qu       1876 E=    -873.631768209313     steps=  108 RMS= 0.47669E-02 Markov E=    -876.946631025218     t=       56.0
 Qu       1877 E=    -876.805727145137     steps=  106 RMS= 0.61282E-02 Markov E=    -876.946631025218     t=       56.0
 Qu       1878 E=    -876.523410678272     steps=  154 RMS= 0.56307E-02 Markov E=    -876.805727145137     t=       56.0
 Qu       1879 E=    -873.272138210739     steps=  207 RMS= 0.38784E-02 Markov E=    -876.523410678272     t=       56.0
 Qu       1880 E=    -876.660084468774     steps=  107 RMS= 0.64705E-02 Markov E=    -876.523410678272     t=       56.1
 Qu       1881 E=    -849.641685149171     steps=  370 RMS= 0.60173E-02 Markov E=    -876.660084468774     t=       56.1
 Qu       1882 E=    -875.128852671313     steps=  155 RMS= 0.61205E-02 Markov E=    -876.660084468774     t=       56.1
 Qu       1883 E=    -873.390329647951     steps=  120 RMS= 0.53970E-02 Markov E=    -876.660084468774     t=       56.2
 Qu       1884 E=    -870.953411684760     steps=  365 RMS= 0.48577E-02 Markov E=    -876.660084468774     t=       56.2
 Qu       1885 E=    -846.191067226235     steps=  341 RMS= 0.69986E-02 Markov E=    -876.660084468774     t=       56.3
 Qu       1886 E=    -865.364455774751     steps=  531 RMS= 0.56275E-02 Markov E=    -876.660084468774     t=       56.3
 Qu       1887 E=    -875.819390487465     steps=  180 RMS= 0.48591E-02 Markov E=    -876.660084468774     t=       56.4
 Qu       1888 E=    -873.093501492604     steps=  223 RMS= 0.58223E-02 Markov E=    -876.660084468774     t=       56.4
 Qu       1889 E=    -872.247891884706     steps=  162 RMS= 0.68756E-02 Markov E=    -876.660084468774     t=       56.4
 Qu       1890 E=    -877.251246261421     steps=  171 RMS= 0.61315E-02 Markov E=    -876.660084468774     t=       56.4
 Qu       1891 E=    -876.248694627052     steps=  116 RMS= 0.51096E-02 Markov E=    -877.251246261421     t=       56.4
 Qu       1892 E=    -875.851858524244     steps=  165 RMS= 0.60985E-02 Markov E=    -876.248694627052     t=       56.5
 Qu       1893 E=    -871.805234262468     steps=  162 RMS= 0.69828E-02 Markov E=    -875.851858524244     t=       56.5
 Qu       1894 E=    -858.819556925973     steps=  268 RMS= 0.55800E-02 Markov E=    -875.851858524244     t=       56.5
 Qu       1895 E=    -838.685275115737     steps=  237 RMS= 0.49846E-02 Markov E=    -875.851858524244     t=       56.6
 Qu       1896 E=    -869.605985081308     steps=  235 RMS= 0.43452E-02 Markov E=    -875.851858524244     t=       56.6
 Qu       1897 E=    -864.887958302087     steps=  210 RMS= 0.52497E-02 Markov E=    -875.851858524244     t=       56.6
 Qu       1898 E=    -874.254754361189     steps=  221 RMS= 0.56425E-02 Markov E=    -875.851858524244     t=       56.7
 Qu       1899 E=    -875.872388574761     steps=  135 RMS= 0.51799E-02 Markov E=    -874.254754361189     t=       56.7
 Qu       1900 E=    -851.965500897492     steps=  381 RMS= 0.65758E-02 Markov E=    -875.872388574761     t=       56.7
Acceptance ratio for previous     50 steps=  0.2800  FAC=  1.0500
 Qu       1901 E=    -876.908893733472     steps=  148 RMS= 0.40250E-02 Markov E=    -875.872388574761     t=       56.7
 Qu       1902 E=    -877.420478925145     steps=  110 RMS= 0.68127E-02 Markov E=    -876.908893733472     t=       56.8
 Qu       1903 E=    -864.842484964438     steps=  279 RMS= 0.62744E-02 Markov E=    -877.420478925145     t=       56.8
 Qu       1904 E=    -875.008406976937     steps=  150 RMS= 0.59256E-02 Markov E=    -877.420478925145     t=       56.8
 Qu       1905 E=    -864.736128599085     steps=  206 RMS= 0.63521E-02 Markov E=    -877.420478925145     t=       56.8
 Qu       1906 E=    -858.632577731932     steps=  304 RMS= 0.52182E-02 Markov E=    -877.420478925145     t=       56.9
 Qu       1907 E=    -876.174919934667     steps=  155 RMS= 0.38249E-02 Markov E=    -877.420478925145     t=       56.9
 Qu       1908 E=    -877.424417267279     steps=  124 RMS= 0.65501E-02 Markov E=    -877.420478925145     t=       56.9
 Qu       1909 E=    -860.301683175693     steps=  144 RMS= 0.63906E-02 Markov E=    -877.424417267279     t=       57.0
 Qu       1910 E=    -878.022792810538     steps=  230 RMS= 0.37803E-02 Markov E=    -877.424417267279     t=       57.0
 Qu       1911 E=    -858.656403974591     steps=  168 RMS= 0.58161E-02 Markov E=    -878.022792810538     t=       57.0
 Qu       1912 E=    -861.802510044096     steps=  121 RMS= 0.62311E-02 Markov E=    -878.022792810538     t=       57.0
 Qu       1913 E=    -874.762862293942     steps=  116 RMS= 0.59875E-02 Markov E=    -878.022792810538     t=       57.0
 Qu       1914 E=    -874.288170281809     steps=  326 RMS= 0.64975E-02 Markov E=    -878.022792810538     t=       57.1
 Qu       1915 E=    -867.511104136013     steps=  127 RMS= 0.62955E-02 Markov E=    -878.022792810538     t=       57.1
 Qu       1916 E=    -876.707016752372     steps=  101 RMS= 0.62062E-02 Markov E=    -878.022792810538     t=       57.1
 Qu       1917 E=    -877.037590142090     steps=  106 RMS= 0.40145E-02 Markov E=    -876.707016752372     t=       57.1
 Qu       1918 E=    -873.206741796164     steps=  123 RMS= 0.64328E-02 Markov E=    -877.037590142090     t=       57.2
 Qu       1919 E=    -867.953383774854     steps=  158 RMS= 0.68248E-02 Markov E=    -877.037590142090     t=       57.2
 Qu       1920 E=    -857.586395465583     steps=  172 RMS= 0.60742E-02 Markov E=    -877.037590142090     t=       57.2
 Qu       1921 E=    -880.127550251916     steps=  112 RMS= 0.61579E-02 Markov E=    -877.037590142090     t=       57.2
 Qu       1922 E=    -863.181575099097     steps=  268 RMS= 0.69735E-02 Markov E=    -880.127550251916     t=       57.2
 Qu       1923 E=    -874.544189533761     steps=  146 RMS= 0.57792E-02 Markov E=    -880.127550251916     t=       57.3
 Qu       1924 E=    -878.843856950560     steps=   90 RMS= 0.50762E-02 Markov E=    -880.127550251916     t=       57.3
 Qu       1925 E=    -874.656512107419     steps=  134 RMS= 0.65203E-02 Markov E=    -880.127550251916     t=       57.3
 Qu       1926 E=    -870.287334978469     steps=  117 RMS= 0.65789E-02 Markov E=    -880.127550251916     t=       57.3
 Qu       1927 E=    -879.895551825276     steps=   90 RMS= 0.48785E-02 Markov E=    -880.127550251916     t=       57.3
 Qu       1928 E=    -873.680427509133     steps=  115 RMS= 0.50284E-02 Markov E=    -879.895551825276     t=       57.3
 Qu       1929 E=    -874.729224553822     steps=  151 RMS= 0.64303E-02 Markov E=    -879.895551825276     t=       57.4
 Qu       1930 E=    -878.150128458484     steps=  270 RMS= 0.57385E-02 Markov E=    -879.895551825276     t=       57.4
 Qu       1931 E=    -875.261440133092     steps=  128 RMS= 0.52997E-02 Markov E=    -879.895551825276     t=       57.4
 Qu       1932 E=    -873.598934393502     steps=  178 RMS= 0.51155E-02 Markov E=    -879.895551825276     t=       57.5
 Qu       1933 E=    -875.392798689555     steps=  335 RMS= 0.53312E-02 Markov E=    -879.895551825276     t=       57.5
 Qu       1934 E=    -864.987466326635     steps=  201 RMS= 0.67236E-02 Markov E=    -879.895551825276     t=       57.5
 Qu       1935 E=    -852.050786818430     steps=  489 RMS= 0.65607E-02 Markov E=    -879.895551825276     t=       57.6
 Qu       1936 E=    -847.129963666472     steps=  372 RMS= 0.69517E-02 Markov E=    -879.895551825276     t=       57.6
 Qu       1937 E=    -871.577012829822     steps=  553 RMS= 0.69629E-02 Markov E=    -879.895551825276     t=       57.7
 Qu       1938 E=    -871.834126611352     steps=  378 RMS= 0.58998E-02 Markov E=    -879.895551825276     t=       57.8
 Qu       1939 E=    -874.900888120184     steps=  158 RMS= 0.62700E-02 Markov E=    -879.895551825276     t=       57.8
 Qu       1940 E=    -877.923107601396     steps=  139 RMS= 0.68177E-02 Markov E=    -879.895551825276     t=       57.8
 Qu       1941 E=    -870.619232971450     steps=  120 RMS= 0.58498E-02 Markov E=    -879.895551825276     t=       57.8
 Qu       1942 E=    -860.035560652376     steps=  189 RMS= 0.60167E-02 Markov E=    -879.895551825276     t=       57.9
 Qu       1943 E=    -852.510483731181     steps=  479 RMS= 0.65257E-02 Markov E=    -879.895551825276     t=       57.9
 Qu       1944 E=    -875.726980912962     steps=  160 RMS= 0.68933E-02 Markov E=    -879.895551825276     t=       58.0
 Qu       1945 E=    -880.020192098393     steps=  110 RMS= 0.64458E-02 Markov E=    -879.895551825276     t=       58.0
 Qu       1946 E=    -852.193320540285     steps=  296 RMS= 0.67888E-02 Markov E=    -880.020192098393     t=       58.0
 Qu       1947 E=    -877.359452789331     steps=  133 RMS= 0.62973E-02 Markov E=    -880.020192098393     t=       58.0
 Qu       1948 E=    -842.316742684010     steps=  211 RMS= 0.67331E-02 Markov E=    -880.020192098393     t=       58.1
 Qu       1949 E=    -875.718826976944     steps=  177 RMS= 0.56776E-02 Markov E=    -880.020192098393     t=       58.1
 Qu       1950 E=    -873.303191357355     steps=  164 RMS= 0.44810E-02 Markov E=    -880.020192098393     t=       58.1
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu       1951 E=    -880.199544275238     steps=  121 RMS= 0.53501E-02 Markov E=    -880.020192098393     t=       58.1
 Qu       1952 E=    -879.014190781708     steps=   97 RMS= 0.63465E-02 Markov E=    -880.199544275238     t=       58.1
 Qu       1953 E=    -873.107356678547     steps=  331 RMS= 0.49641E-02 Markov E=    -880.199544275238     t=       58.2
 Qu       1954 E=    -878.672316769183     steps=  101 RMS= 0.58646E-02 Markov E=    -880.199544275238     t=       58.2
 Qu       1955 E=    -872.279567007881     steps=  112 RMS= 0.56714E-02 Markov E=    -880.199544275238     t=       58.2
 Qu       1956 E=    -881.025795304365     steps=  145 RMS= 0.47888E-02 Markov E=    -880.199544275238     t=       58.2
 Qu       1957 E=    -882.277666620680     steps=  104 RMS= 0.67183E-02 Markov E=    -881.025795304365     t=       58.2
 Qu       1958 E=    -852.273931337436     steps=  276 RMS= 0.61597E-02 Markov E=    -882.277666620680     t=       58.3
 Qu       1959 E=    -871.366461542587     steps=  116 RMS= 0.66550E-02 Markov E=    -882.277666620680     t=       58.3
 Qu       1960 E=    -880.747325651961     steps=  113 RMS= 0.64127E-02 Markov E=    -882.277666620680     t=       58.3
 Qu       1961 E=    -872.984685009268     steps=  130 RMS= 0.39547E-02 Markov E=    -882.277666620680     t=       58.3
 Qu       1962 E=    -877.544461309325     steps=  118 RMS= 0.64052E-02 Markov E=    -882.277666620680     t=       58.4
 Qu       1963 E=    -849.539644991517     steps=  554 RMS= 0.69621E-02 Markov E=    -882.277666620680     t=       58.4
 Qu       1964 E=    -876.852347644393     steps=  202 RMS= 0.49257E-02 Markov E=    -882.277666620680     t=       58.5
 Qu       1965 E=    -879.735015880912     steps=  144 RMS= 0.59022E-02 Markov E=    -882.277666620680     t=       58.5
 Qu       1966 E=    -854.297589716852     steps=  383 RMS= 0.60360E-02 Markov E=    -879.735015880912     t=       58.5
 Qu       1967 E=    -869.789172953558     steps=  122 RMS= 0.48699E-02 Markov E=    -879.735015880912     t=       58.6
 Qu       1968 E=    -874.851598165320     steps=  125 RMS= 0.56148E-02 Markov E=    -879.735015880912     t=       58.6
 Qu       1969 E=    -869.737170889116     steps=  302 RMS= 0.65751E-02 Markov E=    -879.735015880912     t=       58.6
 Qu       1970 E=    -875.904588278676     steps=  118 RMS= 0.53355E-02 Markov E=    -879.735015880912     t=       58.6
 Qu       1971 E=    -879.725287523241     steps=  102 RMS= 0.44242E-02 Markov E=    -879.735015880912     t=       58.6
 Qu       1972 E=    -874.113670575944     steps=  160 RMS= 0.50390E-02 Markov E=    -879.725287523241     t=       58.7
 Qu       1973 E=    -866.373015983731     steps=  195 RMS= 0.69690E-02 Markov E=    -879.725287523241     t=       58.7
 Qu       1974 E=    -870.582500469757     steps=  229 RMS= 0.67279E-02 Markov E=    -879.725287523241     t=       58.7
 Qu       1975 E=    -878.588108228715     steps=  140 RMS= 0.68958E-02 Markov E=    -879.725287523241     t=       58.7
 Qu       1976 E=    -878.033598772667     steps=  130 RMS= 0.54912E-02 Markov E=    -879.725287523241     t=       58.8
 Qu       1977 E=    -878.495811120319     steps=  145 RMS= 0.56469E-02 Markov E=    -879.725287523241     t=       58.8
 Qu       1978 E=    -864.636337333186     steps=  155 RMS= 0.62762E-02 Markov E=    -879.725287523241     t=       58.8
 Qu       1979 E=    -839.730333976812     steps=  335 RMS= 0.50559E-02 Markov E=    -879.725287523241     t=       58.8
 Qu       1980 E=    -875.912138761486     steps=   99 RMS= 0.52888E-02 Markov E=    -879.725287523241     t=       58.9
 Qu       1981 E=    -879.809817721141     steps=  106 RMS= 0.50744E-02 Markov E=    -879.725287523241     t=       58.9
 Qu       1982 E=    -850.121821437081     steps=  446 RMS= 0.68254E-02 Markov E=    -879.809817721141     t=       58.9
 Qu       1983 E=    -867.002822697044     steps=  143 RMS= 0.62567E-02 Markov E=    -879.809817721141     t=       59.0
 Qu       1984 E=    -877.448291272347     steps=  107 RMS= 0.47406E-02 Markov E=    -879.809817721141     t=       59.0
 Qu       1985 E=    -875.715569475664     steps=  185 RMS= 0.58741E-02 Markov E=    -879.809817721141     t=       59.0
 Qu       1986 E=    -878.576374866317     steps=  113 RMS= 0.54610E-02 Markov E=    -879.809817721141     t=       59.0
 Qu       1987 E=    -864.326677018175     steps=  159 RMS= 0.69077E-02 Markov E=    -878.576374866317     t=       59.0
 Qu       1988 E=    -871.676206895679     steps=  137 RMS= 0.66023E-02 Markov E=    -878.576374866317     t=       59.1
 Qu       1989 E=    -879.022454293147     steps=  120 RMS= 0.65417E-02 Markov E=    -878.576374866317     t=       59.1
 Qu       1990 E=    -873.299457223997     steps=  284 RMS= 0.55380E-02 Markov E=    -879.022454293147     t=       59.1
 Qu       1991 E=    -873.764513929323     steps=  170 RMS= 0.46639E-02 Markov E=    -879.022454293147     t=       59.1
 Qu       1992 E=    -872.740467802317     steps=  117 RMS= 0.69647E-02 Markov E=    -879.022454293147     t=       59.2
 Qu       1993 E=    -871.895973907357     steps=  138 RMS= 0.56572E-02 Markov E=    -879.022454293147     t=       59.2
 Qu       1994 E=    -881.002690373827     steps=  152 RMS= 0.69557E-02 Markov E=    -879.022454293147     t=       59.2
 Qu       1995 E=    -875.127581068036     steps=  249 RMS= 0.63954E-02 Markov E=    -881.002690373827     t=       59.2
 Qu       1996 E=    -878.864349394531     steps=  133 RMS= 0.69798E-02 Markov E=    -881.002690373827     t=       59.3
 Qu       1997 E=    -840.555424457005     steps=  221 RMS= 0.50446E-02 Markov E=    -881.002690373827     t=       59.3
 Qu       1998 E=    -852.135599364943     steps=  348 RMS= 0.65389E-02 Markov E=    -881.002690373827     t=       59.3
 Qu       1999 E=    -874.752367526288     steps=  149 RMS= 0.64907E-02 Markov E=    -881.002690373827     t=       59.4
 Qu       2000 E=    -872.260789510251     steps=  237 RMS= 0.63373E-02 Markov E=    -881.002690373827     t=       59.4
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu       2001 E=    -871.028063304799     steps=  112 RMS= 0.66132E-02 Markov E=    -881.002690373827     t=       59.4
 Qu       2002 E=    -866.921228538074     steps=  141 RMS= 0.51689E-02 Markov E=    -881.002690373827     t=       59.4
 Qu       2003 E=    -848.608775559608     steps=  368 RMS= 0.63723E-02 Markov E=    -881.002690373827     t=       59.5
 Qu       2004 E=    -874.252173209504     steps=   92 RMS= 0.46379E-02 Markov E=    -881.002690373827     t=       59.5
 Qu       2005 E=    -855.107223186485     steps=  549 RMS= 0.62807E-02 Markov E=    -881.002690373827     t=       59.6
 Qu       2006 E=    -853.762286253402     steps=  280 RMS= 0.67103E-02 Markov E=    -881.002690373827     t=       59.6
 Qu       2007 E=    -874.415987398080     steps=  176 RMS= 0.69457E-02 Markov E=    -881.002690373827     t=       59.6
 Qu       2008 E=    -879.131311261660     steps=  118 RMS= 0.64831E-02 Markov E=    -881.002690373827     t=       59.7
 Qu       2009 E=    -855.070487242229     steps=  381 RMS= 0.63958E-02 Markov E=    -881.002690373827     t=       59.7
 Qu       2010 E=    -876.546599344038     steps=  134 RMS= 0.43870E-02 Markov E=    -881.002690373827     t=       59.7
 Qu       2011 E=    -881.453106356263     steps=  107 RMS= 0.53465E-02 Markov E=    -881.002690373827     t=       59.7
 Qu       2012 E=    -844.925204986296     steps=  251 RMS= 0.69072E-02 Markov E=    -881.453106356263     t=       59.8
 Qu       2013 E=    -879.282133889432     steps=  106 RMS= 0.61299E-02 Markov E=    -881.453106356263     t=       59.8
 Qu       2014 E=    -880.471546412809     steps=  137 RMS= 0.43421E-02 Markov E=    -881.453106356263     t=       59.8
 Qu       2015 E=    -877.133103504900     steps=  132 RMS= 0.54866E-02 Markov E=    -881.453106356263     t=       59.8
 Qu       2016 E=    -873.643075546854     steps=  137 RMS= 0.67454E-02 Markov E=    -881.453106356263     t=       59.9
 Qu       2017 E=    -880.106433647415     steps=   95 RMS= 0.54387E-02 Markov E=    -881.453106356263     t=       59.9
 Qu       2018 E=    -880.105079997480     steps=  124 RMS= 0.56093E-02 Markov E=    -881.453106356263     t=       59.9
 Qu       2019 E=    -881.461287988247     steps=   82 RMS= 0.47582E-02 Markov E=    -881.453106356263     t=       59.9
 Qu       2020 E=    -881.372642262155     steps=  129 RMS= 0.48465E-02 Markov E=    -881.461287988247     t=       59.9
 Qu       2021 E=    -876.385275678955     steps=  125 RMS= 0.50986E-02 Markov E=    -881.372642262155     t=       59.9
 Qu       2022 E=    -875.969578656317     steps=   99 RMS= 0.68791E-02 Markov E=    -881.372642262155     t=       59.9
 Qu       2023 E=    -858.116327905167     steps=  324 RMS= 0.69130E-02 Markov E=    -881.372642262155     t=       60.0
 Qu       2024 E=    -873.510503185496     steps=  161 RMS= 0.61768E-02 Markov E=    -881.372642262155     t=       60.0
 Qu       2025 E=    -863.843988698382     steps=  166 RMS= 0.64564E-02 Markov E=    -881.372642262155     t=       60.0
 Qu       2026 E=    -875.001479303928     steps=  129 RMS= 0.62398E-02 Markov E=    -881.372642262155     t=       60.1
 Qu       2027 E=    -846.241304760465     steps=  393 RMS= 0.53479E-02 Markov E=    -881.372642262155     t=       60.1
 Qu       2028 E=    -879.753621748942     steps=  179 RMS= 0.47337E-02 Markov E=    -881.372642262155     t=       60.1
 Qu       2029 E=    -880.166090651983     steps=  134 RMS= 0.65928E-02 Markov E=    -881.372642262155     t=       60.2
 Qu       2030 E=    -878.141686193687     steps=  130 RMS= 0.65110E-02 Markov E=    -881.372642262155     t=       60.2
 Qu       2031 E=    -842.198085217912     steps=  228 RMS= 0.58800E-02 Markov E=    -881.372642262155     t=       60.2
 Qu       2032 E=    -875.312118364856     steps=  125 RMS= 0.60401E-02 Markov E=    -881.372642262155     t=       60.2
 Qu       2033 E=    -880.069017934066     steps=  135 RMS= 0.52680E-02 Markov E=    -881.372642262155     t=       60.3
 Qu       2034 E=    -851.055344076269     steps=  329 RMS= 0.57417E-02 Markov E=    -881.372642262155     t=       60.3
 Qu       2035 E=    -873.911041146715     steps=  298 RMS= 0.61336E-02 Markov E=    -881.372642262155     t=       60.4
 Qu       2036 E=    -876.296884007619     steps=   94 RMS= 0.41438E-02 Markov E=    -881.372642262155     t=       60.4
 Qu       2037 E=    -879.070010797778     steps=  155 RMS= 0.64694E-02 Markov E=    -881.372642262155     t=       60.4
 Qu       2038 E=    -855.167317838009     steps=  333 RMS= 0.63277E-02 Markov E=    -881.372642262155     t=       60.4
 Qu       2039 E=    -877.587424303725     steps=  125 RMS= 0.44045E-02 Markov E=    -881.372642262155     t=       60.5
 Qu       2040 E=    -881.372469180676     steps=   93 RMS= 0.67448E-02 Markov E=    -881.372642262155     t=       60.5
 Qu       2041 E=    -876.896128397338     steps=  233 RMS= 0.59430E-02 Markov E=    -881.372469180676     t=       60.5
 Qu       2042 E=    -881.778371573657     steps=  127 RMS= 0.68608E-02 Markov E=    -881.372469180676     t=       60.5
 Qu       2043 E=    -872.761063966143     steps=  232 RMS= 0.61767E-02 Markov E=    -881.778371573657     t=       60.6
 Qu       2044 E=    -875.791506156003     steps=  151 RMS= 0.65385E-02 Markov E=    -881.778371573657     t=       60.6
 Qu       2045 E=    -875.125133019897     steps=  190 RMS= 0.53026E-02 Markov E=    -881.778371573657     t=       60.6
 Qu       2046 E=    -873.063285568835     steps=  160 RMS= 0.64176E-02 Markov E=    -881.778371573657     t=       60.6
 Qu       2047 E=    -881.459154116839     steps=  108 RMS= 0.55605E-02 Markov E=    -881.778371573657     t=       60.6
 Qu       2048 E=    -877.659354644729     steps=  130 RMS= 0.50507E-02 Markov E=    -881.459154116839     t=       60.7
 Qu       2049 E=    -848.068175444240     steps=  301 RMS= 0.62524E-02 Markov E=    -881.459154116839     t=       60.7
 Qu       2050 E=    -876.956988644955     steps=  176 RMS= 0.56424E-02 Markov E=    -881.459154116839     t=       60.7
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       2051 E=    -878.197397958392     steps=  105 RMS= 0.41467E-02 Markov E=    -881.459154116839     t=       60.7
 Qu       2052 E=    -846.460932250727     steps=  327 RMS= 0.55301E-02 Markov E=    -881.459154116839     t=       60.8
 Qu       2053 E=    -880.647106853604     steps=  262 RMS= 0.64033E-02 Markov E=    -881.459154116839     t=       60.8
 Qu       2054 E=    -876.980647083652     steps=  182 RMS= 0.58420E-02 Markov E=    -880.647106853604     t=       60.8
 Qu       2055 E=    -881.120842471980     steps=  118 RMS= 0.63981E-02 Markov E=    -880.647106853604     t=       60.9
 Qu       2056 E=    -868.301668290888     steps=  169 RMS= 0.65467E-02 Markov E=    -881.120842471980     t=       60.9
 Qu       2057 E=    -847.751090742005     steps=  292 RMS= 0.67829E-02 Markov E=    -881.120842471980     t=       60.9
 Qu       2058 E=    -859.137423481944     steps=  377 RMS= 0.60564E-02 Markov E=    -881.120842471980     t=       61.0
 Qu       2059 E=    -871.625075624148     steps=  166 RMS= 0.64483E-02 Markov E=    -881.120842471980     t=       61.0
 Qu       2060 E=    -879.831713048594     steps=   89 RMS= 0.69770E-02 Markov E=    -881.120842471980     t=       61.0
 Qu       2061 E=    -878.743020061643     steps=  150 RMS= 0.68336E-02 Markov E=    -881.120842471980     t=       61.0
 Qu       2062 E=    -876.070171285543     steps=  129 RMS= 0.66751E-02 Markov E=    -881.120842471980     t=       61.1
 Qu       2063 E=    -848.222990429057     steps=  352 RMS= 0.64500E-02 Markov E=    -881.120842471980     t=       61.1
 Qu       2064 E=    -879.089915379230     steps=  238 RMS= 0.51966E-02 Markov E=    -881.120842471980     t=       61.1
 Qu       2065 E=    -868.597412320757     steps=  171 RMS= 0.67062E-02 Markov E=    -879.089915379230     t=       61.2
 Qu       2066 E=    -869.060822852859     steps=  282 RMS= 0.63075E-02 Markov E=    -879.089915379230     t=       61.2
 Qu       2067 E=    -853.317865763508     steps=  190 RMS= 0.68698E-02 Markov E=    -879.089915379230     t=       61.2
 Qu       2068 E=    -873.876076772023     steps=  186 RMS= 0.54768E-02 Markov E=    -879.089915379230     t=       61.3
 Qu       2069 E=    -875.592000424874     steps=  218 RMS= 0.38949E-02 Markov E=    -879.089915379230     t=       61.3
 Qu       2070 E=    -877.682169646788     steps=  143 RMS= 0.69137E-02 Markov E=    -879.089915379230     t=       61.3
 Qu       2071 E=    -880.024365430935     steps=   85 RMS= 0.58216E-02 Markov E=    -879.089915379230     t=       61.3
 Qu       2072 E=    -877.480555805788     steps=  141 RMS= 0.44164E-02 Markov E=    -880.024365430935     t=       61.3
 Qu       2073 E=    -876.768251629587     steps=  162 RMS= 0.59392E-02 Markov E=    -880.024365430935     t=       61.4
 Qu       2074 E=    -844.746347871386     steps=  298 RMS= 0.62243E-02 Markov E=    -880.024365430935     t=       61.4
 Qu       2075 E=    -878.683477686064     steps=  317 RMS= 0.45886E-02 Markov E=    -880.024365430935     t=       61.5
 Qu       2076 E=    -877.464264214177     steps=  113 RMS= 0.69806E-02 Markov E=    -878.683477686064     t=       61.5
 Qu       2077 E=    -875.669438587278     steps=  189 RMS= 0.64232E-02 Markov E=    -877.464264214177     t=       61.5
 Qu       2078 E=    -875.946507508177     steps=  173 RMS= 0.59844E-02 Markov E=    -877.464264214177     t=       61.5
 Qu       2079 E=    -871.628525952098     steps=  137 RMS= 0.54804E-02 Markov E=    -877.464264214177     t=       61.5
 Qu       2080 E=    -868.622059603562     steps=  238 RMS= 0.66584E-02 Markov E=    -877.464264214177     t=       61.6
 Qu       2081 E=    -842.386302430892     steps=  275 RMS= 0.51410E-02 Markov E=    -877.464264214177     t=       61.6
 Qu       2082 E=    -870.998126029238     steps=  141 RMS= 0.61568E-02 Markov E=    -877.464264214177     t=       61.6
 Qu       2083 E=    -870.616537876512     steps=  179 RMS= 0.63019E-02 Markov E=    -877.464264214177     t=       61.7
 Qu       2084 E=    -866.919666180427     steps=  132 RMS= 0.58424E-02 Markov E=    -877.464264214177     t=       61.7
 Qu       2085 E=    -873.369146119886     steps=  145 RMS= 0.54268E-02 Markov E=    -877.464264214177     t=       61.7
 Qu       2086 E=    -879.036678147236     steps=  104 RMS= 0.67182E-02 Markov E=    -877.464264214177     t=       61.7
 Qu       2087 E=    -873.395376917383     steps=  275 RMS= 0.53962E-02 Markov E=    -879.036678147236     t=       61.8
 Qu       2088 E=    -872.031996907904     steps=  193 RMS= 0.58278E-02 Markov E=    -879.036678147236     t=       61.8
 Qu       2089 E=    -876.348048350426     steps=  170 RMS= 0.65152E-02 Markov E=    -879.036678147236     t=       61.8
 Qu       2090 E=    -863.934647380174     steps=  201 RMS= 0.68847E-02 Markov E=    -879.036678147236     t=       61.9
 Qu       2091 E=    -875.594582575043     steps=  117 RMS= 0.64738E-02 Markov E=    -879.036678147236     t=       61.9
 Qu       2092 E=    -881.214878729530     steps=  119 RMS= 0.46054E-02 Markov E=    -879.036678147236     t=       61.9
 Qu       2093 E=    -852.493497733444     steps=  167 RMS= 0.64123E-02 Markov E=    -881.214878729530     t=       61.9
 Qu       2094 E=    -872.645498548147     steps=  279 RMS= 0.60165E-02 Markov E=    -881.214878729530     t=       62.0
 Qu       2095 E=    -877.868266737294     steps=  218 RMS= 0.66018E-02 Markov E=    -881.214878729530     t=       62.0
 Qu       2096 E=    -863.396739452565     steps=  308 RMS= 0.62757E-02 Markov E=    -881.214878729530     t=       62.0
 Qu       2097 E=    -879.726216031542     steps=  126 RMS= 0.69020E-02 Markov E=    -881.214878729530     t=       62.1
 Qu       2098 E=    -844.991030795502     steps=  170 RMS= 0.63631E-02 Markov E=    -879.726216031542     t=       62.1
 Qu       2099 E=    -855.145141885928     steps=  261 RMS= 0.65480E-02 Markov E=    -879.726216031542     t=       62.1
 Qu       2100 E=    -877.702599563892     steps=  106 RMS= 0.55328E-02 Markov E=    -879.726216031542     t=       62.1
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu       2101 E=    -874.429223642519     steps=  137 RMS= 0.49481E-02 Markov E=    -879.726216031542     t=       62.2
 Qu       2102 E=    -846.122958410127     steps=  393 RMS= 0.58940E-02 Markov E=    -879.726216031542     t=       62.2
 Qu       2103 E=    -875.259036069122     steps=  148 RMS= 0.40089E-02 Markov E=    -879.726216031542     t=       62.2
 Qu       2104 E=    -879.824480596081     steps=   96 RMS= 0.57248E-02 Markov E=    -879.726216031542     t=       62.3
 Qu       2105 E=    -872.070160367008     steps=  227 RMS= 0.67488E-02 Markov E=    -879.824480596081     t=       62.3
 Qu       2106 E=    -846.178285457309     steps=  225 RMS= 0.60310E-02 Markov E=    -879.824480596081     t=       62.3
 Qu       2107 E=    -860.152196300663     steps=  228 RMS= 0.62181E-02 Markov E=    -879.824480596081     t=       62.4
 Qu       2108 E=    -875.567084213698     steps=  139 RMS= 0.68780E-02 Markov E=    -879.824480596081     t=       62.4
 Qu       2109 E=    -876.202250834262     steps=  155 RMS= 0.56803E-02 Markov E=    -879.824480596081     t=       62.4
 Qu       2110 E=    -878.951345996218     steps=  104 RMS= 0.60578E-02 Markov E=    -879.824480596081     t=       62.4
 Qu       2111 E=    -863.900120105444     steps=  471 RMS= 0.69665E-02 Markov E=    -879.824480596081     t=       62.5
 Qu       2112 E=    -880.101128361898     steps=  105 RMS= 0.48219E-02 Markov E=    -879.824480596081     t=       62.5
 Qu       2113 E=    -879.068076403384     steps=  110 RMS= 0.53157E-02 Markov E=    -880.101128361898     t=       62.5
 Qu       2114 E=    -879.981201498086     steps=  122 RMS= 0.50077E-02 Markov E=    -880.101128361898     t=       62.5
 Qu       2115 E=    -869.870074362781     steps=  110 RMS= 0.65248E-02 Markov E=    -879.981201498086     t=       62.6
 Qu       2116 E=    -847.872021767997     steps=  395 RMS= 0.67323E-02 Markov E=    -879.981201498086     t=       62.6
 Qu       2117 E=    -842.295523907711     steps=  343 RMS= 0.68689E-02 Markov E=    -879.981201498086     t=       62.7
 Qu       2118 E=    -858.598322063078     steps=  263 RMS= 0.61041E-02 Markov E=    -879.981201498086     t=       62.7
 Qu       2119 E=    -876.543303605017     steps=  105 RMS= 0.69846E-02 Markov E=    -879.981201498086     t=       62.7
 Qu       2120 E=    -878.247225042378     steps=  116 RMS= 0.66151E-02 Markov E=    -879.981201498086     t=       62.8
 Qu       2121 E=    -880.243886002869     steps=  112 RMS= 0.56463E-02 Markov E=    -879.981201498086     t=       62.8
 Qu       2122 E=    -876.673843166029     steps=  144 RMS= 0.69066E-02 Markov E=    -880.243886002869     t=       62.8
 Qu       2123 E=    -856.995651310312     steps=  456 RMS= 0.60927E-02 Markov E=    -880.243886002869     t=       62.9
 Qu       2124 E=    -865.498085629468     steps=  353 RMS= 0.64451E-02 Markov E=    -880.243886002869     t=       62.9
 Qu       2125 E=    -868.341939438154     steps=  217 RMS= 0.58437E-02 Markov E=    -880.243886002869     t=       63.0
 Qu       2126 E=    -878.186408189055     steps=  188 RMS= 0.66771E-02 Markov E=    -880.243886002869     t=       63.0
 Qu       2127 E=    -880.078092291956     steps=  105 RMS= 0.50713E-02 Markov E=    -880.243886002869     t=       63.0
 Qu       2128 E=    -842.157827142367     steps=  283 RMS= 0.67372E-02 Markov E=    -880.078092291956     t=       63.1
 Qu       2129 E=    -860.624809926547     steps=  314 RMS= 0.58279E-02 Markov E=    -880.078092291956     t=       63.1
 Qu       2130 E=    -877.644429231667     steps=  141 RMS= 0.55559E-02 Markov E=    -880.078092291956     t=       63.1
 Qu       2131 E=    -877.697242558739     steps=  152 RMS= 0.66173E-02 Markov E=    -880.078092291956     t=       63.1
 Qu       2132 E=    -874.352390328335     steps=  466 RMS= 0.64881E-02 Markov E=    -880.078092291956     t=       63.2
 Qu       2133 E=    -841.727956023763     steps=  468 RMS= 0.61447E-02 Markov E=    -880.078092291956     t=       63.3
 Qu       2134 E=    -879.158460835575     steps=  135 RMS= 0.65601E-02 Markov E=    -880.078092291956     t=       63.3
 Qu       2135 E=    -877.132305124842     steps=   95 RMS= 0.65890E-02 Markov E=    -880.078092291956     t=       63.3
 Qu       2136 E=    -866.758245492866     steps=  187 RMS= 0.69465E-02 Markov E=    -880.078092291956     t=       63.4
 Qu       2137 E=    -873.988454312510     steps=  166 RMS= 0.64845E-02 Markov E=    -880.078092291956     t=       63.4
 Qu       2138 E=    -878.875895219494     steps=   77 RMS= 0.50301E-02 Markov E=    -880.078092291956     t=       63.4
 Qu       2139 E=    -877.683485228676     steps=  190 RMS= 0.62791E-02 Markov E=    -880.078092291956     t=       63.4
 Qu       2140 E=    -873.243601469462     steps=  250 RMS= 0.37964E-02 Markov E=    -880.078092291956     t=       63.5
 Qu       2141 E=    -848.222683719542     steps=  243 RMS= 0.59715E-02 Markov E=    -880.078092291956     t=       63.5
 Qu       2142 E=    -864.252137308604     steps=  191 RMS= 0.68463E-02 Markov E=    -880.078092291956     t=       63.5
 Qu       2143 E=    -854.341572747688     steps=  255 RMS= 0.63738E-02 Markov E=    -880.078092291956     t=       63.6
 Qu       2144 E=    -879.740083294812     steps=  163 RMS= 0.62048E-02 Markov E=    -880.078092291956     t=       63.6
 Qu       2145 E=    -878.443348188555     steps=   76 RMS= 0.59636E-02 Markov E=    -879.740083294812     t=       63.6
 Qu       2146 E=    -861.671363618951     steps=  262 RMS= 0.55272E-02 Markov E=    -879.740083294812     t=       63.6
 Qu       2147 E=    -844.118114833016     steps=  298 RMS= 0.66537E-02 Markov E=    -879.740083294812     t=       63.7
 Qu       2148 E=    -871.081653946682     steps=  235 RMS= 0.66183E-02 Markov E=    -879.740083294812     t=       63.7
 Qu       2149 E=    -877.791990822992     steps=  203 RMS= 0.67012E-02 Markov E=    -879.740083294812     t=       63.7
 Qu       2150 E=    -878.911545222181     steps=   92 RMS= 0.50894E-02 Markov E=    -879.740083294812     t=       63.8
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       2151 E=    -879.961776712382     steps=  105 RMS= 0.63282E-02 Markov E=    -879.740083294812     t=       63.8
 Qu       2152 E=    -853.178627619200     steps=  281 RMS= 0.61376E-02 Markov E=    -879.961776712382     t=       63.8
 Qu       2153 E=    -848.406506454939     steps=  235 RMS= 0.62131E-02 Markov E=    -879.961776712382     t=       63.8
 Qu       2154 E=    -867.019715585795     steps=  452 RMS= 0.60423E-02 Markov E=    -879.961776712382     t=       63.9
 Qu       2155 E=    -876.134020545098     steps=  116 RMS= 0.52847E-02 Markov E=    -879.961776712382     t=       63.9
 Qu       2156 E=    -869.988402742227     steps=  212 RMS= 0.68099E-02 Markov E=    -879.961776712382     t=       64.0
 Qu       2157 E=    -878.473766660701     steps=   99 RMS= 0.56588E-02 Markov E=    -879.961776712382     t=       64.0
 Qu       2158 E=    -841.095134803687     steps=  263 RMS= 0.60186E-02 Markov E=    -879.961776712382     t=       64.0
 Qu       2159 E=    -838.507490956370     steps=  329 RMS= 0.67018E-02 Markov E=    -879.961776712382     t=       64.1
 Qu       2160 E=    -872.577467504514     steps=  196 RMS= 0.62521E-02 Markov E=    -879.961776712382     t=       64.1
 Qu       2161 E=    -864.222564992365     steps=  174 RMS= 0.66119E-02 Markov E=    -879.961776712382     t=       64.1
 Qu       2162 E=    -875.344103985960     steps=  102 RMS= 0.57491E-02 Markov E=    -879.961776712382     t=       64.1
 Qu       2163 E=    -838.762843475541     steps=  290 RMS= 0.64755E-02 Markov E=    -879.961776712382     t=       64.2
 Qu       2164 E=    -872.326296537260     steps=  254 RMS= 0.58998E-02 Markov E=    -879.961776712382     t=       64.2
 Qu       2165 E=    -878.864809558396     steps=  108 RMS= 0.56535E-02 Markov E=    -879.961776712382     t=       64.2
 Qu       2166 E=    -858.928821173997     steps=  210 RMS= 0.59966E-02 Markov E=    -879.961776712382     t=       64.3
 Qu       2167 E=    -875.842120737737     steps=  212 RMS= 0.66521E-02 Markov E=    -879.961776712382     t=       64.3
 Qu       2168 E=    -879.337906718444     steps=  139 RMS= 0.59277E-02 Markov E=    -879.961776712382     t=       64.3
 Qu       2169 E=    -878.925854563492     steps=  212 RMS= 0.63324E-02 Markov E=    -879.337906718444     t=       64.3
 Qu       2170 E=    -846.601630917254     steps=  250 RMS= 0.68422E-02 Markov E=    -878.925854563492     t=       64.4
 Qu       2171 E=    -868.772946104378     steps=  189 RMS= 0.53385E-02 Markov E=    -878.925854563492     t=       64.4
 Qu       2172 E=    -882.143689432911     steps=  121 RMS= 0.69569E-02 Markov E=    -878.925854563492     t=       64.4
 Qu       2173 E=    -877.218485799396     steps=   99 RMS= 0.45548E-02 Markov E=    -882.143689432911     t=       64.4
 Qu       2174 E=    -848.558056337852     steps=  462 RMS= 0.63394E-02 Markov E=    -882.143689432911     t=       64.5
 Qu       2175 E=    -874.340459465877     steps=  138 RMS= 0.55633E-02 Markov E=    -882.143689432911     t=       64.5
 Qu       2176 E=    -865.539126760469     steps=  206 RMS= 0.62196E-02 Markov E=    -882.143689432911     t=       64.5
 Qu       2177 E=    -875.669360260146     steps=  130 RMS= 0.61496E-02 Markov E=    -882.143689432911     t=       64.6
 Qu       2178 E=    -860.936626847990     steps=  159 RMS= 0.68035E-02 Markov E=    -882.143689432911     t=       64.6
 Qu       2179 E=    -872.091845021920     steps=  175 RMS= 0.67221E-02 Markov E=    -882.143689432911     t=       64.6
 Qu       2180 E=    -877.439740207829     steps=  145 RMS= 0.64285E-02 Markov E=    -882.143689432911     t=       64.6
 Qu       2181 E=    -874.580972494478     steps=  250 RMS= 0.39419E-02 Markov E=    -882.143689432911     t=       64.7
 Qu       2182 E=    -857.338416043399     steps=  256 RMS= 0.69437E-02 Markov E=    -882.143689432911     t=       64.7
 Qu       2183 E=    -877.631141718491     steps=  103 RMS= 0.42374E-02 Markov E=    -882.143689432911     t=       64.7
 Qu       2184 E=    -866.757668627146     steps=  283 RMS= 0.65860E-02 Markov E=    -882.143689432911     t=       64.8
 Qu       2185 E=    -850.891696296875     steps=  178 RMS= 0.49628E-02 Markov E=    -882.143689432911     t=       64.8
 Qu       2186 E=    -870.489461057003     steps=  207 RMS= 0.51256E-02 Markov E=    -882.143689432911     t=       64.8
 Qu       2187 E=    -873.797571304238     steps=  104 RMS= 0.68797E-02 Markov E=    -882.143689432911     t=       64.8
 Qu       2188 E=    -878.680196977462     steps=  104 RMS= 0.65711E-02 Markov E=    -882.143689432911     t=       64.8
 Qu       2189 E=    -879.522482388970     steps=  235 RMS= 0.68845E-02 Markov E=    -882.143689432911     t=       64.9
 Qu       2190 E=    -880.862160765544     steps=   88 RMS= 0.68560E-02 Markov E=    -882.143689432911     t=       64.9
 Qu       2191 E=    -868.449397870350     steps=  147 RMS= 0.56696E-02 Markov E=    -880.862160765544     t=       64.9
 Qu       2192 E=    -881.423554068697     steps=  266 RMS= 0.56702E-02 Markov E=    -880.862160765544     t=       64.9
 Qu       2193 E=    -866.271374016957     steps=  340 RMS= 0.52485E-02 Markov E=    -881.423554068697     t=       65.0
 Qu       2194 E=    -875.957084987004     steps=  202 RMS= 0.65804E-02 Markov E=    -881.423554068697     t=       65.0
 Qu       2195 E=    -873.501477850718     steps=  120 RMS= 0.67121E-02 Markov E=    -881.423554068697     t=       65.0
 Qu       2196 E=    -865.918641529627     steps=  134 RMS= 0.61265E-02 Markov E=    -881.423554068697     t=       65.1
 Qu       2197 E=    -855.700839864297     steps=  314 RMS= 0.64941E-02 Markov E=    -881.423554068697     t=       65.1
 Qu       2198 E=    -879.248131249241     steps=   91 RMS= 0.66310E-02 Markov E=    -881.423554068697     t=       65.1
 Qu       2199 E=    -873.940447510624     steps=  121 RMS= 0.56108E-02 Markov E=    -881.423554068697     t=       65.1
 Qu       2200 E=    -867.748260501031     steps=  371 RMS= 0.66991E-02 Markov E=    -881.423554068697     t=       65.2
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       2201 E=    -873.184352207606     steps=  136 RMS= 0.48446E-02 Markov E=    -881.423554068697     t=       65.2
 Qu       2202 E=    -868.471895283635     steps=  107 RMS= 0.67571E-02 Markov E=    -881.423554068697     t=       65.2
 Qu       2203 E=    -844.759443954807     steps=  269 RMS= 0.69272E-02 Markov E=    -881.423554068697     t=       65.2
 Qu       2204 E=    -875.995573879479     steps=  130 RMS= 0.42439E-02 Markov E=    -881.423554068697     t=       65.3
 Qu       2205 E=    -861.619052551042     steps=  191 RMS= 0.49435E-02 Markov E=    -881.423554068697     t=       65.3
 Qu       2206 E=    -879.195204865252     steps=  112 RMS= 0.68737E-02 Markov E=    -881.423554068697     t=       65.3
 Qu       2207 E=    -842.326985085091     steps=  342 RMS= 0.65823E-02 Markov E=    -881.423554068697     t=       65.3
 Qu       2208 E=    -849.439810275092     steps=  394 RMS= 0.65419E-02 Markov E=    -881.423554068697     t=       65.4
 Qu       2209 E=    -879.151131252297     steps=  196 RMS= 0.67289E-02 Markov E=    -881.423554068697     t=       65.4
 Qu       2210 E=    -873.709455166300     steps=  152 RMS= 0.59381E-02 Markov E=    -881.423554068697     t=       65.4
 Qu       2211 E=    -879.105338742488     steps=  125 RMS= 0.59122E-02 Markov E=    -881.423554068697     t=       65.5
 Qu       2212 E=    -880.434805004481     steps=   99 RMS= 0.44323E-02 Markov E=    -881.423554068697     t=       65.5
 Qu       2213 E=    -869.098531783941     steps=  103 RMS= 0.41389E-02 Markov E=    -880.434805004481     t=       65.5
 Qu       2214 E=    -876.667369193288     steps=  156 RMS= 0.52398E-02 Markov E=    -880.434805004481     t=       65.5
 Qu       2215 E=    -850.409447589872     steps=  184 RMS= 0.61066E-02 Markov E=    -880.434805004481     t=       65.5
 Qu       2216 E=    -879.179310482627     steps=   86 RMS= 0.43246E-02 Markov E=    -880.434805004481     t=       65.6
 Qu       2217 E=    -879.099707889510     steps=   94 RMS= 0.66915E-02 Markov E=    -880.434805004481     t=       65.6
 Qu       2218 E=    -843.230949038891     steps=  257 RMS= 0.56040E-02 Markov E=    -879.099707889510     t=       65.6
 Qu       2219 E=    -879.269519469061     steps=   89 RMS= 0.60851E-02 Markov E=    -879.099707889510     t=       65.6
 Qu       2220 E=    -852.467421193953     steps=  210 RMS= 0.56076E-02 Markov E=    -879.269519469061     t=       65.6
 Qu       2221 E=    -876.299232195915     steps=  172 RMS= 0.63926E-02 Markov E=    -879.269519469061     t=       65.7
 Qu       2222 E=    -881.387547848609     steps=  218 RMS= 0.58941E-02 Markov E=    -879.269519469061     t=       65.7
 Qu       2223 E=    -876.840879518064     steps=  143 RMS= 0.45078E-02 Markov E=    -881.387547848609     t=       65.7
 Qu       2224 E=    -873.673190496262     steps=  151 RMS= 0.69501E-02 Markov E=    -881.387547848609     t=       65.7
 Qu       2225 E=    -869.343771971557     steps=  249 RMS= 0.61680E-02 Markov E=    -881.387547848609     t=       65.8
 Qu       2226 E=    -876.421857326644     steps=  162 RMS= 0.63209E-02 Markov E=    -881.387547848609     t=       65.8
 Qu       2227 E=    -848.409802896952     steps=  251 RMS= 0.67821E-02 Markov E=    -881.387547848609     t=       65.8
 Qu       2228 E=    -876.954791048075     steps=  100 RMS= 0.67597E-02 Markov E=    -881.387547848609     t=       65.8
 Qu       2229 E=    -878.035661687910     steps=  151 RMS= 0.51658E-02 Markov E=    -881.387547848609     t=       65.9
 Qu       2230 E=    -875.767454189073     steps=  244 RMS= 0.60317E-02 Markov E=    -878.035661687910     t=       65.9
 Qu       2231 E=    -874.804928271038     steps=  177 RMS= 0.66726E-02 Markov E=    -878.035661687910     t=       65.9
 Qu       2232 E=    -876.195026567289     steps=  159 RMS= 0.68679E-02 Markov E=    -878.035661687910     t=       65.9
 Qu       2233 E=    -872.632511861480     steps=  168 RMS= 0.46548E-02 Markov E=    -876.195026567289     t=       66.0
 Qu       2234 E=    -874.470284404666     steps=  161 RMS= 0.67241E-02 Markov E=    -876.195026567289     t=       66.0
 Qu       2235 E=    -876.569985168010     steps=  104 RMS= 0.55534E-02 Markov E=    -876.195026567289     t=       66.0
 Qu       2236 E=    -856.197218110767     steps=  394 RMS= 0.57660E-02 Markov E=    -876.569985168010     t=       66.0
 Qu       2237 E=    -872.724931583176     steps=  103 RMS= 0.67203E-02 Markov E=    -876.569985168010     t=       66.1
 Qu       2238 E=    -877.755484797441     steps=  117 RMS= 0.65575E-02 Markov E=    -876.569985168010     t=       66.1
 Qu       2239 E=    -872.279725927634     steps=  169 RMS= 0.54001E-02 Markov E=    -877.755484797441     t=       66.1
 Qu       2240 E=    -872.989301217074     steps=  144 RMS= 0.51112E-02 Markov E=    -877.755484797441     t=       66.1
 Qu       2241 E=    -854.196344221645     steps=  262 RMS= 0.68126E-02 Markov E=    -877.755484797441     t=       66.2
 Qu       2242 E=    -848.638992900664     steps=  357 RMS= 0.69953E-02 Markov E=    -877.755484797441     t=       66.2
 Qu       2243 E=    -878.063026210328     steps=  107 RMS= 0.67045E-02 Markov E=    -877.755484797441     t=       66.2
 Qu       2244 E=    -850.570464164760     steps=  400 RMS= 0.69734E-02 Markov E=    -878.063026210328     t=       66.3
 Qu       2245 E=    -872.519706426755     steps=  196 RMS= 0.56449E-02 Markov E=    -878.063026210328     t=       66.3
 Qu       2246 E=    -878.339891098031     steps=  231 RMS= 0.57480E-02 Markov E=    -878.063026210328     t=       66.3
 Qu       2247 E=    -868.454786287766     steps=  220 RMS= 0.53103E-02 Markov E=    -878.339891098031     t=       66.4
 Qu       2248 E=    -875.723121043111     steps=  113 RMS= 0.57741E-02 Markov E=    -878.339891098031     t=       66.4
 Qu       2249 E=    -877.967904536537     steps=  144 RMS= 0.64616E-02 Markov E=    -878.339891098031     t=       66.4
 Qu       2250 E=    -875.103565064372     steps=  118 RMS= 0.58074E-02 Markov E=    -877.967904536537     t=       66.4
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       2251 E=    -848.051538329849     steps=  269 RMS= 0.62704E-02 Markov E=    -877.967904536537     t=       66.5
 Qu       2252 E=    -877.797728401619     steps=  183 RMS= 0.69038E-02 Markov E=    -877.967904536537     t=       66.5
 Qu       2253 E=    -880.605467135593     steps=  140 RMS= 0.69333E-02 Markov E=    -877.967904536537     t=       66.5
 Qu       2254 E=    -855.064002638680     steps=  388 RMS= 0.64390E-02 Markov E=    -880.605467135593     t=       66.6
 Qu       2255 E=    -870.588187954078     steps=  149 RMS= 0.54180E-02 Markov E=    -880.605467135593     t=       66.6
 Qu       2256 E=    -869.969250357505     steps=  311 RMS= 0.59709E-02 Markov E=    -880.605467135593     t=       66.6
 Qu       2257 E=    -874.850153395017     steps=  217 RMS= 0.59372E-02 Markov E=    -880.605467135593     t=       66.7
 Qu       2258 E=    -878.554624493539     steps=  110 RMS= 0.67976E-02 Markov E=    -880.605467135593     t=       66.7
 Qu       2259 E=    -879.551545886949     steps=  142 RMS= 0.63624E-02 Markov E=    -880.605467135593     t=       66.7
 Qu       2260 E=    -857.368873795281     steps=  369 RMS= 0.67342E-02 Markov E=    -879.551545886949     t=       66.8
 Qu       2261 E=    -864.155314850058     steps=  267 RMS= 0.46998E-02 Markov E=    -879.551545886949     t=       66.8
 Qu       2262 E=    -877.688060209260     steps=  165 RMS= 0.69700E-02 Markov E=    -879.551545886949     t=       66.8
 Qu       2263 E=    -843.314520511203     steps=  393 RMS= 0.57654E-02 Markov E=    -879.551545886949     t=       66.9
 Qu       2264 E=    -878.560491861479     steps=  222 RMS= 0.44894E-02 Markov E=    -879.551545886949     t=       66.9
 Qu       2265 E=    -862.671153050331     steps=  170 RMS= 0.62962E-02 Markov E=    -878.560491861479     t=       66.9
 Qu       2266 E=    -878.561114308054     steps=   84 RMS= 0.68372E-02 Markov E=    -878.560491861479     t=       66.9
 Qu       2267 E=    -861.134339256126     steps=  161 RMS= 0.52630E-02 Markov E=    -878.561114308054     t=       67.0
 Qu       2268 E=    -878.046678174640     steps=  130 RMS= 0.65768E-02 Markov E=    -878.561114308054     t=       67.0
 Qu       2269 E=    -870.937986125701     steps=  197 RMS= 0.69317E-02 Markov E=    -878.561114308054     t=       67.0
 Qu       2270 E=    -869.930961416499     steps=  325 RMS= 0.68152E-02 Markov E=    -878.561114308054     t=       67.1
 Qu       2271 E=    -879.247171056847     steps=  108 RMS= 0.61382E-02 Markov E=    -878.561114308054     t=       67.1
 Qu       2272 E=    -878.467039262865     steps=   96 RMS= 0.61941E-02 Markov E=    -879.247171056847     t=       67.1
 Qu       2273 E=    -845.827931855338     steps=  280 RMS= 0.60501E-02 Markov E=    -878.467039262865     t=       67.1
 Qu       2274 E=    -877.786257221923     steps=  238 RMS= 0.56908E-02 Markov E=    -878.467039262865     t=       67.2
 Qu       2275 E=    -875.617126157358     steps=  228 RMS= 0.56732E-02 Markov E=    -877.786257221923     t=       67.2
 Qu       2276 E=    -878.263168498893     steps=  185 RMS= 0.58673E-02 Markov E=    -877.786257221923     t=       67.2
 Qu       2277 E=    -850.740967658127     steps=  182 RMS= 0.63055E-02 Markov E=    -878.263168498893     t=       67.2
 Qu       2278 E=    -865.101128493196     steps=  396 RMS= 0.45863E-02 Markov E=    -878.263168498893     t=       67.3
 Qu       2279 E=    -875.976114949835     steps=  202 RMS= 0.50588E-02 Markov E=    -878.263168498893     t=       67.3
 Qu       2280 E=    -877.114045281279     steps=  215 RMS= 0.61393E-02 Markov E=    -878.263168498893     t=       67.4
 Qu       2281 E=    -877.329953622825     steps=  153 RMS= 0.48491E-02 Markov E=    -877.114045281279     t=       67.4
 Qu       2282 E=    -862.508589497847     steps=  239 RMS= 0.54624E-02 Markov E=    -877.329953622825     t=       67.4
 Qu       2283 E=    -879.695945679534     steps=  209 RMS= 0.63726E-02 Markov E=    -877.329953622825     t=       67.4
 Qu       2284 E=    -879.293295179168     steps=  138 RMS= 0.67390E-02 Markov E=    -879.695945679534     t=       67.5
 Qu       2285 E=    -851.428903979557     steps=  255 RMS= 0.61144E-02 Markov E=    -879.293295179168     t=       67.5
 Qu       2286 E=    -880.489420485276     steps=  117 RMS= 0.57544E-02 Markov E=    -879.293295179168     t=       67.5
 Qu       2287 E=    -867.667126162909     steps=  121 RMS= 0.62671E-02 Markov E=    -880.489420485276     t=       67.5
 Qu       2288 E=    -872.825441331114     steps=  273 RMS= 0.69284E-02 Markov E=    -880.489420485276     t=       67.6
 Qu       2289 E=    -873.496204234292     steps=  153 RMS= 0.60372E-02 Markov E=    -880.489420485276     t=       67.6
 Qu       2290 E=    -844.677988676877     steps=  198 RMS= 0.68114E-02 Markov E=    -880.489420485276     t=       67.6
 Qu       2291 E=    -842.376194232281     steps=  409 RMS= 0.66525E-02 Markov E=    -880.489420485276     t=       67.7
 Qu       2292 E=    -862.051404057022     steps=  195 RMS= 0.56622E-02 Markov E=    -880.489420485276     t=       67.7
 Qu       2293 E=    -877.761365326730     steps=  171 RMS= 0.63812E-02 Markov E=    -880.489420485276     t=       67.7
 Qu       2294 E=    -876.324277259776     steps=  126 RMS= 0.63146E-02 Markov E=    -880.489420485276     t=       67.7
 Qu       2295 E=    -873.685760887771     steps=  241 RMS= 0.63913E-02 Markov E=    -880.489420485276     t=       67.8
 Qu       2296 E=    -874.984663769100     steps=  126 RMS= 0.69299E-02 Markov E=    -880.489420485276     t=       67.8
 Qu       2297 E=    -855.411011639691     steps=  501 RMS= 0.57811E-02 Markov E=    -880.489420485276     t=       67.9
 Qu       2298 E=    -874.335333031714     steps=  114 RMS= 0.60689E-02 Markov E=    -880.489420485276     t=       67.9
 Qu       2299 E=    -878.152733317765     steps=   99 RMS= 0.57292E-02 Markov E=    -880.489420485276     t=       67.9
 Qu       2300 E=    -877.747745008705     steps=  265 RMS= 0.60254E-02 Markov E=    -880.489420485276     t=       67.9
Acceptance ratio for previous     50 steps=  0.2600  FAC=  1.0500
 Qu       2301 E=    -847.113800093542     steps=  365 RMS= 0.66479E-02 Markov E=    -880.489420485276     t=       68.0
 Qu       2302 E=    -873.720925292884     steps=  132 RMS= 0.62276E-02 Markov E=    -880.489420485276     t=       68.0
 Qu       2303 E=    -848.905170405422     steps=  296 RMS= 0.59874E-02 Markov E=    -880.489420485276     t=       68.0
 Qu       2304 E=    -873.425750263425     steps=  204 RMS= 0.62273E-02 Markov E=    -880.489420485276     t=       68.1
 Qu       2305 E=    -874.903515097811     steps=  110 RMS= 0.41247E-02 Markov E=    -880.489420485276     t=       68.1
 Qu       2306 E=    -875.836140113039     steps=  551 RMS= 0.65254E-02 Markov E=    -880.489420485276     t=       68.1
 Qu       2307 E=    -873.576396281659     steps=  434 RMS= 0.67937E-02 Markov E=    -880.489420485276     t=       68.2
 Qu       2308 E=    -873.732134889960     steps=  184 RMS= 0.50938E-02 Markov E=    -880.489420485276     t=       68.2
 Qu       2309 E=    -878.384113975476     steps=  117 RMS= 0.69824E-02 Markov E=    -880.489420485276     t=       68.2
 Qu       2310 E=    -853.866257131172     steps=  618 RMS= 0.64240E-02 Markov E=    -880.489420485276     t=       68.3
 Qu       2311 E=    -876.250676835568     steps=  124 RMS= 0.54983E-02 Markov E=    -880.489420485276     t=       68.3
 Qu       2312 E=    -847.395999519700     steps=  399 RMS= 0.58078E-02 Markov E=    -880.489420485276     t=       68.4
 Qu       2313 E=    -876.030512080852     steps=  279 RMS= 0.69718E-02 Markov E=    -880.489420485276     t=       68.4
 Qu       2314 E=    -870.984137941377     steps=  198 RMS= 0.42470E-02 Markov E=    -880.489420485276     t=       68.5
 Qu       2315 E=    -878.673836965077     steps=  151 RMS= 0.48289E-02 Markov E=    -880.489420485276     t=       68.5
 Qu       2316 E=    -876.183392897826     steps=  106 RMS= 0.56832E-02 Markov E=    -880.489420485276     t=       68.5
 Qu       2317 E=    -866.967444665279     steps=  175 RMS= 0.66742E-02 Markov E=    -880.489420485276     t=       68.5
 Qu       2318 E=    -875.071549868988     steps=  130 RMS= 0.68577E-02 Markov E=    -880.489420485276     t=       68.5
 Qu       2319 E=    -875.482061489405     steps=  149 RMS= 0.64971E-02 Markov E=    -880.489420485276     t=       68.6
 Qu       2320 E=    -879.757531624030     steps=  114 RMS= 0.67019E-02 Markov E=    -880.489420485276     t=       68.6
 Qu       2321 E=    -864.158684709727     steps=  238 RMS= 0.65363E-02 Markov E=    -879.757531624030     t=       68.6
 Qu       2322 E=    -877.555916288493     steps=  146 RMS= 0.57882E-02 Markov E=    -879.757531624030     t=       68.6
 Qu       2323 E=    -876.785310549900     steps=  155 RMS= 0.62459E-02 Markov E=    -879.757531624030     t=       68.6
 Qu       2324 E=    -878.590384789915     steps=  145 RMS= 0.59730E-02 Markov E=    -879.757531624030     t=       68.7
 Qu       2325 E=    -871.176885724481     steps=  135 RMS= 0.55112E-02 Markov E=    -879.757531624030     t=       68.7
 Qu       2326 E=    -867.792979670781     steps=  297 RMS= 0.62319E-02 Markov E=    -879.757531624030     t=       68.7
 Qu       2327 E=    -840.704288057179     steps=  226 RMS= 0.57404E-02 Markov E=    -879.757531624030     t=       68.8
 Qu       2328 E=    -880.910662743115     steps=   87 RMS= 0.57715E-02 Markov E=    -879.757531624030     t=       68.8
 Qu       2329 E=    -875.946392033329     steps=   90 RMS= 0.59002E-02 Markov E=    -880.910662743115     t=       68.8
 Qu       2330 E=    -870.368121953700     steps=  185 RMS= 0.58453E-02 Markov E=    -880.910662743115     t=       68.8
 Qu       2331 E=    -877.189091534209     steps=  298 RMS= 0.42273E-02 Markov E=    -880.910662743115     t=       68.8
 Qu       2332 E=    -869.665699665780     steps=  302 RMS= 0.67887E-02 Markov E=    -880.910662743115     t=       68.9
 Qu       2333 E=    -878.537800296978     steps=  230 RMS= 0.51301E-02 Markov E=    -880.910662743115     t=       68.9
 Qu       2334 E=    -880.805780199027     steps=  123 RMS= 0.33364E-02 Markov E=    -880.910662743115     t=       68.9
 Qu       2335 E=    -874.213869336297     steps=  192 RMS= 0.61500E-02 Markov E=    -880.805780199027     t=       69.0
 Qu       2336 E=    -870.979805420949     steps=  115 RMS= 0.63497E-02 Markov E=    -880.805780199027     t=       69.0
 Qu       2337 E=    -850.422878104460     steps=  272 RMS= 0.57047E-02 Markov E=    -880.805780199027     t=       69.0
 Qu       2338 E=    -873.081428534705     steps=  144 RMS= 0.68636E-02 Markov E=    -880.805780199027     t=       69.0
 Qu       2339 E=    -874.926055675618     steps=  171 RMS= 0.57621E-02 Markov E=    -880.805780199027     t=       69.1
 Qu       2340 E=    -845.812512849868     steps=  336 RMS= 0.68322E-02 Markov E=    -880.805780199027     t=       69.1
 Qu       2341 E=    -872.554616858422     steps=  545 RMS= 0.53139E-02 Markov E=    -880.805780199027     t=       69.2
 Qu       2342 E=    -880.192373200847     steps=  164 RMS= 0.67397E-02 Markov E=    -880.805780199027     t=       69.2
 Qu       2343 E=    -852.000410499538     steps=  442 RMS= 0.53444E-02 Markov E=    -880.192373200847     t=       69.3
 Qu       2344 E=    -865.639280084241     steps=  293 RMS= 0.62508E-02 Markov E=    -880.192373200847     t=       69.3
 Qu       2345 E=    -842.237695566204     steps=  302 RMS= 0.69913E-02 Markov E=    -880.192373200847     t=       69.4
 Qu       2346 E=    -876.131005925971     steps=  165 RMS= 0.64144E-02 Markov E=    -880.192373200847     t=       69.4
 Qu       2347 E=    -876.612261809716     steps=  129 RMS= 0.65248E-02 Markov E=    -880.192373200847     t=       69.4
 Qu       2348 E=    -875.812123171212     steps=  208 RMS= 0.59338E-02 Markov E=    -880.192373200847     t=       69.4
 Qu       2349 E=    -878.519664723102     steps=  169 RMS= 0.61607E-02 Markov E=    -880.192373200847     t=       69.4
 Qu       2350 E=    -877.243943530680     steps=  133 RMS= 0.51744E-02 Markov E=    -880.192373200847     t=       69.5
Acceptance ratio for previous     50 steps=  0.0800  FAC=  1.0500
 Qu       2351 E=    -845.477043340754     steps=  251 RMS= 0.65426E-02 Markov E=    -880.192373200847     t=       69.5
 Qu       2352 E=    -879.234254117453     steps=  179 RMS= 0.68393E-02 Markov E=    -880.192373200847     t=       69.5
 Qu       2353 E=    -843.520520549836     steps=  246 RMS= 0.57063E-02 Markov E=    -880.192373200847     t=       69.6
 Qu       2354 E=    -874.492862625476     steps=  151 RMS= 0.52854E-02 Markov E=    -880.192373200847     t=       69.6
 Qu       2355 E=    -880.805548161433     steps=   72 RMS= 0.66296E-02 Markov E=    -880.192373200847     t=       69.6
 Qu       2356 E=    -861.099761058188     steps=  147 RMS= 0.66220E-02 Markov E=    -880.805548161433     t=       69.6
 Qu       2357 E=    -849.043439006558     steps=  365 RMS= 0.56860E-02 Markov E=    -880.805548161433     t=       69.7
 Qu       2358 E=    -848.462018263673     steps=  202 RMS= 0.63774E-02 Markov E=    -880.805548161433     t=       69.7
 Qu       2359 E=    -869.891843037939     steps=  143 RMS= 0.44709E-02 Markov E=    -880.805548161433     t=       69.7
 Qu       2360 E=    -875.547219674238     steps=  148 RMS= 0.66616E-02 Markov E=    -880.805548161433     t=       69.7
 Qu       2361 E=    -876.495932209411     steps=  101 RMS= 0.67269E-02 Markov E=    -880.805548161433     t=       69.7
 Qu       2362 E=    -875.876200031564     steps=  158 RMS= 0.42107E-02 Markov E=    -880.805548161433     t=       69.8
 Qu       2363 E=    -855.383246663276     steps=  301 RMS= 0.59085E-02 Markov E=    -880.805548161433     t=       69.8
 Qu       2364 E=    -880.047149455161     steps=  194 RMS= 0.61960E-02 Markov E=    -880.805548161433     t=       69.8
 Qu       2365 E=    -876.401412342602     steps=  214 RMS= 0.48757E-02 Markov E=    -880.805548161433     t=       69.9
 Qu       2366 E=    -879.273496083829     steps=  137 RMS= 0.47712E-02 Markov E=    -880.805548161433     t=       69.9
 Qu       2367 E=    -845.580436745541     steps=  276 RMS= 0.56311E-02 Markov E=    -879.273496083829     t=       69.9
 Qu       2368 E=    -853.306219683315     steps=  343 RMS= 0.60073E-02 Markov E=    -879.273496083829     t=       70.0
 Qu       2369 E=    -874.457133518226     steps=  118 RMS= 0.45320E-02 Markov E=    -879.273496083829     t=       70.0
 Qu       2370 E=    -873.291705457763     steps=  130 RMS= 0.61642E-02 Markov E=    -874.457133518226     t=       70.0
 Qu       2371 E=    -843.056811525171     steps=  645 RMS= 0.59494E-02 Markov E=    -873.291705457763     t=       70.1
 Qu       2372 E=    -871.540295822448     steps=  166 RMS= 0.61594E-02 Markov E=    -873.291705457763     t=       70.1
 Qu       2373 E=    -843.044507590254     steps=  454 RMS= 0.63416E-02 Markov E=    -873.291705457763     t=       70.2
 Qu       2374 E=    -850.936753005075     steps=  632 RMS= 0.67931E-02 Markov E=    -873.291705457763     t=       70.3
 Qu       2375 E=    -875.635475965493     steps=  101 RMS= 0.59109E-02 Markov E=    -873.291705457763     t=       70.3
 Qu       2376 E=    -875.275170630261     steps=  137 RMS= 0.59224E-02 Markov E=    -875.635475965493     t=       70.3
 Qu       2377 E=    -869.769737000574     steps=  134 RMS= 0.66426E-02 Markov E=    -875.635475965493     t=       70.3
 Qu       2378 E=    -874.065360147526     steps=  116 RMS= 0.54773E-02 Markov E=    -875.635475965493     t=       70.3
 Qu       2379 E=    -874.063657769567     steps=  107 RMS= 0.61637E-02 Markov E=    -875.635475965493     t=       70.3
 Qu       2380 E=    -844.152586716186     steps=  413 RMS= 0.64581E-02 Markov E=    -874.063657769567     t=       70.4
 Qu       2381 E=    -871.339059037804     steps=  243 RMS= 0.54407E-02 Markov E=    -874.063657769567     t=       70.4
 Qu       2382 E=    -852.056030672415     steps=  424 RMS= 0.67190E-02 Markov E=    -874.063657769567     t=       70.5
 Qu       2383 E=    -857.472550611062     steps=  278 RMS= 0.67572E-02 Markov E=    -874.063657769567     t=       70.5
 Qu       2384 E=    -846.188055539986     steps=  207 RMS= 0.55186E-02 Markov E=    -874.063657769567     t=       70.5
 Qu       2385 E=    -870.327552814359     steps=  124 RMS= 0.41506E-02 Markov E=    -874.063657769567     t=       70.6
 Qu       2386 E=    -868.757477403198     steps=  143 RMS= 0.63803E-02 Markov E=    -874.063657769567     t=       70.6
 Qu       2387 E=    -873.620366562308     steps=  126 RMS= 0.67304E-02 Markov E=    -874.063657769567     t=       70.6
 Qu       2388 E=    -876.406059045838     steps=  120 RMS= 0.51957E-02 Markov E=    -873.620366562308     t=       70.6
 Qu       2389 E=    -869.542877426037     steps=  128 RMS= 0.65206E-02 Markov E=    -876.406059045838     t=       70.6
 Qu       2390 E=    -875.844018805266     steps=  354 RMS= 0.56334E-02 Markov E=    -876.406059045838     t=       70.7
 Qu       2391 E=    -868.484497786643     steps=  197 RMS= 0.63448E-02 Markov E=    -875.844018805266     t=       70.7
 Qu       2392 E=    -873.093724670659     steps=   97 RMS= 0.64374E-02 Markov E=    -875.844018805266     t=       70.7
 Qu       2393 E=    -845.826376153251     steps=  299 RMS= 0.57032E-02 Markov E=    -875.844018805266     t=       70.8
 Qu       2394 E=    -874.461740689303     steps=  103 RMS= 0.44947E-02 Markov E=    -875.844018805266     t=       70.8
 Qu       2395 E=    -873.431952637410     steps=  108 RMS= 0.59633E-02 Markov E=    -875.844018805266     t=       70.8
 Qu       2396 E=    -875.906815340268     steps=  111 RMS= 0.64574E-02 Markov E=    -875.844018805266     t=       70.9
 Qu       2397 E=    -870.831602954251     steps=  150 RMS= 0.41754E-02 Markov E=    -875.906815340268     t=       70.9
 Qu       2398 E=    -859.534384075272     steps=  195 RMS= 0.67800E-02 Markov E=    -875.906815340268     t=       70.9
 Qu       2399 E=    -873.517696410369     steps=  142 RMS= 0.67305E-02 Markov E=    -875.906815340268     t=       70.9
 Qu       2400 E=    -874.445093080624     steps=   95 RMS= 0.51754E-02 Markov E=    -875.906815340268     t=       70.9
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       2401 E=    -875.455266818286     steps=  137 RMS= 0.47327E-02 Markov E=    -874.445093080624     t=       71.0
 Qu       2402 E=    -870.262617756643     steps=  127 RMS= 0.63612E-02 Markov E=    -875.455266818286     t=       71.0
 Qu       2403 E=    -872.383050969153     steps=  164 RMS= 0.59259E-02 Markov E=    -875.455266818286     t=       71.0
 Qu       2404 E=    -866.096678980311     steps=  180 RMS= 0.66107E-02 Markov E=    -875.455266818286     t=       71.0
 Qu       2405 E=    -852.578664495850     steps=  157 RMS= 0.56854E-02 Markov E=    -875.455266818286     t=       71.0
 Qu       2406 E=    -872.966340379001     steps=  115 RMS= 0.67601E-02 Markov E=    -875.455266818286     t=       71.1
 Qu       2407 E=    -867.563132167125     steps=  178 RMS= 0.63805E-02 Markov E=    -872.966340379001     t=       71.1
 Qu       2408 E=    -840.353038620706     steps=  291 RMS= 0.67793E-02 Markov E=    -872.966340379001     t=       71.1
 Qu       2409 E=    -844.772345392970     steps=  219 RMS= 0.66697E-02 Markov E=    -872.966340379001     t=       71.2
 Qu       2410 E=    -861.888612750738     steps=  144 RMS= 0.68793E-02 Markov E=    -872.966340379001     t=       71.2
 Qu       2411 E=    -865.049093296899     steps=  153 RMS= 0.65544E-02 Markov E=    -872.966340379001     t=       71.2
 Qu       2412 E=    -867.822476775025     steps=  144 RMS= 0.58775E-02 Markov E=    -872.966340379001     t=       71.2
 Qu       2413 E=    -868.518776558903     steps=  249 RMS= 0.64899E-02 Markov E=    -872.966340379001     t=       71.3
 Qu       2414 E=    -873.403239549467     steps=  133 RMS= 0.65330E-02 Markov E=    -872.966340379001     t=       71.3
 Qu       2415 E=    -873.029987755563     steps=  153 RMS= 0.44884E-02 Markov E=    -873.403239549467     t=       71.3
 Qu       2416 E=    -867.663327736253     steps=  299 RMS= 0.60547E-02 Markov E=    -873.029987755563     t=       71.3
 Qu       2417 E=    -871.402988899802     steps=  130 RMS= 0.61606E-02 Markov E=    -873.029987755563     t=       71.4
 Qu       2418 E=    -872.649672524882     steps=  160 RMS= 0.68777E-02 Markov E=    -873.029987755563     t=       71.4
 Qu       2419 E=    -831.842759243245     steps=  251 RMS= 0.68889E-02 Markov E=    -872.649672524882     t=       71.4
 Qu       2420 E=    -868.197470525390     steps=  174 RMS= 0.59343E-02 Markov E=    -872.649672524882     t=       71.4
 Qu       2421 E=    -874.584245566929     steps=  118 RMS= 0.60648E-02 Markov E=    -872.649672524882     t=       71.4
 Qu       2422 E=    -871.209466834411     steps=  204 RMS= 0.61944E-02 Markov E=    -874.584245566929     t=       71.5
 Qu       2423 E=    -873.468622208492     steps=  121 RMS= 0.65958E-02 Markov E=    -874.584245566929     t=       71.5
 Qu       2424 E=    -872.847574924197     steps=   95 RMS= 0.66542E-02 Markov E=    -874.584245566929     t=       71.5
 Qu       2425 E=    -874.824990333763     steps=   88 RMS= 0.67948E-02 Markov E=    -874.584245566929     t=       71.5
 Qu       2426 E=    -874.551844220442     steps=  102 RMS= 0.68294E-02 Markov E=    -874.824990333763     t=       71.5
 Qu       2427 E=    -849.383451327231     steps=  254 RMS= 0.68936E-02 Markov E=    -874.551844220442     t=       71.6
 Qu       2428 E=    -865.576201692561     steps=  171 RMS= 0.64684E-02 Markov E=    -874.551844220442     t=       71.6
 Qu       2429 E=    -865.942490856746     steps=  234 RMS= 0.46783E-02 Markov E=    -874.551844220442     t=       71.6
 Qu       2430 E=    -874.720980344258     steps=   87 RMS= 0.51039E-02 Markov E=    -874.551844220442     t=       71.6
 Qu       2431 E=    -847.940473628086     steps=  444 RMS= 0.59442E-02 Markov E=    -874.720980344258     t=       71.7
 Qu       2432 E=    -874.361728521518     steps=  103 RMS= 0.69988E-02 Markov E=    -874.720980344258     t=       71.7
 Qu       2433 E=    -850.864642628939     steps=  557 RMS= 0.62147E-02 Markov E=    -874.720980344258     t=       71.8
 Qu       2434 E=    -866.400554105014     steps=  161 RMS= 0.64713E-02 Markov E=    -874.720980344258     t=       71.8
 Qu       2435 E=    -870.544271073006     steps=  110 RMS= 0.58599E-02 Markov E=    -874.720980344258     t=       71.8
 Qu       2436 E=    -872.189481592913     steps=  109 RMS= 0.67659E-02 Markov E=    -874.720980344258     t=       71.8
 Qu       2437 E=    -871.871733711406     steps=  160 RMS= 0.57073E-02 Markov E=    -874.720980344258     t=       71.9
 Qu       2438 E=    -844.352552825626     steps=  202 RMS= 0.54456E-02 Markov E=    -874.720980344258     t=       71.9
 Qu       2439 E=    -873.568141284288     steps=  126 RMS= 0.40991E-02 Markov E=    -874.720980344258     t=       71.9
 Qu       2440 E=    -856.922741956488     steps=  238 RMS= 0.66915E-02 Markov E=    -873.568141284288     t=       71.9
 Qu       2441 E=    -867.150824356998     steps=  126 RMS= 0.63703E-02 Markov E=    -873.568141284288     t=       72.0
 Qu       2442 E=    -842.817984298483     steps=  469 RMS= 0.68554E-02 Markov E=    -873.568141284288     t=       72.0
 Qu       2443 E=    -868.800397942654     steps=  232 RMS= 0.53295E-02 Markov E=    -873.568141284288     t=       72.1
 Qu       2444 E=    -867.085271724675     steps=  165 RMS= 0.64249E-02 Markov E=    -873.568141284288     t=       72.1
 Qu       2445 E=    -866.150678599002     steps=  402 RMS= 0.69494E-02 Markov E=    -873.568141284288     t=       72.1
 Qu       2446 E=    -870.605937332567     steps=  134 RMS= 0.51220E-02 Markov E=    -873.568141284288     t=       72.2
 Qu       2447 E=    -844.407914982263     steps=  376 RMS= 0.68760E-02 Markov E=    -873.568141284288     t=       72.2
 Qu       2448 E=    -861.352217989444     steps=  233 RMS= 0.51613E-02 Markov E=    -873.568141284288     t=       72.2
 Qu       2449 E=    -872.890738041453     steps=  207 RMS= 0.57723E-02 Markov E=    -873.568141284288     t=       72.3
 Qu       2450 E=    -846.847936688851     steps=  348 RMS= 0.68989E-02 Markov E=    -872.890738041453     t=       72.3
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       2451 E=    -855.426112792393     steps=  242 RMS= 0.58011E-02 Markov E=    -872.890738041453     t=       72.4
 Qu       2452 E=    -872.675061923048     steps=   89 RMS= 0.55390E-02 Markov E=    -872.890738041453     t=       72.4
 Qu       2453 E=    -870.020189774641     steps=  213 RMS= 0.46964E-02 Markov E=    -872.675061923048     t=       72.4
 Qu       2454 E=    -853.181521213945     steps=  210 RMS= 0.64713E-02 Markov E=    -872.675061923048     t=       72.4
 Qu       2455 E=    -845.984286976007     steps=  497 RMS= 0.59555E-02 Markov E=    -872.675061923048     t=       72.5
 Qu       2456 E=    -840.507702409703     steps=  305 RMS= 0.59763E-02 Markov E=    -872.675061923048     t=       72.5
 Qu       2457 E=    -866.088785786211     steps=  181 RMS= 0.53069E-02 Markov E=    -872.675061923048     t=       72.6
 Qu       2458 E=    -869.250194040740     steps=  277 RMS= 0.69814E-02 Markov E=    -872.675061923048     t=       72.6
 Qu       2459 E=    -872.522670321092     steps=   99 RMS= 0.68558E-02 Markov E=    -872.675061923048     t=       72.6
 Qu       2460 E=    -855.417158062552     steps=  211 RMS= 0.67075E-02 Markov E=    -872.522670321092     t=       72.6
 Qu       2461 E=    -846.484618486035     steps=  286 RMS= 0.64864E-02 Markov E=    -872.522670321092     t=       72.7
 Qu       2462 E=    -871.585034059598     steps=  128 RMS= 0.46224E-02 Markov E=    -872.522670321092     t=       72.7
 Qu       2463 E=    -874.202818523150     steps=  374 RMS= 0.67150E-02 Markov E=    -872.522670321092     t=       72.8
 Qu       2464 E=    -873.693327823123     steps=  265 RMS= 0.41059E-02 Markov E=    -874.202818523150     t=       72.8
 Qu       2465 E=    -843.244006552925     steps=  326 RMS= 0.64415E-02 Markov E=    -873.693327823123     t=       72.8
 Qu       2466 E=    -875.953890202797     steps=  131 RMS= 0.62976E-02 Markov E=    -873.693327823123     t=       72.9
 Qu       2467 E=    -876.095882012342     steps=  133 RMS= 0.63130E-02 Markov E=    -875.953890202797     t=       72.9
 Qu       2468 E=    -872.614733741243     steps=  133 RMS= 0.69016E-02 Markov E=    -876.095882012342     t=       72.9
 Qu       2469 E=    -871.297537530161     steps=  117 RMS= 0.65512E-02 Markov E=    -876.095882012342     t=       72.9
 Qu       2470 E=    -868.349609483179     steps=  125 RMS= 0.68051E-02 Markov E=    -876.095882012342     t=       72.9
 Qu       2471 E=    -878.315322726726     steps=  100 RMS= 0.52823E-02 Markov E=    -876.095882012342     t=       72.9
 Qu       2472 E=    -866.438818126059     steps=  193 RMS= 0.62549E-02 Markov E=    -878.315322726726     t=       73.0
 Qu       2473 E=    -876.685556419253     steps=  141 RMS= 0.59840E-02 Markov E=    -878.315322726726     t=       73.0
 Qu       2474 E=    -862.278639384669     steps=  218 RMS= 0.68969E-02 Markov E=    -878.315322726726     t=       73.0
 Qu       2475 E=    -861.273512914237     steps=  235 RMS= 0.68755E-02 Markov E=    -878.315322726726     t=       73.1
 Qu       2476 E=    -875.562861777537     steps=  709 RMS= 0.62286E-02 Markov E=    -878.315322726726     t=       73.2
 Qu       2477 E=    -876.567398383351     steps=  138 RMS= 0.61519E-02 Markov E=    -878.315322726726     t=       73.2
 Qu       2478 E=    -872.967422230265     steps=   86 RMS= 0.54152E-02 Markov E=    -878.315322726726     t=       73.2
 Qu       2479 E=    -860.445353490201     steps=  283 RMS= 0.67408E-02 Markov E=    -878.315322726726     t=       73.2
 Qu       2480 E=    -845.163278231789     steps=  331 RMS= 0.57126E-02 Markov E=    -878.315322726726     t=       73.3
 Qu       2481 E=    -841.531900460284     steps=  464 RMS= 0.62982E-02 Markov E=    -878.315322726726     t=       73.3
 Qu       2482 E=    -876.258464267751     steps=  100 RMS= 0.57163E-02 Markov E=    -878.315322726726     t=       73.4
 Qu       2483 E=    -872.599536417089     steps=  177 RMS= 0.57818E-02 Markov E=    -878.315322726726     t=       73.4
 Qu       2484 E=    -871.208827249913     steps=  148 RMS= 0.56329E-02 Markov E=    -878.315322726726     t=       73.4
 Qu       2485 E=    -865.317800606452     steps=  344 RMS= 0.68370E-02 Markov E=    -878.315322726726     t=       73.4
 Qu       2486 E=    -835.764062195982     steps=  326 RMS= 0.64377E-02 Markov E=    -878.315322726726     t=       73.5
 Qu       2487 E=    -875.246946261374     steps=  139 RMS= 0.52300E-02 Markov E=    -878.315322726726     t=       73.5
 Qu       2488 E=    -868.009947075068     steps=  151 RMS= 0.53955E-02 Markov E=    -878.315322726726     t=       73.5
 Qu       2489 E=    -847.520941329503     steps=  319 RMS= 0.67847E-02 Markov E=    -878.315322726726     t=       73.6
 Qu       2490 E=    -849.831003123529     steps=  282 RMS= 0.56911E-02 Markov E=    -878.315322726726     t=       73.6
 Qu       2491 E=    -870.915365230600     steps=  122 RMS= 0.62118E-02 Markov E=    -878.315322726726     t=       73.6
 Qu       2492 E=    -871.094639814010     steps=   96 RMS= 0.59130E-02 Markov E=    -878.315322726726     t=       73.6
 Qu       2493 E=    -840.153796355712     steps=  258 RMS= 0.66327E-02 Markov E=    -878.315322726726     t=       73.7
 Qu       2494 E=    -873.971389456653     steps=  145 RMS= 0.58274E-02 Markov E=    -878.315322726726     t=       73.7
 Qu       2495 E=    -878.429524400922     steps=  157 RMS= 0.69442E-02 Markov E=    -878.315322726726     t=       73.7
 Qu       2496 E=    -873.535675787077     steps=  237 RMS= 0.55183E-02 Markov E=    -878.429524400922     t=       73.8
 Qu       2497 E=    -878.730998125787     steps=  103 RMS= 0.48582E-02 Markov E=    -878.429524400922     t=       73.8
 Qu       2498 E=    -874.063242087187     steps=  143 RMS= 0.56111E-02 Markov E=    -878.730998125787     t=       73.8
 Qu       2499 E=    -868.863933648504     steps=  255 RMS= 0.47708E-02 Markov E=    -878.730998125787     t=       73.8
 Qu       2500 E=    -848.806172439871     steps=  531 RMS= 0.60124E-02 Markov E=    -878.730998125787     t=       73.9
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu       2501 E=    -870.878782261509     steps=  235 RMS= 0.64102E-02 Markov E=    -878.730998125787     t=       73.9
 Qu       2502 E=    -873.767303052955     steps=  241 RMS= 0.60727E-02 Markov E=    -878.730998125787     t=       74.0
 Qu       2503 E=    -867.822971742688     steps=  172 RMS= 0.53969E-02 Markov E=    -878.730998125787     t=       74.0
 Qu       2504 E=    -849.932529939026     steps=  281 RMS= 0.68544E-02 Markov E=    -878.730998125787     t=       74.0
 Qu       2505 E=    -876.026111316322     steps=  171 RMS= 0.64902E-02 Markov E=    -878.730998125787     t=       74.1
 Qu       2506 E=    -842.219872388962     steps=  269 RMS= 0.67747E-02 Markov E=    -878.730998125787     t=       74.1
 Qu       2507 E=    -875.935538225287     steps=  192 RMS= 0.67686E-02 Markov E=    -878.730998125787     t=       74.1
 Qu       2508 E=    -843.698413265618     steps=  306 RMS= 0.67872E-02 Markov E=    -878.730998125787     t=       74.2
 Qu       2509 E=    -846.874631999958     steps=  298 RMS= 0.66152E-02 Markov E=    -878.730998125787     t=       74.2
 Qu       2510 E=    -873.304229419387     steps=  118 RMS= 0.44839E-02 Markov E=    -878.730998125787     t=       74.2
 Qu       2511 E=    -860.948719765372     steps=  423 RMS= 0.60189E-02 Markov E=    -878.730998125787     t=       74.3
 Qu       2512 E=    -849.244555530415     steps=  357 RMS= 0.57447E-02 Markov E=    -878.730998125787     t=       74.3
 Qu       2513 E=    -874.800886090835     steps=  169 RMS= 0.46348E-02 Markov E=    -878.730998125787     t=       74.4
 Qu       2514 E=    -875.207748097512     steps=  132 RMS= 0.68200E-02 Markov E=    -878.730998125787     t=       74.4
 Qu       2515 E=    -845.397723740864     steps=  353 RMS= 0.63654E-02 Markov E=    -878.730998125787     t=       74.4
 Qu       2516 E=    -872.195286100490     steps=  191 RMS= 0.58963E-02 Markov E=    -878.730998125787     t=       74.5
 Qu       2517 E=    -871.033492379204     steps=  138 RMS= 0.64815E-02 Markov E=    -878.730998125787     t=       74.5
 Qu       2518 E=    -860.485525719449     steps=  254 RMS= 0.68011E-02 Markov E=    -878.730998125787     t=       74.5
 Qu       2519 E=    -874.909069432761     steps=  151 RMS= 0.44332E-02 Markov E=    -878.730998125787     t=       74.5
 Qu       2520 E=    -858.115219145331     steps=  347 RMS= 0.56915E-02 Markov E=    -878.730998125787     t=       74.6
 Qu       2521 E=    -872.801877018487     steps=  115 RMS= 0.58425E-02 Markov E=    -878.730998125787     t=       74.6
 Qu       2522 E=    -851.066394211564     steps=  295 RMS= 0.69791E-02 Markov E=    -878.730998125787     t=       74.6
 Qu       2523 E=    -878.460262503846     steps=  104 RMS= 0.59744E-02 Markov E=    -878.730998125787     t=       74.7
 Qu       2524 E=    -871.707679561672     steps=  151 RMS= 0.48355E-02 Markov E=    -878.460262503846     t=       74.7
 Qu       2525 E=    -860.169188274767     steps=  138 RMS= 0.62511E-02 Markov E=    -878.460262503846     t=       74.7
 Qu       2526 E=    -875.190571395055     steps=  118 RMS= 0.65298E-02 Markov E=    -878.460262503846     t=       74.7
 Qu       2527 E=    -868.818557265931     steps=  173 RMS= 0.52302E-02 Markov E=    -878.460262503846     t=       74.7
 Qu       2528 E=    -871.849722742733     steps=  115 RMS= 0.64591E-02 Markov E=    -878.460262503846     t=       74.7
 Qu       2529 E=    -879.886604125020     steps=  243 RMS= 0.59519E-02 Markov E=    -878.460262503846     t=       74.8
 Qu       2530 E=    -851.787244846789     steps=  284 RMS= 0.69258E-02 Markov E=    -879.886604125020     t=       74.8
 Qu       2531 E=    -871.877969483438     steps=  189 RMS= 0.66663E-02 Markov E=    -879.886604125020     t=       74.8
 Qu       2532 E=    -878.132315291860     steps=  256 RMS= 0.42550E-02 Markov E=    -879.886604125020     t=       74.9
 Qu       2533 E=    -878.306681230625     steps=   88 RMS= 0.67001E-02 Markov E=    -879.886604125020     t=       74.9
 Qu       2534 E=    -864.361982889523     steps=  258 RMS= 0.69488E-02 Markov E=    -879.886604125020     t=       74.9
 Qu       2535 E=    -876.879750925208     steps=  149 RMS= 0.69292E-02 Markov E=    -879.886604125020     t=       75.0
 Qu       2536 E=    -856.419678216863     steps=  175 RMS= 0.61028E-02 Markov E=    -879.886604125020     t=       75.0
 Qu       2537 E=    -854.900968654640     steps=  215 RMS= 0.68354E-02 Markov E=    -879.886604125020     t=       75.0
 Qu       2538 E=    -871.960926828039     steps=  204 RMS= 0.68523E-02 Markov E=    -879.886604125020     t=       75.0
 Qu       2539 E=    -842.219231275965     steps=  163 RMS= 0.64864E-02 Markov E=    -879.886604125020     t=       75.1
 Qu       2540 E=    -876.339532201479     steps=  170 RMS= 0.65084E-02 Markov E=    -879.886604125020     t=       75.1
 Qu       2541 E=    -875.909077465257     steps=  168 RMS= 0.63196E-02 Markov E=    -879.886604125020     t=       75.1
 Qu       2542 E=    -877.628103315050     steps=  103 RMS= 0.58600E-02 Markov E=    -879.886604125020     t=       75.1
 Qu       2543 E=    -863.565379272433     steps=  161 RMS= 0.56744E-02 Markov E=    -879.886604125020     t=       75.1
 Qu       2544 E=    -873.811374470275     steps=  338 RMS= 0.39146E-02 Markov E=    -879.886604125020     t=       75.2
 Qu       2545 E=    -851.562011536874     steps=  561 RMS= 0.58973E-02 Markov E=    -879.886604125020     t=       75.3
 Qu       2546 E=    -880.259156407261     steps=  139 RMS= 0.64003E-02 Markov E=    -879.886604125020     t=       75.3
 Qu       2547 E=    -881.272789770390     steps=  113 RMS= 0.58833E-02 Markov E=    -880.259156407261     t=       75.3
 Qu       2548 E=    -854.229019350351     steps=  249 RMS= 0.53781E-02 Markov E=    -881.272789770390     t=       75.3
 Qu       2549 E=    -875.461228653767     steps=  126 RMS= 0.57799E-02 Markov E=    -881.272789770390     t=       75.4
 Qu       2550 E=    -865.398544650193     steps=  148 RMS= 0.63380E-02 Markov E=    -881.272789770390     t=       75.4
Acceptance ratio for previous     50 steps=  0.0800  FAC=  1.0500
 Qu       2551 E=    -880.195014316859     steps=  160 RMS= 0.62035E-02 Markov E=    -881.272789770390     t=       75.4
 Qu       2552 E=    -881.398349627111     steps=  184 RMS= 0.53893E-02 Markov E=    -881.272789770390     t=       75.4
 Qu       2553 E=    -865.294062556310     steps=  176 RMS= 0.68490E-02 Markov E=    -881.398349627111     t=       75.5
 Qu       2554 E=    -880.189744067683     steps=  150 RMS= 0.62613E-02 Markov E=    -881.398349627111     t=       75.5
 Qu       2555 E=    -869.144900725331     steps=  264 RMS= 0.64618E-02 Markov E=    -880.189744067683     t=       75.5
 Qu       2556 E=    -851.455676978266     steps=  273 RMS= 0.56007E-02 Markov E=    -880.189744067683     t=       75.6
 Qu       2557 E=    -877.876924368858     steps=  118 RMS= 0.48936E-02 Markov E=    -880.189744067683     t=       75.6
 Qu       2558 E=    -877.812456041876     steps=  104 RMS= 0.65421E-02 Markov E=    -880.189744067683     t=       75.6
 Qu       2559 E=    -877.583703745608     steps=  346 RMS= 0.51263E-02 Markov E=    -880.189744067683     t=       75.6
 Qu       2560 E=    -851.399879838609     steps=  436 RMS= 0.57830E-02 Markov E=    -880.189744067683     t=       75.7
 Qu       2561 E=    -871.460682445514     steps=   97 RMS= 0.60658E-02 Markov E=    -880.189744067683     t=       75.7
 Qu       2562 E=    -857.728877770901     steps=  519 RMS= 0.69282E-02 Markov E=    -880.189744067683     t=       75.8
 Qu       2563 E=    -879.335716182203     steps=  145 RMS= 0.63608E-02 Markov E=    -880.189744067683     t=       75.8
 Qu       2564 E=    -846.944604106176     steps=  356 RMS= 0.60619E-02 Markov E=    -880.189744067683     t=       75.8
 Qu       2565 E=    -839.799781268523     steps=  232 RMS= 0.59627E-02 Markov E=    -880.189744067683     t=       75.9
 Qu       2566 E=    -870.955585075490     steps=  123 RMS= 0.50137E-02 Markov E=    -880.189744067683     t=       75.9
 Qu       2567 E=    -873.150123976997     steps=  129 RMS= 0.65244E-02 Markov E=    -880.189744067683     t=       75.9
 Qu       2568 E=    -879.030879422620     steps=  224 RMS= 0.68528E-02 Markov E=    -880.189744067683     t=       75.9
 Qu       2569 E=    -875.730395479297     steps=  137 RMS= 0.58128E-02 Markov E=    -879.030879422620     t=       76.0
 Qu       2570 E=    -876.398739326286     steps=  137 RMS= 0.68849E-02 Markov E=    -879.030879422620     t=       76.0
 Qu       2571 E=    -874.883092073733     steps=  175 RMS= 0.68797E-02 Markov E=    -879.030879422620     t=       76.0
 Qu       2572 E=    -872.723043976930     steps=  177 RMS= 0.64188E-02 Markov E=    -879.030879422620     t=       76.0
 Qu       2573 E=    -873.493836935247     steps=  162 RMS= 0.56320E-02 Markov E=    -879.030879422620     t=       76.1
 Qu       2574 E=    -853.482438120607     steps=  328 RMS= 0.67258E-02 Markov E=    -879.030879422620     t=       76.1
 Qu       2575 E=    -872.735061068816     steps=  106 RMS= 0.62822E-02 Markov E=    -879.030879422620     t=       76.1
 Qu       2576 E=    -877.248247144752     steps=   96 RMS= 0.56140E-02 Markov E=    -879.030879422620     t=       76.1
 Qu       2577 E=    -879.145135948580     steps=   98 RMS= 0.57799E-02 Markov E=    -879.030879422620     t=       76.1
 Qu       2578 E=    -874.277588998332     steps=  143 RMS= 0.64455E-02 Markov E=    -879.145135948580     t=       76.2
 Qu       2579 E=    -877.856900833927     steps=  134 RMS= 0.64394E-02 Markov E=    -879.145135948580     t=       76.2
 Qu       2580 E=    -875.412410884713     steps=  100 RMS= 0.66836E-02 Markov E=    -879.145135948580     t=       76.2
 Qu       2581 E=    -874.488523707153     steps=  159 RMS= 0.54245E-02 Markov E=    -879.145135948580     t=       76.2
 Qu       2582 E=    -838.540962438123     steps=  355 RMS= 0.64772E-02 Markov E=    -879.145135948580     t=       76.3
 Qu       2583 E=    -877.680652048384     steps=  125 RMS= 0.54804E-02 Markov E=    -879.145135948580     t=       76.3
 Qu       2584 E=    -876.849859133222     steps=  128 RMS= 0.58313E-02 Markov E=    -879.145135948580     t=       76.3
 Qu       2585 E=    -837.843282692224     steps=  231 RMS= 0.56992E-02 Markov E=    -879.145135948580     t=       76.3
 Qu       2586 E=    -877.919100943217     steps=  104 RMS= 0.51827E-02 Markov E=    -879.145135948580     t=       76.4
 Qu       2587 E=    -865.319316163817     steps=  335 RMS= 0.67604E-02 Markov E=    -879.145135948580     t=       76.4
 Qu       2588 E=    -844.616771974983     steps=  230 RMS= 0.66038E-02 Markov E=    -879.145135948580     t=       76.4
 Qu       2589 E=    -866.961163643251     steps=  356 RMS= 0.66128E-02 Markov E=    -879.145135948580     t=       76.5
 Qu       2590 E=    -867.070965299823     steps=  290 RMS= 0.65162E-02 Markov E=    -879.145135948580     t=       76.5
 Qu       2591 E=    -879.166137346599     steps=  115 RMS= 0.67806E-02 Markov E=    -879.145135948580     t=       76.5
 Qu       2592 E=    -860.481847773249     steps=  268 RMS= 0.59488E-02 Markov E=    -879.166137346599     t=       76.6
 Qu       2593 E=    -874.077536475949     steps=  124 RMS= 0.56243E-02 Markov E=    -879.166137346599     t=       76.6
 Qu       2594 E=    -871.240623043402     steps=  224 RMS= 0.57748E-02 Markov E=    -879.166137346599     t=       76.6
 Qu       2595 E=    -877.248262216322     steps=  102 RMS= 0.69727E-02 Markov E=    -879.166137346599     t=       76.6
 Qu       2596 E=    -877.851082841645     steps=  101 RMS= 0.58998E-02 Markov E=    -879.166137346599     t=       76.7
 Qu       2597 E=    -846.946545342756     steps=  245 RMS= 0.67979E-02 Markov E=    -879.166137346599     t=       76.7
 Qu       2598 E=    -857.246551226853     steps=  182 RMS= 0.61997E-02 Markov E=    -879.166137346599     t=       76.7
 Qu       2599 E=    -879.145139292210     steps=  134 RMS= 0.48106E-02 Markov E=    -879.166137346599     t=       76.7
 Qu       2600 E=    -874.296452576990     steps=  157 RMS= 0.56025E-02 Markov E=    -879.145139292210     t=       76.8
Acceptance ratio for previous     50 steps=  0.1200  FAC=  1.0500
 Qu       2601 E=    -877.973567280299     steps=  137 RMS= 0.58420E-02 Markov E=    -879.145139292210     t=       76.8
 Qu       2602 E=    -874.082527417844     steps=  132 RMS= 0.67912E-02 Markov E=    -879.145139292210     t=       76.8
 Qu       2603 E=    -878.422190622248     steps=  119 RMS= 0.63678E-02 Markov E=    -879.145139292210     t=       76.8
 Qu       2604 E=    -874.700784414137     steps=  109 RMS= 0.55524E-02 Markov E=    -879.145139292210     t=       76.8
 Qu       2605 E=    -874.277504575777     steps=  123 RMS= 0.56089E-02 Markov E=    -879.145139292210     t=       76.8
 Qu       2606 E=    -871.782231588651     steps=  501 RMS= 0.46413E-02 Markov E=    -879.145139292210     t=       76.9
 Qu       2607 E=    -874.277516783675     steps=  123 RMS= 0.67977E-02 Markov E=    -879.145139292210     t=       76.9
 Qu       2608 E=    -872.607188183887     steps=  102 RMS= 0.60286E-02 Markov E=    -879.145139292210     t=       76.9
 Qu       2609 E=    -876.439018996983     steps=  120 RMS= 0.56105E-02 Markov E=    -879.145139292210     t=       77.0
 Qu       2610 E=    -869.917744137629     steps=  192 RMS= 0.67410E-02 Markov E=    -879.145139292210     t=       77.0
 Qu       2611 E=    -878.934891679588     steps=  107 RMS= 0.46129E-02 Markov E=    -879.145139292210     t=       77.0
 Qu       2612 E=    -860.205865376094     steps=  219 RMS= 0.63414E-02 Markov E=    -878.934891679588     t=       77.0
 Qu       2613 E=    -851.616379753598     steps=  298 RMS= 0.67078E-02 Markov E=    -878.934891679588     t=       77.1
 Qu       2614 E=    -854.990843580877     steps=  378 RMS= 0.64575E-02 Markov E=    -878.934891679588     t=       77.1
 Qu       2615 E=    -878.534643594466     steps=  167 RMS= 0.50002E-02 Markov E=    -878.934891679588     t=       77.1
 Qu       2616 E=    -878.818864154678     steps=  130 RMS= 0.67032E-02 Markov E=    -878.534643594466     t=       77.2
 Qu       2617 E=    -874.799850851955     steps=  197 RMS= 0.61296E-02 Markov E=    -878.818864154678     t=       77.2
 Qu       2618 E=    -870.714103103633     steps=  325 RMS= 0.46743E-02 Markov E=    -878.818864154678     t=       77.2
 Qu       2619 E=    -879.122415291442     steps=  150 RMS= 0.39759E-02 Markov E=    -878.818864154678     t=       77.3
 Qu       2620 E=    -857.359325414465     steps=  214 RMS= 0.57109E-02 Markov E=    -879.122415291442     t=       77.3
 Qu       2621 E=    -875.400308051449     steps=  175 RMS= 0.42230E-02 Markov E=    -879.122415291442     t=       77.3
 Qu       2622 E=    -877.122610601213     steps=   87 RMS= 0.59761E-02 Markov E=    -879.122415291442     t=       77.3
 Qu       2623 E=    -877.210229227973     steps=  152 RMS= 0.60684E-02 Markov E=    -879.122415291442     t=       77.3
 Qu       2624 E=    -868.297161383533     steps=  326 RMS= 0.56668E-02 Markov E=    -879.122415291442     t=       77.4
 Qu       2625 E=    -873.209529359484     steps=  220 RMS= 0.55485E-02 Markov E=    -879.122415291442     t=       77.4
 Qu       2626 E=    -874.964981852565     steps=  177 RMS= 0.40341E-02 Markov E=    -879.122415291442     t=       77.4
 Qu       2627 E=    -875.116661757013     steps=  163 RMS= 0.63804E-02 Markov E=    -879.122415291442     t=       77.5
 Qu       2628 E=    -873.780828042876     steps=  153 RMS= 0.69904E-02 Markov E=    -875.116661757013     t=       77.5
 Qu       2629 E=    -846.986557318300     steps=  311 RMS= 0.65849E-02 Markov E=    -873.780828042876     t=       77.5
 Qu       2630 E=    -873.386314384670     steps=  354 RMS= 0.53885E-02 Markov E=    -873.780828042876     t=       77.6
 Qu       2631 E=    -876.425562731283     steps=  155 RMS= 0.53599E-02 Markov E=    -873.780828042876     t=       77.6
 Qu       2632 E=    -841.858895806052     steps=  296 RMS= 0.66945E-02 Markov E=    -876.425562731283     t=       77.6
 Qu       2633 E=    -872.787446020908     steps=   98 RMS= 0.59829E-02 Markov E=    -876.425562731283     t=       77.7
 Qu       2634 E=    -861.341280075817     steps=  206 RMS= 0.68680E-02 Markov E=    -876.425562731283     t=       77.7
 Qu       2635 E=    -871.684914075660     steps=  257 RMS= 0.59605E-02 Markov E=    -876.425562731283     t=       77.7
 Qu       2636 E=    -855.518024192575     steps=  449 RMS= 0.65453E-02 Markov E=    -876.425562731283     t=       77.8
 Qu       2637 E=    -874.488477181962     steps=  123 RMS= 0.58871E-02 Markov E=    -876.425562731283     t=       77.8
 Qu       2638 E=    -872.536414029361     steps=  109 RMS= 0.60234E-02 Markov E=    -876.425562731283     t=       77.8
 Qu       2639 E=    -877.129681267228     steps=  239 RMS= 0.62700E-02 Markov E=    -876.425562731283     t=       77.9
 Qu       2640 E=    -872.514309129513     steps=  258 RMS= 0.60148E-02 Markov E=    -877.129681267228     t=       77.9
 Qu       2641 E=    -876.521523598293     steps=  164 RMS= 0.58931E-02 Markov E=    -877.129681267228     t=       77.9
 Qu       2642 E=    -844.787766049093     steps=  256 RMS= 0.61489E-02 Markov E=    -876.521523598293     t=       78.0
 Qu       2643 E=    -845.950062544367     steps=  291 RMS= 0.65248E-02 Markov E=    -876.521523598293     t=       78.0
 Qu       2644 E=    -871.707910850407     steps=  208 RMS= 0.62533E-02 Markov E=    -876.521523598293     t=       78.0
 Qu       2645 E=    -874.124333022912     steps=  105 RMS= 0.47815E-02 Markov E=    -876.521523598293     t=       78.0
 Qu       2646 E=    -874.096629384245     steps=  137 RMS= 0.63627E-02 Markov E=    -876.521523598293     t=       78.1
 Qu       2647 E=    -845.299537226368     steps=  322 RMS= 0.54993E-02 Markov E=    -874.096629384245     t=       78.1
 Qu       2648 E=    -862.225972875188     steps=  493 RMS= 0.58718E-02 Markov E=    -874.096629384245     t=       78.2
 Qu       2649 E=    -843.805063992724     steps=  317 RMS= 0.63244E-02 Markov E=    -874.096629384245     t=       78.2
 Qu       2650 E=    -866.737586541490     steps=  161 RMS= 0.65179E-02 Markov E=    -874.096629384245     t=       78.2
Acceptance ratio for previous     50 steps=  0.2000  FAC=  1.0500
 Qu       2651 E=    -875.453698045819     steps=  132 RMS= 0.61785E-02 Markov E=    -874.096629384245     t=       78.3
 Qu       2652 E=    -876.744213486620     steps=  292 RMS= 0.52174E-02 Markov E=    -875.453698045819     t=       78.3
 Qu       2653 E=    -876.789219056939     steps=  127 RMS= 0.53368E-02 Markov E=    -876.744213486620     t=       78.3
 Qu       2654 E=    -848.514400648511     steps=  303 RMS= 0.66742E-02 Markov E=    -876.789219056939     t=       78.4
 Qu       2655 E=    -876.976465720729     steps=  168 RMS= 0.55689E-02 Markov E=    -876.789219056939     t=       78.4
 Qu       2656 E=    -876.387662229561     steps=  126 RMS= 0.46700E-02 Markov E=    -876.976465720729     t=       78.4
 Qu       2657 E=    -866.364846690447     steps=  483 RMS= 0.58551E-02 Markov E=    -876.976465720729     t=       78.5
 Qu       2658 E=    -874.835847535117     steps=  147 RMS= 0.67360E-02 Markov E=    -876.976465720729     t=       78.5
 Qu       2659 E=    -845.544813010538     steps=  338 RMS= 0.68871E-02 Markov E=    -876.976465720729     t=       78.5
 Qu       2660 E=    -877.199498126223     steps=  130 RMS= 0.55570E-02 Markov E=    -876.976465720729     t=       78.5
 Qu       2661 E=    -858.603570777822     steps=  112 RMS= 0.64045E-02 Markov E=    -877.199498126223     t=       78.6
 Qu       2662 E=    -876.243363453154     steps=  191 RMS= 0.51533E-02 Markov E=    -877.199498126223     t=       78.6
 Qu       2663 E=    -855.810076295719     steps=  208 RMS= 0.60491E-02 Markov E=    -877.199498126223     t=       78.6
 Qu       2664 E=    -872.901949388800     steps=  152 RMS= 0.49706E-02 Markov E=    -877.199498126223     t=       78.6
 Qu       2665 E=    -844.878000784683     steps=  282 RMS= 0.58929E-02 Markov E=    -877.199498126223     t=       78.7
 Qu       2666 E=    -869.917635932105     steps=  123 RMS= 0.64949E-02 Markov E=    -877.199498126223     t=       78.7
 Qu       2667 E=    -837.933997894776     steps=  262 RMS= 0.59766E-02 Markov E=    -877.199498126223     t=       78.7
 Qu       2668 E=    -875.630142040131     steps=  105 RMS= 0.51724E-02 Markov E=    -877.199498126223     t=       78.7
 Qu       2669 E=    -873.558171223298     steps=  200 RMS= 0.59294E-02 Markov E=    -877.199498126223     t=       78.8
 Qu       2670 E=    -852.906135574827     steps=  450 RMS= 0.69893E-02 Markov E=    -877.199498126223     t=       78.8
 Qu       2671 E=    -865.736165695298     steps=  101 RMS= 0.55843E-02 Markov E=    -877.199498126223     t=       78.8
 Qu       2672 E=    -875.357930464493     steps=  127 RMS= 0.58336E-02 Markov E=    -877.199498126223     t=       78.9
 Qu       2673 E=    -878.021030523511     steps=  222 RMS= 0.43059E-02 Markov E=    -877.199498126223     t=       78.9
 Qu       2674 E=    -850.259970848288     steps=  225 RMS= 0.53983E-02 Markov E=    -878.021030523511     t=       78.9
 Qu       2675 E=    -868.369703444579     steps=  143 RMS= 0.69059E-02 Markov E=    -878.021030523511     t=       78.9
 Qu       2676 E=    -876.656209619899     steps=   97 RMS= 0.65478E-02 Markov E=    -878.021030523511     t=       79.0
 Qu       2677 E=    -848.653657268495     steps=  338 RMS= 0.53866E-02 Markov E=    -878.021030523511     t=       79.0
 Qu       2678 E=    -877.130889197289     steps=  200 RMS= 0.54432E-02 Markov E=    -878.021030523511     t=       79.0
 Qu       2679 E=    -880.368893482696     steps=  143 RMS= 0.57835E-02 Markov E=    -877.130889197289     t=       79.1
 Qu       2680 E=    -873.748841374450     steps=  172 RMS= 0.55768E-02 Markov E=    -880.368893482696     t=       79.1
 Qu       2681 E=    -878.394922630866     steps=  103 RMS= 0.60321E-02 Markov E=    -880.368893482696     t=       79.1
 Qu       2682 E=    -875.024181885190     steps=  103 RMS= 0.51267E-02 Markov E=    -880.368893482696     t=       79.1
 Qu       2683 E=    -875.628281535529     steps=  210 RMS= 0.66165E-02 Markov E=    -880.368893482696     t=       79.1
 Qu       2684 E=    -875.289504222233     steps=  153 RMS= 0.69589E-02 Markov E=    -880.368893482696     t=       79.2
 Qu       2685 E=    -878.517999336853     steps=   93 RMS= 0.61088E-02 Markov E=    -880.368893482696     t=       79.2
 Qu       2686 E=    -878.433138235906     steps=  100 RMS= 0.42979E-02 Markov E=    -880.368893482696     t=       79.2
 Qu       2687 E=    -875.902598897955     steps=  196 RMS= 0.55824E-02 Markov E=    -880.368893482696     t=       79.2
 Qu       2688 E=    -878.072374481505     steps=   96 RMS= 0.68533E-02 Markov E=    -880.368893482696     t=       79.2
 Qu       2689 E=    -869.441921263067     steps=  353 RMS= 0.63734E-02 Markov E=    -880.368893482696     t=       79.3
 Qu       2690 E=    -846.104000553019     steps=  271 RMS= 0.50759E-02 Markov E=    -880.368893482696     t=       79.3
 Qu       2691 E=    -878.554060964846     steps=  206 RMS= 0.62056E-02 Markov E=    -880.368893482696     t=       79.3
 Qu       2692 E=    -865.045691998661     steps=  384 RMS= 0.62758E-02 Markov E=    -878.554060964846     t=       79.4
 Qu       2693 E=    -872.633773061617     steps=  233 RMS= 0.64330E-02 Markov E=    -878.554060964846     t=       79.4
 Qu       2694 E=    -877.286940555818     steps=  113 RMS= 0.51924E-02 Markov E=    -878.554060964846     t=       79.4
 Qu       2695 E=    -878.414639019261     steps=  132 RMS= 0.54219E-02 Markov E=    -878.554060964846     t=       79.5
 Qu       2696 E=    -876.547219016720     steps=  135 RMS= 0.60757E-02 Markov E=    -878.414639019261     t=       79.5
 Qu       2697 E=    -877.314888984651     steps=  199 RMS= 0.54378E-02 Markov E=    -878.414639019261     t=       79.5
 Qu       2698 E=    -872.790602662357     steps=  151 RMS= 0.54317E-02 Markov E=    -878.414639019261     t=       79.5
 Qu       2699 E=    -876.422712509711     steps=  141 RMS= 0.59247E-02 Markov E=    -878.414639019261     t=       79.6
 Qu       2700 E=    -880.488273649049     steps=  116 RMS= 0.67669E-02 Markov E=    -878.414639019261     t=       79.6
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       2701 E=    -878.515565082485     steps=  106 RMS= 0.66616E-02 Markov E=    -880.488273649049     t=       79.6
 Qu       2702 E=    -878.578014267977     steps=   85 RMS= 0.58030E-02 Markov E=    -880.488273649049     t=       79.6
 Qu       2703 E=    -864.837575244178     steps=  178 RMS= 0.63054E-02 Markov E=    -878.578014267977     t=       79.6
 Qu       2704 E=    -878.690070856404     steps=  130 RMS= 0.68754E-02 Markov E=    -878.578014267977     t=       79.6
 Qu       2705 E=    -846.297134117446     steps=  444 RMS= 0.69959E-02 Markov E=    -878.690070856404     t=       79.7
 Qu       2706 E=    -849.080032845635     steps=  184 RMS= 0.69394E-02 Markov E=    -878.690070856404     t=       79.7
 Qu       2707 E=    -846.255430705252     steps=  302 RMS= 0.65836E-02 Markov E=    -878.690070856404     t=       79.8
 Qu       2708 E=    -872.884774894166     steps=  185 RMS= 0.69083E-02 Markov E=    -878.690070856404     t=       79.8
 Qu       2709 E=    -868.493169071852     steps=  157 RMS= 0.62921E-02 Markov E=    -878.690070856404     t=       79.8
 Qu       2710 E=    -875.397144676825     steps=  150 RMS= 0.61743E-02 Markov E=    -878.690070856404     t=       79.8
 Qu       2711 E=    -875.775723193166     steps=  147 RMS= 0.62825E-02 Markov E=    -878.690070856404     t=       79.9
 Qu       2712 E=    -877.099482181183     steps=  121 RMS= 0.56039E-02 Markov E=    -878.690070856404     t=       79.9
 Qu       2713 E=    -879.208640670984     steps=  172 RMS= 0.55893E-02 Markov E=    -878.690070856404     t=       79.9
 Qu       2714 E=    -881.337527820557     steps=  130 RMS= 0.63178E-02 Markov E=    -879.208640670984     t=       79.9
 Qu       2715 E=    -864.775295940555     steps=  150 RMS= 0.60769E-02 Markov E=    -881.337527820557     t=       79.9
 Qu       2716 E=    -881.236891318423     steps=  208 RMS= 0.63251E-02 Markov E=    -881.337527820557     t=       80.0
 Qu       2717 E=    -847.656026326763     steps=  188 RMS= 0.68482E-02 Markov E=    -881.236891318423     t=       80.0
 Qu       2718 E=    -876.682738643246     steps=  105 RMS= 0.66937E-02 Markov E=    -881.236891318423     t=       80.0
 Qu       2719 E=    -877.647021167951     steps=  141 RMS= 0.51479E-02 Markov E=    -881.236891318423     t=       80.0
 Qu       2720 E=    -864.629788096748     steps=  169 RMS= 0.69907E-02 Markov E=    -881.236891318423     t=       80.1
 Qu       2721 E=    -849.383637644852     steps=  253 RMS= 0.61966E-02 Markov E=    -881.236891318423     t=       80.1
 Qu       2722 E=    -875.281240801920     steps=  143 RMS= 0.50810E-02 Markov E=    -881.236891318423     t=       80.1
 Qu       2723 E=    -873.875765066654     steps=  244 RMS= 0.68639E-02 Markov E=    -881.236891318423     t=       80.1
 Qu       2724 E=    -853.028119048246     steps=  413 RMS= 0.53065E-02 Markov E=    -881.236891318423     t=       80.2
 Qu       2725 E=    -876.232935980850     steps=  121 RMS= 0.60212E-02 Markov E=    -881.236891318423     t=       80.2
 Qu       2726 E=    -879.618502723892     steps=  262 RMS= 0.50438E-02 Markov E=    -881.236891318423     t=       80.3
 Qu       2727 E=    -874.646320255266     steps=  124 RMS= 0.63108E-02 Markov E=    -881.236891318423     t=       80.3
 Qu       2728 E=    -880.006561991340     steps=  150 RMS= 0.67623E-02 Markov E=    -881.236891318423     t=       80.3
 Qu       2729 E=    -850.736730315732     steps=  527 RMS= 0.65614E-02 Markov E=    -881.236891318423     t=       80.4
 Qu       2730 E=    -880.157132183692     steps=  119 RMS= 0.51449E-02 Markov E=    -881.236891318423     t=       80.4
 Qu       2731 E=    -874.970699852214     steps=  139 RMS= 0.64942E-02 Markov E=    -881.236891318423     t=       80.4
 Qu       2732 E=    -880.860851852217     steps=  141 RMS= 0.66741E-02 Markov E=    -881.236891318423     t=       80.4
 Qu       2733 E=    -862.838139377554     steps=  274 RMS= 0.67983E-02 Markov E=    -881.236891318423     t=       80.5
 Qu       2734 E=    -879.102045919701     steps=   89 RMS= 0.56541E-02 Markov E=    -881.236891318423     t=       80.5
 Qu       2735 E=    -841.182646107285     steps=  361 RMS= 0.68238E-02 Markov E=    -881.236891318423     t=       80.5
 Qu       2736 E=    -881.216492942919     steps=   97 RMS= 0.58835E-02 Markov E=    -881.236891318423     t=       80.5
 Qu       2737 E=    -875.405792577683     steps=  157 RMS= 0.62554E-02 Markov E=    -881.216492942919     t=       80.6
 Qu       2738 E=    -863.569492725722     steps=  185 RMS= 0.69066E-02 Markov E=    -881.216492942919     t=       80.6
 Qu       2739 E=    -880.655443411933     steps=   84 RMS= 0.58793E-02 Markov E=    -881.216492942919     t=       80.6
 Qu       2740 E=    -877.444850500982     steps=  125 RMS= 0.66870E-02 Markov E=    -880.655443411933     t=       80.6
 Qu       2741 E=    -874.288836579527     steps=  305 RMS= 0.64625E-02 Markov E=    -880.655443411933     t=       80.7
 Qu       2742 E=    -847.198161800856     steps=  283 RMS= 0.54949E-02 Markov E=    -880.655443411933     t=       80.7
 Qu       2743 E=    -876.213105113332     steps=  181 RMS= 0.69782E-02 Markov E=    -880.655443411933     t=       80.7
 Qu       2744 E=    -869.196537157121     steps=  183 RMS= 0.62711E-02 Markov E=    -880.655443411933     t=       80.7
 Qu       2745 E=    -876.217244179280     steps=  112 RMS= 0.67331E-02 Markov E=    -880.655443411933     t=       80.8
 Qu       2746 E=    -880.170354845121     steps=  143 RMS= 0.55329E-02 Markov E=    -880.655443411933     t=       80.8
 Qu       2747 E=    -880.158660456866     steps=  121 RMS= 0.67009E-02 Markov E=    -880.655443411933     t=       80.8
 Qu       2748 E=    -876.229493676538     steps=  147 RMS= 0.66333E-02 Markov E=    -880.158660456866     t=       80.8
 Qu       2749 E=    -880.158589468746     steps=  105 RMS= 0.63524E-02 Markov E=    -880.158660456866     t=       80.8
 Qu       2750 E=    -853.771172872257     steps=  347 RMS= 0.66569E-02 Markov E=    -880.158589468746     t=       80.9
Acceptance ratio for previous     50 steps=  0.1800  FAC=  1.0500
 Qu       2751 E=    -880.248567927140     steps=  114 RMS= 0.64851E-02 Markov E=    -880.158589468746     t=       80.9
 Qu       2752 E=    -881.216549010938     steps=  119 RMS= 0.65726E-02 Markov E=    -880.248567927140     t=       80.9
 Qu       2753 E=    -880.711358144456     steps=  138 RMS= 0.69954E-02 Markov E=    -881.216549010938     t=       80.9
 Qu       2754 E=    -878.539899929789     steps=  121 RMS= 0.38750E-02 Markov E=    -881.216549010938     t=       81.0
 Qu       2755 E=    -877.269260961691     steps=  215 RMS= 0.67144E-02 Markov E=    -878.539899929789     t=       81.0
 Qu       2756 E=    -875.852857947224     steps=  114 RMS= 0.54915E-02 Markov E=    -878.539899929789     t=       81.0
 Qu       2757 E=    -875.399126761390     steps=  176 RMS= 0.48808E-02 Markov E=    -878.539899929789     t=       81.0
 Qu       2758 E=    -867.547861067256     steps=  135 RMS= 0.58227E-02 Markov E=    -875.399126761390     t=       81.0
 Qu       2759 E=    -858.590710610977     steps=  261 RMS= 0.57524E-02 Markov E=    -875.399126761390     t=       81.1
 Qu       2760 E=    -847.220625541024     steps=  262 RMS= 0.60798E-02 Markov E=    -875.399126761390     t=       81.1
 Qu       2761 E=    -871.735471741821     steps=  110 RMS= 0.49062E-02 Markov E=    -875.399126761390     t=       81.1
 Qu       2762 E=    -876.069736553111     steps=   96 RMS= 0.55420E-02 Markov E=    -875.399126761390     t=       81.1
 Qu       2763 E=    -875.667902264222     steps=  123 RMS= 0.45666E-02 Markov E=    -876.069736553111     t=       81.2
 Qu       2764 E=    -875.899619777184     steps=  132 RMS= 0.49620E-02 Markov E=    -876.069736553111     t=       81.2
 Qu       2765 E=    -846.426737914317     steps=  269 RMS= 0.65573E-02 Markov E=    -875.899619777184     t=       81.2
 Qu       2766 E=    -869.646491346627     steps=  263 RMS= 0.63706E-02 Markov E=    -875.899619777184     t=       81.3
 Qu       2767 E=    -879.632810311488     steps=  123 RMS= 0.60001E-02 Markov E=    -875.899619777184     t=       81.3
newres> Moving current best minimum to position      1 in the AVOID list E=    -882.9006749    
newres> Energy has not improved since step     1266 - reseeding
newres> Parallel run      1 has the highest energy      -882.9006748982
newres> Full reseeding
 Qu       2768 E=    -840.882071044529     steps=  236 RMS= 0.69920E-02 Markov E=    -842.243927001861     t=       81.4
 Qu       2769 E=    -846.654138126893     steps=  314 RMS= 0.69747E-02 Markov E=    -842.243927001861     t=       81.4
 Qu       2770 E=    -843.392686654810     steps=  263 RMS= 0.69691E-02 Markov E=    -846.654138126893     t=       81.5
 Qu       2771 E=    -844.951433235714     steps=  421 RMS= 0.68734E-02 Markov E=    -846.654138126893     t=       81.5
 Qu       2772 E=    -845.042833360019     steps=  221 RMS= 0.64596E-02 Markov E=    -844.951433235714     t=       81.5
 Qu       2773 E=    -846.617299257921     steps=  379 RMS= 0.62774E-02 Markov E=    -845.042833360019     t=       81.6
 Qu       2774 E=    -855.849050460769     steps=  363 RMS= 0.57653E-02 Markov E=    -846.617299257921     t=       81.6
 Qu       2775 E=    -865.317143279104     steps=  353 RMS= 0.51670E-02 Markov E=    -855.849050460769     t=       81.7
 Qu       2776 E=    -864.339985196924     steps=  121 RMS= 0.69501E-02 Markov E=    -865.317143279104     t=       81.7
 Qu       2777 E=    -861.803444898984     steps=  170 RMS= 0.69392E-02 Markov E=    -864.339985196924     t=       81.7
 Qu       2778 E=    -857.756581142321     steps=  219 RMS= 0.50127E-02 Markov E=    -864.339985196924     t=       81.8
 Qu       2779 E=    -866.822375216812     steps=  230 RMS= 0.62577E-02 Markov E=    -864.339985196924     t=       81.8
 Qu       2780 E=    -854.658472493178     steps=  275 RMS= 0.65282E-02 Markov E=    -866.822375216812     t=       81.8
 Qu       2781 E=    -864.457717818272     steps=  149 RMS= 0.42307E-02 Markov E=    -866.822375216812     t=       81.9
 Qu       2782 E=    -867.077832921207     steps=  123 RMS= 0.59317E-02 Markov E=    -866.822375216812     t=       81.9
 Qu       2783 E=    -840.717542179306     steps=  339 RMS= 0.69623E-02 Markov E=    -867.077832921207     t=       81.9
 Qu       2784 E=    -867.499096145398     steps=  163 RMS= 0.54967E-02 Markov E=    -867.077832921207     t=       81.9
 Qu       2785 E=    -869.691072786622     steps=  254 RMS= 0.68645E-02 Markov E=    -867.499096145398     t=       82.0
 Qu       2786 E=    -874.352594200089     steps=  146 RMS= 0.60055E-02 Markov E=    -869.691072786622     t=       82.0
 Qu       2787 E=    -845.005161558622     steps=  233 RMS= 0.66917E-02 Markov E=    -874.352594200089     t=       82.0
 Qu       2788 E=    -869.125500998540     steps=  218 RMS= 0.68639E-02 Markov E=    -874.352594200089     t=       82.1
 Qu       2789 E=    -872.666144643318     steps=  227 RMS= 0.69209E-02 Markov E=    -874.352594200089     t=       82.1
 Qu       2790 E=    -861.902505873817     steps=  167 RMS= 0.40422E-02 Markov E=    -874.352594200089     t=       82.1
 Qu       2791 E=    -874.275151375725     steps=  160 RMS= 0.63704E-02 Markov E=    -874.352594200089     t=       82.1
 Qu       2792 E=    -850.389967187561     steps=  255 RMS= 0.50373E-02 Markov E=    -874.275151375725     t=       82.2
 Qu       2793 E=    -869.722988376641     steps=  367 RMS= 0.64297E-02 Markov E=    -874.275151375725     t=       82.2
 Qu       2794 E=    -868.988841265018     steps=  362 RMS= 0.54662E-02 Markov E=    -874.275151375725     t=       82.3
 Qu       2795 E=    -844.113976088160     steps=  318 RMS= 0.64753E-02 Markov E=    -874.275151375725     t=       82.3
 Qu       2796 E=    -871.286391575601     steps=  212 RMS= 0.68118E-02 Markov E=    -874.275151375725     t=       82.4
 Qu       2797 E=    -873.426702300753     steps=  158 RMS= 0.55842E-02 Markov E=    -874.275151375725     t=       82.4
 Qu       2798 E=    -872.421287065822     steps=  239 RMS= 0.63072E-02 Markov E=    -873.426702300753     t=       82.4
 Qu       2799 E=    -869.667571703971     steps=  177 RMS= 0.59145E-02 Markov E=    -872.421287065822     t=       82.4
 Qu       2800 E=    -866.353823888648     steps=  246 RMS= 0.67442E-02 Markov E=    -872.421287065822     t=       82.5
Acceptance ratio for previous     50 steps=  0.4706  FAC=  1.0500
 Qu       2801 E=    -874.324793898032     steps=  532 RMS= 0.66519E-02 Markov E=    -872.421287065822     t=       82.5
 Qu       2802 E=    -861.632210022584     steps=  324 RMS= 0.61106E-02 Markov E=    -874.324793898032     t=       82.6
 Qu       2803 E=    -842.182207254789     steps=  405 RMS= 0.69322E-02 Markov E=    -874.324793898032     t=       82.6
 Qu       2804 E=    -854.207306264423     steps=  282 RMS= 0.64719E-02 Markov E=    -874.324793898032     t=       82.7
 Qu       2805 E=    -840.496586075374     steps=  249 RMS= 0.57867E-02 Markov E=    -874.324793898032     t=       82.7
 Qu       2806 E=    -866.114678160121     steps=  125 RMS= 0.41881E-02 Markov E=    -874.324793898032     t=       82.7
 Qu       2807 E=    -837.373735312884     steps=  181 RMS= 0.67919E-02 Markov E=    -874.324793898032     t=       82.8
 Qu       2808 E=    -872.156906824562     steps=  152 RMS= 0.67307E-02 Markov E=    -874.324793898032     t=       82.8
 Qu       2809 E=    -873.222341387454     steps=  161 RMS= 0.62610E-02 Markov E=    -874.324793898032     t=       82.8
 Qu       2810 E=    -843.693029986448     steps=  189 RMS= 0.57597E-02 Markov E=    -874.324793898032     t=       82.8
 Qu       2811 E=    -862.095397629347     steps=  144 RMS= 0.57118E-02 Markov E=    -874.324793898032     t=       82.8
 Qu       2812 E=    -846.241825413131     steps=  288 RMS= 0.56966E-02 Markov E=    -874.324793898032     t=       82.9
 Qu       2813 E=    -871.901048440454     steps=  219 RMS= 0.62111E-02 Markov E=    -874.324793898032     t=       82.9
 Qu       2814 E=    -871.905915353475     steps=  187 RMS= 0.56011E-02 Markov E=    -874.324793898032     t=       82.9
 Qu       2815 E=    -848.010000113109     steps=  315 RMS= 0.64490E-02 Markov E=    -874.324793898032     t=       83.0
 Qu       2816 E=    -845.675029978090     steps=  347 RMS= 0.66165E-02 Markov E=    -874.324793898032     t=       83.0
 Qu       2817 E=    -869.318614612753     steps=  217 RMS= 0.49394E-02 Markov E=    -874.324793898032     t=       83.1
 Qu       2818 E=    -869.280715013568     steps=  127 RMS= 0.48446E-02 Markov E=    -874.324793898032     t=       83.1
 Qu       2819 E=    -869.884722955870     steps=  128 RMS= 0.66781E-02 Markov E=    -874.324793898032     t=       83.1
 Qu       2820 E=    -850.424682326739     steps=  209 RMS= 0.60705E-02 Markov E=    -874.324793898032     t=       83.1
 Qu       2821 E=    -846.468019565187     steps=  393 RMS= 0.69461E-02 Markov E=    -874.324793898032     t=       83.2
 Qu       2822 E=    -838.214434702543     steps=  274 RMS= 0.55851E-02 Markov E=    -874.324793898032     t=       83.2
 Qu       2823 E=    -842.605867003534     steps=  263 RMS= 0.62201E-02 Markov E=    -874.324793898032     t=       83.3
 Qu       2824 E=    -871.640734975676     steps=  181 RMS= 0.69828E-02 Markov E=    -874.324793898032     t=       83.3
 Qu       2825 E=    -847.874357410101     steps=  216 RMS= 0.53660E-02 Markov E=    -874.324793898032     t=       83.3
 Qu       2826 E=    -863.664562279629     steps=  141 RMS= 0.62482E-02 Markov E=    -874.324793898032     t=       83.3
 Qu       2827 E=    -842.571286370512     steps=  272 RMS= 0.68360E-02 Markov E=    -874.324793898032     t=       83.4
 Qu       2828 E=    -870.496181842239     steps=  190 RMS= 0.60964E-02 Markov E=    -874.324793898032     t=       83.4
 Qu       2829 E=    -868.324663660419     steps=  210 RMS= 0.66658E-02 Markov E=    -874.324793898032     t=       83.4
 Qu       2830 E=    -866.306638763566     steps=  110 RMS= 0.60939E-02 Markov E=    -874.324793898032     t=       83.4
 Qu       2831 E=    -849.765036113330     steps=  256 RMS= 0.55641E-02 Markov E=    -874.324793898032     t=       83.5
 Qu       2832 E=    -834.815229807834     steps=  183 RMS= 0.65551E-02 Markov E=    -874.324793898032     t=       83.5
 Qu       2833 E=    -869.763860650502     steps=  314 RMS= 0.59078E-02 Markov E=    -874.324793898032     t=       83.6
 Qu       2834 E=    -845.293054334482     steps=  306 RMS= 0.61724E-02 Markov E=    -874.324793898032     t=       83.6
 Qu       2835 E=    -868.628521708489     steps=  136 RMS= 0.52034E-02 Markov E=    -874.324793898032     t=       83.6
 Qu       2836 E=    -869.660427764030     steps=  166 RMS= 0.64405E-02 Markov E=    -874.324793898032     t=       83.6
 Qu       2837 E=    -869.750306603861     steps=  103 RMS= 0.59444E-02 Markov E=    -874.324793898032     t=       83.7
 Qu       2838 E=    -870.046244427372     steps=  171 RMS= 0.62471E-02 Markov E=    -874.324793898032     t=       83.7
 Qu       2839 E=    -869.340579551676     steps=   98 RMS= 0.66997E-02 Markov E=    -874.324793898032     t=       83.7
 Qu       2840 E=    -862.392782149240     steps=  164 RMS= 0.62738E-02 Markov E=    -874.324793898032     t=       83.7
 Qu       2841 E=    -869.096553044421     steps=  173 RMS= 0.64806E-02 Markov E=    -874.324793898032     t=       83.7
 Qu       2842 E=    -855.181961593145     steps=  154 RMS= 0.65695E-02 Markov E=    -874.324793898032     t=       83.8
 Qu       2843 E=    -872.287006047901     steps=  106 RMS= 0.69392E-02 Markov E=    -874.324793898032     t=       83.8
 Qu       2844 E=    -872.188367669580     steps=  178 RMS= 0.55988E-02 Markov E=    -872.287006047901     t=       83.8
 Qu       2845 E=    -868.680350788420     steps=  208 RMS= 0.60450E-02 Markov E=    -872.188367669580     t=       83.8
 Qu       2846 E=    -862.215250357094     steps=  227 RMS= 0.66514E-02 Markov E=    -872.188367669580     t=       83.9
 Qu       2847 E=    -858.018927488941     steps=  307 RMS= 0.55847E-02 Markov E=    -872.188367669580     t=       83.9
 Qu       2848 E=    -847.696516199267     steps=  450 RMS= 0.69829E-02 Markov E=    -872.188367669580     t=       84.0
 Qu       2849 E=    -870.931906498368     steps=  136 RMS= 0.69861E-02 Markov E=    -872.188367669580     t=       84.0
 Qu       2850 E=    -849.737413461272     steps=  882 RMS= 0.62531E-02 Markov E=    -872.188367669580     t=       84.1
Acceptance ratio for previous     50 steps=  0.0600  FAC=  1.0500
 Qu       2851 E=    -872.801502991685     steps=  130 RMS= 0.63334E-02 Markov E=    -872.188367669580     t=       84.1
 Qu       2852 E=    -869.078736187111     steps=  179 RMS= 0.69282E-02 Markov E=    -872.801502991685     t=       84.1
 Qu       2853 E=    -868.118568486801     steps=  135 RMS= 0.66989E-02 Markov E=    -872.801502991685     t=       84.2
 Qu       2854 E=    -870.338298346308     steps=  115 RMS= 0.49980E-02 Markov E=    -872.801502991685     t=       84.2
 Qu       2855 E=    -846.742905798090     steps=  418 RMS= 0.53116E-02 Markov E=    -872.801502991685     t=       84.2
 Qu       2856 E=    -865.047687015396     steps=  300 RMS= 0.59361E-02 Markov E=    -872.801502991685     t=       84.3
 Qu       2857 E=    -871.937333115672     steps=  137 RMS= 0.51324E-02 Markov E=    -872.801502991685     t=       84.3
 Qu       2858 E=    -851.220572287834     steps=  474 RMS= 0.61797E-02 Markov E=    -872.801502991685     t=       84.4
 Qu       2859 E=    -868.620490496033     steps=  227 RMS= 0.69384E-02 Markov E=    -872.801502991685     t=       84.4
 Qu       2860 E=    -872.584657663142     steps=  119 RMS= 0.69916E-02 Markov E=    -872.801502991685     t=       84.4
 Qu       2861 E=    -869.744513211177     steps=  233 RMS= 0.64373E-02 Markov E=    -872.584657663142     t=       84.5
 Qu       2862 E=    -846.967883411899     steps=  260 RMS= 0.62742E-02 Markov E=    -872.584657663142     t=       84.5
 Qu       2863 E=    -843.662685163224     steps=  253 RMS= 0.51518E-02 Markov E=    -872.584657663142     t=       84.5
 Qu       2864 E=    -871.302510673737     steps=  109 RMS= 0.52730E-02 Markov E=    -872.584657663142     t=       84.5
 Qu       2865 E=    -872.492871823352     steps=  149 RMS= 0.68388E-02 Markov E=    -871.302510673737     t=       84.6
 Qu       2866 E=    -873.485622187111     steps=  133 RMS= 0.64089E-02 Markov E=    -872.492871823352     t=       84.6
 Qu       2867 E=    -846.644444093336     steps=  234 RMS= 0.62732E-02 Markov E=    -873.485622187111     t=       84.6
 Qu       2868 E=    -868.283443701588     steps=  215 RMS= 0.55803E-02 Markov E=    -873.485622187111     t=       84.6
 Qu       2869 E=    -843.971305915273     steps=  345 RMS= 0.61892E-02 Markov E=    -873.485622187111     t=       84.7
 Qu       2870 E=    -871.042568017149     steps=  146 RMS= 0.62631E-02 Markov E=    -873.485622187111     t=       84.7
 Qu       2871 E=    -869.847696881256     steps=  253 RMS= 0.58890E-02 Markov E=    -871.042568017149     t=       84.7
 Qu       2872 E=    -871.679545102090     steps=  125 RMS= 0.51796E-02 Markov E=    -869.847696881256     t=       84.8
 Qu       2873 E=    -867.411951061820     steps=  140 RMS= 0.63412E-02 Markov E=    -871.679545102090     t=       84.8
 Qu       2874 E=    -843.685123055671     steps=  323 RMS= 0.54726E-02 Markov E=    -871.679545102090     t=       84.8
 Qu       2875 E=    -871.853692152850     steps=  154 RMS= 0.63259E-02 Markov E=    -871.679545102090     t=       84.9
 Qu       2876 E=    -858.224874123920     steps=  164 RMS= 0.59139E-02 Markov E=    -871.853692152850     t=       84.9
 Qu       2877 E=    -843.435936666057     steps=  285 RMS= 0.61667E-02 Markov E=    -871.853692152850     t=       84.9
 Qu       2878 E=    -871.990942428979     steps=  109 RMS= 0.47415E-02 Markov E=    -871.853692152850     t=       84.9
 Qu       2879 E=    -850.044069018496     steps=  689 RMS= 0.58772E-02 Markov E=    -871.990942428979     t=       85.0
 Qu       2880 E=    -861.589828261482     steps=  181 RMS= 0.69854E-02 Markov E=    -871.990942428979     t=       85.1
 Qu       2881 E=    -870.818679978044     steps=  129 RMS= 0.64991E-02 Markov E=    -871.990942428979     t=       85.1
 Qu       2882 E=    -837.247620226055     steps=  252 RMS= 0.65312E-02 Markov E=    -871.990942428979     t=       85.1
 Qu       2883 E=    -871.967837461900     steps=   98 RMS= 0.63830E-02 Markov E=    -871.990942428979     t=       85.1
 Qu       2884 E=    -866.370839727409     steps=  143 RMS= 0.60913E-02 Markov E=    -871.967837461900     t=       85.1
 Qu       2885 E=    -874.110182681353     steps=  110 RMS= 0.69512E-02 Markov E=    -871.967837461900     t=       85.2
 Qu       2886 E=    -861.761357741943     steps=  248 RMS= 0.59650E-02 Markov E=    -874.110182681353     t=       85.2
 Qu       2887 E=    -874.113133861163     steps=  145 RMS= 0.59577E-02 Markov E=    -874.110182681353     t=       85.2
 Qu       2888 E=    -863.637016113757     steps=  136 RMS= 0.55670E-02 Markov E=    -874.113133861163     t=       85.2
 Qu       2889 E=    -869.575387309236     steps=  145 RMS= 0.61765E-02 Markov E=    -874.113133861163     t=       85.3
 Qu       2890 E=    -845.834593148793     steps=  310 RMS= 0.66711E-02 Markov E=    -874.113133861163     t=       85.3
 Qu       2891 E=    -836.665292429622     steps=  242 RMS= 0.55300E-02 Markov E=    -874.113133861163     t=       85.3
 Qu       2892 E=    -866.340553431646     steps=  355 RMS= 0.65078E-02 Markov E=    -874.113133861163     t=       85.4
 Qu       2893 E=    -873.256485923832     steps=  103 RMS= 0.44429E-02 Markov E=    -874.113133861163     t=       85.4
 Qu       2894 E=    -870.046341628575     steps=  111 RMS= 0.56492E-02 Markov E=    -873.256485923832     t=       85.4
 Qu       2895 E=    -874.992281525193     steps=  159 RMS= 0.62455E-02 Markov E=    -873.256485923832     t=       85.4
 Qu       2896 E=    -868.381641375152     steps=  120 RMS= 0.56931E-02 Markov E=    -874.992281525193     t=       85.4
 Qu       2897 E=    -862.054319109379     steps=  263 RMS= 0.63493E-02 Markov E=    -874.992281525193     t=       85.5
 Qu       2898 E=    -847.264653666481     steps=  359 RMS= 0.66623E-02 Markov E=    -874.992281525193     t=       85.5
 Qu       2899 E=    -870.981909611966     steps=  180 RMS= 0.55309E-02 Markov E=    -874.992281525193     t=       85.6
 Qu       2900 E=    -840.443820530263     steps=  195 RMS= 0.57436E-02 Markov E=    -874.992281525193     t=       85.6
Acceptance ratio for previous     50 steps=  0.3000  FAC=  1.0500
 Qu       2901 E=    -862.256013512687     steps=  257 RMS= 0.56144E-02 Markov E=    -874.992281525193     t=       85.6
 Qu       2902 E=    -870.214860500644     steps=  146 RMS= 0.56145E-02 Markov E=    -874.992281525193     t=       85.6
 Qu       2903 E=    -854.655355313915     steps=  268 RMS= 0.65399E-02 Markov E=    -874.992281525193     t=       85.7
 Qu       2904 E=    -870.495855718374     steps=  139 RMS= 0.64722E-02 Markov E=    -874.992281525193     t=       85.7
 Qu       2905 E=    -842.126003492537     steps=  559 RMS= 0.64235E-02 Markov E=    -874.992281525193     t=       85.8
 Qu       2906 E=    -840.357556899750     steps=  322 RMS= 0.53430E-02 Markov E=    -874.992281525193     t=       85.8
 Qu       2907 E=    -850.086051617435     steps=  306 RMS= 0.56751E-02 Markov E=    -874.992281525193     t=       85.9
 Qu       2908 E=    -843.910673681520     steps=  314 RMS= 0.61551E-02 Markov E=    -874.992281525193     t=       85.9
 Qu       2909 E=    -842.615915200757     steps=  267 RMS= 0.60970E-02 Markov E=    -874.992281525193     t=       85.9
 Qu       2910 E=    -844.934799920473     steps=  340 RMS= 0.68847E-02 Markov E=    -874.992281525193     t=       86.0
 Qu       2911 E=    -855.789043088192     steps=  211 RMS= 0.65520E-02 Markov E=    -874.992281525193     t=       86.0
 Qu       2912 E=    -873.828420301548     steps=  101 RMS= 0.53348E-02 Markov E=    -874.992281525193     t=       86.0
 Qu       2913 E=    -873.099909189049     steps=  104 RMS= 0.57166E-02 Markov E=    -873.828420301548     t=       86.0
 Qu       2914 E=    -865.221251223840     steps=  171 RMS= 0.66705E-02 Markov E=    -873.099909189049     t=       86.1
 Qu       2915 E=    -871.706257461402     steps=  127 RMS= 0.55092E-02 Markov E=    -873.099909189049     t=       86.1
 Qu       2916 E=    -872.206756538901     steps=  170 RMS= 0.63577E-02 Markov E=    -873.099909189049     t=       86.1
 Qu       2917 E=    -874.992400975736     steps=   99 RMS= 0.51304E-02 Markov E=    -873.099909189049     t=       86.1
 Qu       2918 E=    -873.867105854319     steps=  104 RMS= 0.47640E-02 Markov E=    -874.992400975736     t=       86.1
 Qu       2919 E=    -840.314866069079     steps=  310 RMS= 0.69324E-02 Markov E=    -874.992400975736     t=       86.2
 Qu       2920 E=    -871.977995738230     steps=  140 RMS= 0.39839E-02 Markov E=    -874.992400975736     t=       86.2
 Qu       2921 E=    -868.247618714949     steps=  278 RMS= 0.56606E-02 Markov E=    -874.992400975736     t=       86.2
 Qu       2922 E=    -845.754696871092     steps=  346 RMS= 0.54698E-02 Markov E=    -874.992400975736     t=       86.3
 Qu       2923 E=    -839.066342536121     steps=  278 RMS= 0.60335E-02 Markov E=    -874.992400975736     t=       86.3
 Qu       2924 E=    -870.457452669715     steps=  129 RMS= 0.43120E-02 Markov E=    -874.992400975736     t=       86.3
 Qu       2925 E=    -864.254864066085     steps=  480 RMS= 0.56715E-02 Markov E=    -874.992400975736     t=       86.4
 Qu       2926 E=    -873.019095258548     steps=  236 RMS= 0.67421E-02 Markov E=    -874.992400975736     t=       86.4
 Qu       2927 E=    -865.891218922750     steps=  107 RMS= 0.66313E-02 Markov E=    -874.992400975736     t=       86.5
 Qu       2928 E=    -867.797823853528     steps=  129 RMS= 0.50186E-02 Markov E=    -874.992400975736     t=       86.5
 Qu       2929 E=    -844.858896174659     steps=  442 RMS= 0.48569E-02 Markov E=    -874.992400975736     t=       86.5
 Qu       2930 E=    -836.283298104041     steps=  345 RMS= 0.56862E-02 Markov E=    -874.992400975736     t=       86.6
 Qu       2931 E=    -860.173037353225     steps=  213 RMS= 0.65409E-02 Markov E=    -874.992400975736     t=       86.6
 Qu       2932 E=    -851.310581416713     steps=  253 RMS= 0.69775E-02 Markov E=    -874.992400975736     t=       86.7
 Qu       2933 E=    -872.160146599055     steps=  109 RMS= 0.56872E-02 Markov E=    -874.992400975736     t=       86.7
 Qu       2934 E=    -871.254397904268     steps=  242 RMS= 0.65437E-02 Markov E=    -874.992400975736     t=       86.7
 Qu       2935 E=    -874.180988694547     steps=  125 RMS= 0.58236E-02 Markov E=    -874.992400975736     t=       86.7
 Qu       2936 E=    -844.977793087725     steps=  282 RMS= 0.61500E-02 Markov E=    -874.992400975736     t=       86.8
 Qu       2937 E=    -869.587397435571     steps=  238 RMS= 0.67642E-02 Markov E=    -874.992400975736     t=       86.8
 Qu       2938 E=    -869.902664713109     steps=  212 RMS= 0.63765E-02 Markov E=    -874.992400975736     t=       86.8
 Qu       2939 E=    -872.223503229238     steps=  167 RMS= 0.55740E-02 Markov E=    -874.992400975736     t=       86.8
 Qu       2940 E=    -872.294903338295     steps=  199 RMS= 0.67665E-02 Markov E=    -874.992400975736     t=       86.9
 Qu       2941 E=    -867.056147507027     steps=  110 RMS= 0.61491E-02 Markov E=    -874.992400975736     t=       86.9
 Qu       2942 E=    -872.950589174177     steps=  105 RMS= 0.57089E-02 Markov E=    -874.992400975736     t=       86.9
 Qu       2943 E=    -870.692240601285     steps=  164 RMS= 0.56255E-02 Markov E=    -874.992400975736     t=       86.9
 Qu       2944 E=    -847.287981783290     steps=  569 RMS= 0.63132E-02 Markov E=    -874.992400975736     t=       87.0
 Qu       2945 E=    -854.263317752408     steps=  519 RMS= 0.61014E-02 Markov E=    -874.992400975736     t=       87.1
 Qu       2946 E=    -846.491434814875     steps=  568 RMS= 0.55224E-02 Markov E=    -874.992400975736     t=       87.2
 Qu       2947 E=    -872.945008160384     steps=  134 RMS= 0.56117E-02 Markov E=    -874.992400975736     t=       87.2
 Qu       2948 E=    -847.407442518321     steps=  344 RMS= 0.57934E-02 Markov E=    -874.992400975736     t=       87.2
 Qu       2949 E=    -841.285882507526     steps=  270 RMS= 0.53286E-02 Markov E=    -874.992400975736     t=       87.3
 Qu       2950 E=    -846.337923085557     steps=  301 RMS= 0.65374E-02 Markov E=    -874.992400975736     t=       87.3
Acceptance ratio for previous     50 steps=  0.0600  FAC=  1.0500
 Qu       2951 E=    -848.116952830292     steps=  257 RMS= 0.69465E-02 Markov E=    -874.992400975736     t=       87.3
 Qu       2952 E=    -872.743439505648     steps=  123 RMS= 0.62966E-02 Markov E=    -874.992400975736     t=       87.4
 Qu       2953 E=    -848.335954784404     steps=  228 RMS= 0.56824E-02 Markov E=    -874.992400975736     t=       87.4
 Qu       2954 E=    -865.685912692987     steps=  215 RMS= 0.64537E-02 Markov E=    -874.992400975736     t=       87.4
 Qu       2955 E=    -875.616048141279     steps=  136 RMS= 0.51232E-02 Markov E=    -874.992400975736     t=       87.4
 Qu       2956 E=    -841.731550076491     steps=  276 RMS= 0.67853E-02 Markov E=    -875.616048141279     t=       87.5
 Qu       2957 E=    -874.592422679072     steps=  145 RMS= 0.68816E-02 Markov E=    -875.616048141279     t=       87.5
 Qu       2958 E=    -868.658471201820     steps=  132 RMS= 0.63488E-02 Markov E=    -874.592422679072     t=       87.5
 Qu       2959 E=    -848.975453402596     steps=  360 RMS= 0.65857E-02 Markov E=    -874.592422679072     t=       87.6
 Qu       2960 E=    -861.358867250557     steps=  277 RMS= 0.64331E-02 Markov E=    -874.592422679072     t=       87.6
 Qu       2961 E=    -864.578869034981     steps=  216 RMS= 0.51705E-02 Markov E=    -874.592422679072     t=       87.6
 Qu       2962 E=    -847.682798317736     steps=  280 RMS= 0.61664E-02 Markov E=    -874.592422679072     t=       87.7
 Qu       2963 E=    -866.281975413069     steps=  304 RMS= 0.66653E-02 Markov E=    -874.592422679072     t=       87.7
 Qu       2964 E=    -869.436816468018     steps=  231 RMS= 0.63472E-02 Markov E=    -874.592422679072     t=       87.8
 Qu       2965 E=    -867.523097925633     steps=  126 RMS= 0.67667E-02 Markov E=    -874.592422679072     t=       87.8
 Qu       2966 E=    -871.046105055042     steps=  214 RMS= 0.66647E-02 Markov E=    -874.592422679072     t=       87.8
 Qu       2967 E=    -873.692585961514     steps=  130 RMS= 0.69982E-02 Markov E=    -874.592422679072     t=       87.8
 Qu       2968 E=    -844.732036836931     steps=  422 RMS= 0.64846E-02 Markov E=    -874.592422679072     t=       87.9
 Qu       2969 E=    -874.362009616485     steps=  355 RMS= 0.57952E-02 Markov E=    -874.592422679072     t=       87.9
 Qu       2970 E=    -874.719560286940     steps=  290 RMS= 0.67512E-02 Markov E=    -874.592422679072     t=       88.0
 Qu       2971 E=    -868.549500315475     steps=  197 RMS= 0.61912E-02 Markov E=    -874.719560286940     t=       88.0
 Qu       2972 E=    -864.527775348666     steps=  325 RMS= 0.63863E-02 Markov E=    -874.719560286940     t=       88.0
 Qu       2973 E=    -870.051995469523     steps=  175 RMS= 0.68969E-02 Markov E=    -874.719560286940     t=       88.1
 Qu       2974 E=    -842.956021879332     steps=  367 RMS= 0.59100E-02 Markov E=    -874.719560286940     t=       88.1
 Qu       2975 E=    -856.434847406982     steps=  290 RMS= 0.66433E-02 Markov E=    -874.719560286940     t=       88.2
 Qu       2976 E=    -871.185984486866     steps=  173 RMS= 0.57141E-02 Markov E=    -874.719560286940     t=       88.2
 Qu       2977 E=    -874.720209034629     steps=  128 RMS= 0.61537E-02 Markov E=    -874.719560286940     t=       88.2
 Qu       2978 E=    -871.198997213391     steps=  163 RMS= 0.60742E-02 Markov E=    -874.720209034629     t=       88.2
 Qu       2979 E=    -856.244506797341     steps=  249 RMS= 0.57353E-02 Markov E=    -874.720209034629     t=       88.3
 Qu       2980 E=    -871.667600443106     steps=  102 RMS= 0.51445E-02 Markov E=    -874.720209034629     t=       88.3
 Qu       2981 E=    -873.978350625187     steps=  233 RMS= 0.54726E-02 Markov E=    -874.720209034629     t=       88.3
 Qu       2982 E=    -870.402518077140     steps=  119 RMS= 0.59938E-02 Markov E=    -874.720209034629     t=       88.3
 Qu       2983 E=    -836.096486486373     steps=  290 RMS= 0.60448E-02 Markov E=    -874.720209034629     t=       88.4
 Qu       2984 E=    -873.435598785163     steps=  111 RMS= 0.65429E-02 Markov E=    -874.720209034629     t=       88.4
 Qu       2985 E=    -857.423017236036     steps=  286 RMS= 0.53863E-02 Markov E=    -874.720209034629     t=       88.4
 Qu       2986 E=    -870.542469179226     steps=  134 RMS= 0.65554E-02 Markov E=    -874.720209034629     t=       88.4
 Qu       2987 E=    -864.303506138020     steps=  238 RMS= 0.61287E-02 Markov E=    -874.720209034629     t=       88.5
 Qu       2988 E=    -855.988051881917     steps=  416 RMS= 0.55039E-02 Markov E=    -874.720209034629     t=       88.5
 Qu       2989 E=    -873.677867672946     steps=  124 RMS= 0.51211E-02 Markov E=    -874.720209034629     t=       88.5
 Qu       2990 E=    -868.438542699181     steps=  222 RMS= 0.64489E-02 Markov E=    -873.677867672946     t=       88.6
 Qu       2991 E=    -871.987961266856     steps=  127 RMS= 0.69280E-02 Markov E=    -873.677867672946     t=       88.6
 Qu       2992 E=    -844.301282699115     steps=  470 RMS= 0.68760E-02 Markov E=    -871.987961266856     t=       88.7
 Qu       2993 E=    -845.965815622726     steps=  315 RMS= 0.55814E-02 Markov E=    -871.987961266856     t=       88.7
 Qu       2994 E=    -866.440255383383     steps=  249 RMS= 0.60618E-02 Markov E=    -871.987961266856     t=       88.7
 Qu       2995 E=    -871.235840308954     steps=  171 RMS= 0.66496E-02 Markov E=    -871.987961266856     t=       88.8
 Qu       2996 E=    -859.138235358145     steps=  132 RMS= 0.68826E-02 Markov E=    -871.987961266856     t=       88.8
 Qu       2997 E=    -866.157909180581     steps=  355 RMS= 0.50415E-02 Markov E=    -871.987961266856     t=       88.8
 Qu       2998 E=    -859.052897767737     steps=  555 RMS= 0.69541E-02 Markov E=    -871.987961266856     t=       88.9
 Qu       2999 E=    -838.743362195159     steps=  321 RMS= 0.55038E-02 Markov E=    -871.987961266856     t=       89.0
 Qu       3000 E=    -871.508352066825     steps=  124 RMS= 0.66118E-02 Markov E=    -871.987961266856     t=       89.0
Acceptance ratio for previous     50 steps=  0.1400  FAC=  1.0500
 Qu       3001 E=    -852.535863567463     steps=  216 RMS= 0.63303E-02 Markov E=    -871.508352066825     t=       89.0
 Qu       3002 E=    -870.167962711694     steps=  182 RMS= 0.52844E-02 Markov E=    -871.508352066825     t=       89.0
 Qu       3003 E=    -859.876652228475     steps=  264 RMS= 0.48044E-02 Markov E=    -871.508352066825     t=       89.1
 Qu       3004 E=    -868.532775959097     steps=  200 RMS= 0.63182E-02 Markov E=    -871.508352066825     t=       89.1
 Qu       3005 E=    -872.003293901836     steps=  127 RMS= 0.48571E-02 Markov E=    -871.508352066825     t=       89.1
 Qu       3006 E=    -871.144768644318     steps=  170 RMS= 0.51538E-02 Markov E=    -872.003293901836     t=       89.1
 Qu       3007 E=    -874.545820016425     steps=  154 RMS= 0.66082E-02 Markov E=    -872.003293901836     t=       89.2
 Qu       3008 E=    -870.105605523586     steps=  228 RMS= 0.58204E-02 Markov E=    -874.545820016425     t=       89.2
 Qu       3009 E=    -869.413521117486     steps=  478 RMS= 0.62657E-02 Markov E=    -874.545820016425     t=       89.3
 Qu       3010 E=    -872.099959830135     steps=  125 RMS= 0.60654E-02 Markov E=    -874.545820016425     t=       89.3
 Qu       3011 E=    -834.111538016640     steps=  395 RMS= 0.69385E-02 Markov E=    -872.099959830135     t=       89.3
 Qu       3012 E=    -848.104197250899     steps=  768 RMS= 0.62272E-02 Markov E=    -872.099959830135     t=       89.4
 Qu       3013 E=    -845.419891188690     steps=  360 RMS= 0.68718E-02 Markov E=    -872.099959830135     t=       89.5
 Qu       3014 E=    -845.866248691562     steps=  350 RMS= 0.58297E-02 Markov E=    -872.099959830135     t=       89.5
 Qu       3015 E=    -865.853044756895     steps=  163 RMS= 0.62766E-02 Markov E=    -872.099959830135     t=       89.6
 Qu       3016 E=    -860.431621665473     steps=  202 RMS= 0.67002E-02 Markov E=    -872.099959830135     t=       89.6
 Qu       3017 E=    -857.906304526926     steps=  229 RMS= 0.61689E-02 Markov E=    -872.099959830135     t=       89.6
 Qu       3018 E=    -866.151388497369     steps=  167 RMS= 0.62037E-02 Markov E=    -872.099959830135     t=       89.7
 Qu       3019 E=    -865.913297736080     steps=  210 RMS= 0.60159E-02 Markov E=    -872.099959830135     t=       89.7
 Qu       3020 E=    -854.670404197597     steps=  280 RMS= 0.63500E-02 Markov E=    -872.099959830135     t=       89.7
 Qu       3021 E=    -847.668657385641     steps=  769 RMS= 0.69652E-02 Markov E=    -872.099959830135     t=       89.8
 Qu       3022 E=    -867.948683228759     steps=  193 RMS= 0.68138E-02 Markov E=    -872.099959830135     t=       89.9
 Qu       3023 E=    -846.940380927510     steps=  493 RMS= 0.62743E-02 Markov E=    -872.099959830135     t=       89.9
 Qu       3024 E=    -871.580780687579     steps=  178 RMS= 0.46683E-02 Markov E=    -872.099959830135     t=       90.0
 Qu       3025 E=    -873.716944863479     steps=  123 RMS= 0.67446E-02 Markov E=    -871.580780687579     t=       90.0
 Qu       3026 E=    -868.183859249554     steps=  133 RMS= 0.60195E-02 Markov E=    -873.716944863479     t=       90.0
 Qu       3027 E=    -874.916429485162     steps=  205 RMS= 0.69797E-02 Markov E=    -873.716944863479     t=       90.0
 Qu       3028 E=    -848.047815770951     steps=  260 RMS= 0.66402E-02 Markov E=    -874.916429485162     t=       90.1
 Qu       3029 E=    -873.416240855534     steps=  149 RMS= 0.54931E-02 Markov E=    -874.916429485162     t=       90.1
 Qu       3030 E=    -872.788315457438     steps=  138 RMS= 0.64770E-02 Markov E=    -874.916429485162     t=       90.1
 Qu       3031 E=    -867.039114851688     steps=  167 RMS= 0.64830E-02 Markov E=    -874.916429485162     t=       90.1
 Qu       3032 E=    -875.030027740717     steps=  256 RMS= 0.58408E-02 Markov E=    -874.916429485162     t=       90.2
 Qu       3033 E=    -863.684014456106     steps=  469 RMS= 0.68230E-02 Markov E=    -875.030027740717     t=       90.2
 Qu       3034 E=    -863.998432663928     steps=  204 RMS= 0.56256E-02 Markov E=    -875.030027740717     t=       90.2
 Qu       3035 E=    -851.560872122542     steps=  248 RMS= 0.69975E-02 Markov E=    -875.030027740717     t=       90.3
 Qu       3036 E=    -871.096679760939     steps=  141 RMS= 0.64410E-02 Markov E=    -875.030027740717     t=       90.3
 Qu       3037 E=    -874.058321221141     steps=  137 RMS= 0.63770E-02 Markov E=    -875.030027740717     t=       90.3
 Qu       3038 E=    -874.463168178429     steps=  153 RMS= 0.64892E-02 Markov E=    -875.030027740717     t=       90.3
 Qu       3039 E=    -854.784363483491     steps=  197 RMS= 0.60332E-02 Markov E=    -874.463168178429     t=       90.4
 Qu       3040 E=    -874.403282958156     steps=  156 RMS= 0.56617E-02 Markov E=    -874.463168178429     t=       90.4
 Qu       3041 E=    -872.728413391856     steps=  167 RMS= 0.66504E-02 Markov E=    -874.403282958156     t=       90.4
 Qu       3042 E=    -856.690318544351     steps=  315 RMS= 0.55102E-02 Markov E=    -874.403282958156     t=       90.5
 Qu       3043 E=    -873.830151233450     steps=  128 RMS= 0.58345E-02 Markov E=    -874.403282958156     t=       90.5
 Qu       3044 E=    -864.963693397573     steps=  114 RMS= 0.56792E-02 Markov E=    -873.830151233450     t=       90.5
 Qu       3045 E=    -860.587482947275     steps=  299 RMS= 0.48178E-02 Markov E=    -873.830151233450     t=       90.5
 Qu       3046 E=    -847.260517935616     steps=  277 RMS= 0.66474E-02 Markov E=    -873.830151233450     t=       90.6
 Qu       3047 E=    -869.675772429162     steps=  152 RMS= 0.62745E-02 Markov E=    -873.830151233450     t=       90.6
 Qu       3048 E=    -872.492233907814     steps=  114 RMS= 0.65260E-02 Markov E=    -873.830151233450     t=       90.6
 Qu       3049 E=    -868.498616809756     steps=  133 RMS= 0.69768E-02 Markov E=    -873.830151233450     t=       90.6
 Qu       3050 E=    -865.475367877668     steps=  155 RMS= 0.66870E-02 Markov E=    -873.830151233450     t=       90.6
Acceptance ratio for previous     50 steps=  0.2000  FAC=  1.0500
 Qu       3051 E=    -875.781571378467     steps=  204 RMS= 0.68905E-02 Markov E=    -873.830151233450     t=       90.7
 Qu       3052 E=    -868.939044829611     steps=  276 RMS= 0.47321E-02 Markov E=    -875.781571378467     t=       90.7
 Qu       3053 E=    -867.226119149513     steps=  171 RMS= 0.65124E-02 Markov E=    -875.781571378467     t=       90.7
 Qu       3054 E=    -871.387736445092     steps=  211 RMS= 0.68898E-02 Markov E=    -875.781571378467     t=       90.8
 Qu       3055 E=    -875.978553126468     steps=   90 RMS= 0.68237E-02 Markov E=    -875.781571378467     t=       90.8
 Qu       3056 E=    -863.711981592212     steps=  290 RMS= 0.63720E-02 Markov E=    -875.978553126468     t=       90.8
 Qu       3057 E=    -876.403113792921     steps=  136 RMS= 0.57129E-02 Markov E=    -875.978553126468     t=       90.8
 Qu       3058 E=    -858.644876473348     steps=  217 RMS= 0.68003E-02 Markov E=    -876.403113792921     t=       90.9
 Qu       3059 E=    -862.941402607437     steps=  285 RMS= 0.64972E-02 Markov E=    -876.403113792921     t=       90.9
 Qu       3060 E=    -873.405398702193     steps=  116 RMS= 0.60892E-02 Markov E=    -876.403113792921     t=       90.9
 Qu       3061 E=    -873.468707363140     steps=  103 RMS= 0.66152E-02 Markov E=    -876.403113792921     t=       90.9
 Qu       3062 E=    -871.851436379675     steps=  331 RMS= 0.67353E-02 Markov E=    -876.403113792921     t=       91.0
 Qu       3063 E=    -875.680404846024     steps=  123 RMS= 0.59545E-02 Markov E=    -876.403113792921     t=       91.0
 Qu       3064 E=    -874.611723191249     steps=  175 RMS= 0.65128E-02 Markov E=    -876.403113792921     t=       91.0
 Qu       3065 E=    -849.654195612705     steps=  418 RMS= 0.60002E-02 Markov E=    -876.403113792921     t=       91.1
 Qu       3066 E=    -866.435822785661     steps=  300 RMS= 0.69977E-02 Markov E=    -876.403113792921     t=       91.1
 Qu       3067 E=    -873.652328654798     steps=  136 RMS= 0.67646E-02 Markov E=    -876.403113792921     t=       91.1
 Qu       3068 E=    -867.447827863544     steps=  425 RMS= 0.61753E-02 Markov E=    -876.403113792921     t=       91.2
 Qu       3069 E=    -875.530862346051     steps=  144 RMS= 0.59283E-02 Markov E=    -876.403113792921     t=       91.2
 Qu       3070 E=    -840.820711352006     steps=  311 RMS= 0.69268E-02 Markov E=    -875.530862346051     t=       91.3
 Qu       3071 E=    -838.162529540616     steps=  340 RMS= 0.66820E-02 Markov E=    -875.530862346051     t=       91.3
 Qu       3072 E=    -846.999880085465     steps=  397 RMS= 0.67035E-02 Markov E=    -875.530862346051     t=       91.4
 Qu       3073 E=    -861.773001403376     steps=  198 RMS= 0.67283E-02 Markov E=    -875.530862346051     t=       91.4
 Qu       3074 E=    -873.384435838564     steps=  150 RMS= 0.68869E-02 Markov E=    -875.530862346051     t=       91.4
 Qu       3075 E=    -876.645695022707     steps=  133 RMS= 0.47661E-02 Markov E=    -875.530862346051     t=       91.4
 Qu       3076 E=    -876.414649169726     steps=  176 RMS= 0.43005E-02 Markov E=    -876.645695022707     t=       91.5
 Qu       3077 E=    -875.277795265468     steps=   85 RMS= 0.56761E-02 Markov E=    -876.645695022707     t=       91.5
 Qu       3078 E=    -834.242027239849     steps=  207 RMS= 0.52994E-02 Markov E=    -875.277795265468     t=       91.5
 Qu       3079 E=    -873.299246410623     steps=  145 RMS= 0.68213E-02 Markov E=    -875.277795265468     t=       91.5
 Qu       3080 E=    -846.458980735694     steps=  543 RMS= 0.64227E-02 Markov E=    -873.299246410623     t=       91.6
 Qu       3081 E=    -870.446989051013     steps=  162 RMS= 0.64232E-02 Markov E=    -873.299246410623     t=       91.6
 Qu       3082 E=    -845.841072158894     steps=  328 RMS= 0.60319E-02 Markov E=    -873.299246410623     t=       91.7
 Qu       3083 E=    -843.183570741953     steps=  315 RMS= 0.58557E-02 Markov E=    -873.299246410623     t=       91.7
 Qu       3084 E=    -872.834061522479     steps=  157 RMS= 0.62765E-02 Markov E=    -873.299246410623     t=       91.7
 Qu       3085 E=    -871.818565130194     steps=  166 RMS= 0.64579E-02 Markov E=    -872.834061522479     t=       91.8
 Qu       3086 E=    -844.113880510314     steps=  206 RMS= 0.68531E-02 Markov E=    -872.834061522479     t=       91.8
 Qu       3087 E=    -876.519240546138     steps=  145 RMS= 0.51060E-02 Markov E=    -872.834061522479     t=       91.8
 Qu       3088 E=    -871.048513112264     steps=  236 RMS= 0.68914E-02 Markov E=    -876.519240546138     t=       91.8
 Qu       3089 E=    -874.119763230955     steps=  127 RMS= 0.66970E-02 Markov E=    -876.519240546138     t=       91.9
 Qu       3090 E=    -870.076254097439     steps=  158 RMS= 0.65074E-02 Markov E=    -876.519240546138     t=       91.9
 Qu       3091 E=    -855.102878844470     steps=  285 RMS= 0.49822E-02 Markov E=    -876.519240546138     t=       91.9
 Qu       3092 E=    -873.704757274344     steps=  105 RMS= 0.67058E-02 Markov E=    -876.519240546138     t=       91.9
 Qu       3093 E=    -879.081140709153     steps=  140 RMS= 0.57335E-02 Markov E=    -876.519240546138     t=       92.0
 Qu       3094 E=    -875.369235596920     steps=  163 RMS= 0.59734E-02 Markov E=    -879.081140709153     t=       92.0
 Qu       3095 E=    -861.088073147647     steps=  308 RMS= 0.55254E-02 Markov E=    -879.081140709153     t=       92.0
 Qu       3096 E=    -854.841530718221     steps=  303 RMS= 0.67718E-02 Markov E=    -879.081140709153     t=       92.1
 Qu       3097 E=    -877.860528246933     steps=  137 RMS= 0.56257E-02 Markov E=    -879.081140709153     t=       92.1
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -885.0259393        -882.9006749    
 Qu       3098 E=    -885.025939325265     steps=  357 RMS= 0.55925E-02 Markov E=    -879.081140709153     t=       92.1
 Qu       3099 E=    -873.762942799699     steps=  180 RMS= 0.63504E-02 Markov E=    -885.025939325265     t=       92.2
 Qu       3100 E=    -850.017037588465     steps=  278 RMS= 0.69815E-02 Markov E=    -885.025939325265     t=       92.2
Acceptance ratio for previous     50 steps=  0.2200  FAC=  1.0500
 Qu       3101 E=    -876.094124513927     steps=  242 RMS= 0.58823E-02 Markov E=    -885.025939325265     t=       92.2
 Qu       3102 E=    -874.134771725697     steps=  274 RMS= 0.62275E-02 Markov E=    -885.025939325265     t=       92.3
 Qu       3103 E=    -864.937183194798     steps=  417 RMS= 0.65284E-02 Markov E=    -885.025939325265     t=       92.3
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -885.8106422        -885.0259393    
 Qu       3104 E=    -885.810642209763     steps=  139 RMS= 0.68599E-02 Markov E=    -885.025939325265     t=       92.4
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -886.7590834        -885.8106422    
 Qu       3105 E=    -886.759083446115     steps=  144 RMS= 0.69362E-02 Markov E=    -885.810642209763     t=       92.4
 Qu       3106 E=    -881.624298620711     steps=  166 RMS= 0.65989E-02 Markov E=    -886.759083446115     t=       92.4
 Qu       3107 E=    -881.659559105772     steps=  113 RMS= 0.64236E-02 Markov E=    -886.759083446115     t=       92.4
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -887.5657649        -886.7590834    
 Qu       3108 E=    -887.565764921673     steps=  127 RMS= 0.50442E-02 Markov E=    -886.759083446115     t=       92.4
 Qu       3109 E=    -881.266040898692     steps=  139 RMS= 0.54018E-02 Markov E=    -887.565764921673     t=       92.5
 Qu       3110 E=    -882.262482988025     steps=  204 RMS= 0.57260E-02 Markov E=    -887.565764921673     t=       92.5
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -888.9211123        -887.5657649    
 Qu       3111 E=    -888.921112278708     steps=  168 RMS= 0.68079E-02 Markov E=    -887.565764921673     t=       92.5
 Qu       3112 E=    -848.264336046799     steps=  475 RMS= 0.56022E-02 Markov E=    -888.921112278708     t=       92.6
 Qu       3113 E=    -886.945955746696     steps=  139 RMS= 0.67724E-02 Markov E=    -888.921112278708     t=       92.6
 Qu       3114 E=    -886.737325001642     steps=  245 RMS= 0.49821E-02 Markov E=    -886.945955746696     t=       92.6
 Qu       3115 E=    -885.241702604402     steps=  181 RMS= 0.56588E-02 Markov E=    -886.737325001642     t=       92.6
 Qu       3116 E=    -884.059255840367     steps=  112 RMS= 0.61143E-02 Markov E=    -885.241702604402     t=       92.7
 Qu       3117 E=    -879.056860287847     steps=  191 RMS= 0.59810E-02 Markov E=    -884.059255840367     t=       92.7
 Qu       3118 E=    -861.492136163878     steps=  182 RMS= 0.61676E-02 Markov E=    -884.059255840367     t=       92.7
 Qu       3119 E=    -872.081363058818     steps=  211 RMS= 0.63290E-02 Markov E=    -884.059255840367     t=       92.7
 Qu       3120 E=    -867.541915431534     steps=  140 RMS= 0.69929E-02 Markov E=    -884.059255840367     t=       92.8
 Qu       3121 E=    -866.434248488029     steps=  239 RMS= 0.65631E-02 Markov E=    -884.059255840367     t=       92.8
 Qu       3122 E=    -878.901506521742     steps=  232 RMS= 0.67151E-02 Markov E=    -884.059255840367     t=       92.8
 Qu       3123 E=    -880.566619743055     steps=  303 RMS= 0.61793E-02 Markov E=    -884.059255840367     t=       92.9
 Qu       3124 E=    -883.449266719013     steps=  165 RMS= 0.67225E-02 Markov E=    -884.059255840367     t=       92.9
 Qu       3125 E=    -880.488481818968     steps=  181 RMS= 0.54934E-02 Markov E=    -883.449266719013     t=       92.9
 Qu       3126 E=    -885.230326139263     steps=  134 RMS= 0.59862E-02 Markov E=    -883.449266719013     t=       92.9
 Qu       3127 E=    -847.302428960866     steps=  311 RMS= 0.50435E-02 Markov E=    -885.230326139263     t=       93.0
 Qu       3128 E=    -882.474051371748     steps=   94 RMS= 0.63134E-02 Markov E=    -885.230326139263     t=       93.0
 Qu       3129 E=    -876.525320957844     steps=  194 RMS= 0.54188E-02 Markov E=    -885.230326139263     t=       93.0
 Qu       3130 E=    -887.040459653399     steps=  111 RMS= 0.58319E-02 Markov E=    -885.230326139263     t=       93.0
 Qu       3131 E=    -868.721507016021     steps=  106 RMS= 0.69356E-02 Markov E=    -887.040459653399     t=       93.1
 Qu       3132 E=    -886.500571491339     steps=  112 RMS= 0.64527E-02 Markov E=    -887.040459653399     t=       93.1
 Qu       3133 E=    -882.431343804274     steps=  128 RMS= 0.61860E-02 Markov E=    -886.500571491339     t=       93.1
 Qu       3134 E=    -886.189813807893     steps=  125 RMS= 0.52796E-02 Markov E=    -886.500571491339     t=       93.1
 Qu       3135 E=    -873.486530753832     steps=  318 RMS= 0.69122E-02 Markov E=    -886.189813807893     t=       93.2
 Qu       3136 E=    -882.274740069219     steps=  190 RMS= 0.55221E-02 Markov E=    -886.189813807893     t=       93.2
 Qu       3137 E=    -885.434573001074     steps=  175 RMS= 0.57025E-02 Markov E=    -886.189813807893     t=       93.2
 Qu       3138 E=    -844.258459050348     steps=  311 RMS= 0.58059E-02 Markov E=    -885.434573001074     t=       93.2
 Qu       3139 E=    -882.614746181613     steps=  145 RMS= 0.62627E-02 Markov E=    -885.434573001074     t=       93.3
 Qu       3140 E=    -848.251061156915     steps=  223 RMS= 0.59512E-02 Markov E=    -885.434573001074     t=       93.3
 Qu       3141 E=    -879.861265774641     steps=  118 RMS= 0.48530E-02 Markov E=    -885.434573001074     t=       93.3
 Qu       3142 E=    -878.357798739334     steps=  145 RMS= 0.48585E-02 Markov E=    -885.434573001074     t=       93.3
 Qu       3143 E=    -878.734855704240     steps=  148 RMS= 0.61495E-02 Markov E=    -885.434573001074     t=       93.4
 Qu       3144 E=    -885.190354846158     steps=  125 RMS= 0.64946E-02 Markov E=    -885.434573001074     t=       93.4
 Qu       3145 E=    -881.752305080883     steps=  186 RMS= 0.62355E-02 Markov E=    -885.190354846158     t=       93.4
 Qu       3146 E=    -844.920212545840     steps=  263 RMS= 0.60220E-02 Markov E=    -885.190354846158     t=       93.4
 Qu       3147 E=    -882.044056187703     steps=  156 RMS= 0.62120E-02 Markov E=    -885.190354846158     t=       93.5
 Qu       3148 E=    -885.613485110469     steps=  102 RMS= 0.69259E-02 Markov E=    -885.190354846158     t=       93.5
 Qu       3149 E=    -878.261813634716     steps=  146 RMS= 0.68175E-02 Markov E=    -885.613485110469     t=       93.5
 Qu       3150 E=    -885.505690477977     steps=  175 RMS= 0.57299E-02 Markov E=    -885.613485110469     t=       93.5
Acceptance ratio for previous     50 steps=  0.3200  FAC=  1.0500
 Qu       3151 E=    -883.997271577920     steps=  116 RMS= 0.62580E-02 Markov E=    -885.613485110469     t=       93.5
 Qu       3152 E=    -878.312571401063     steps=  131 RMS= 0.54606E-02 Markov E=    -883.997271577920     t=       93.5
 Qu       3153 E=    -851.682019282252     steps=  330 RMS= 0.65205E-02 Markov E=    -883.997271577920     t=       93.6
 Qu       3154 E=    -881.577265841766     steps=  171 RMS= 0.59917E-02 Markov E=    -883.997271577920     t=       93.6
 Qu       3155 E=    -887.586664865729     steps=  170 RMS= 0.41641E-02 Markov E=    -883.997271577920     t=       93.6
 Qu       3156 E=    -878.631455144675     steps=  272 RMS= 0.51024E-02 Markov E=    -887.586664865729     t=       93.7
 Qu       3157 E=    -887.819659614105     steps=  153 RMS= 0.64152E-02 Markov E=    -887.586664865729     t=       93.7
 Qu       3158 E=    -881.143847586218     steps=  123 RMS= 0.52897E-02 Markov E=    -887.819659614105     t=       93.7
 Qu       3159 E=    -884.585057130277     steps=  122 RMS= 0.69526E-02 Markov E=    -887.819659614105     t=       93.7
 Qu       3160 E=    -845.695397942054     steps=  240 RMS= 0.64058E-02 Markov E=    -887.819659614105     t=       93.8
 Qu       3161 E=    -883.772904926066     steps=  123 RMS= 0.60100E-02 Markov E=    -887.819659614105     t=       93.8
 Qu       3162 E=    -887.304136948344     steps=  104 RMS= 0.53961E-02 Markov E=    -887.819659614105     t=       93.8
 Qu       3163 E=    -876.859381098495     steps=  299 RMS= 0.61539E-02 Markov E=    -887.304136948344     t=       93.9
 Qu       3164 E=    -873.082865740855     steps=  157 RMS= 0.68999E-02 Markov E=    -887.304136948344     t=       93.9
 Qu       3165 E=    -881.298158653319     steps=  196 RMS= 0.59277E-02 Markov E=    -887.304136948344     t=       93.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -889.0681458        -888.9211123    
 Qu       3166 E=    -889.068145760053     steps=  126 RMS= 0.66329E-02 Markov E=    -887.304136948344     t=       93.9
 Qu       3167 E=    -866.260412615971     steps=  308 RMS= 0.58950E-02 Markov E=    -889.068145760053     t=       94.0
 Qu       3168 E=    -889.067712514383     steps=  114 RMS= 0.69363E-02 Markov E=    -889.068145760053     t=       94.0
 Qu       3169 E=    -882.554007344985     steps=  129 RMS= 0.62272E-02 Markov E=    -889.067712514383     t=       94.0
 Qu       3170 E=    -883.707529665418     steps=  127 RMS= 0.64991E-02 Markov E=    -889.067712514383     t=       94.0
 Qu       3171 E=    -889.068502192975     steps=  110 RMS= 0.69811E-02 Markov E=    -889.067712514383     t=       94.0
 Qu       3172 E=    -888.539094211765     steps=  108 RMS= 0.49766E-02 Markov E=    -889.068502192975     t=       94.1
 Qu       3173 E=    -887.733479482487     steps=  167 RMS= 0.66154E-02 Markov E=    -889.068502192975     t=       94.1
 Qu       3174 E=    -855.927301696371     steps=  237 RMS= 0.61007E-02 Markov E=    -887.733479482487     t=       94.1
 Qu       3175 E=    -888.706217023775     steps=  124 RMS= 0.46103E-02 Markov E=    -887.733479482487     t=       94.1
 Qu       3176 E=    -887.655876043803     steps=  165 RMS= 0.60763E-02 Markov E=    -888.706217023775     t=       94.1
 Qu       3177 E=    -887.811100543753     steps=  125 RMS= 0.63573E-02 Markov E=    -887.655876043803     t=       94.2
 Qu       3178 E=    -887.811092271234     steps=   94 RMS= 0.69745E-02 Markov E=    -887.811100543753     t=       94.2
 Qu       3179 E=    -842.350323679531     steps=  260 RMS= 0.62817E-02 Markov E=    -887.811092271234     t=       94.2
 Qu       3180 E=    -881.847773192545     steps=  110 RMS= 0.66179E-02 Markov E=    -887.811092271234     t=       94.2
 Qu       3181 E=    -887.966177946239     steps=  162 RMS= 0.69287E-02 Markov E=    -887.811092271234     t=       94.3
 Qu       3182 E=    -875.691023828770     steps=  282 RMS= 0.66123E-02 Markov E=    -887.966177946239     t=       94.3
 Qu       3183 E=    -882.288910198940     steps=  305 RMS= 0.57764E-02 Markov E=    -887.966177946239     t=       94.3
 Qu       3184 E=    -887.966120897541     steps=  119 RMS= 0.62915E-02 Markov E=    -887.966177946239     t=       94.4
 Qu       3185 E=    -888.385935081278     steps=  120 RMS= 0.56465E-02 Markov E=    -887.966120897541     t=       94.4
 Qu       3186 E=    -883.053028171534     steps=  180 RMS= 0.46002E-02 Markov E=    -888.385935081278     t=       94.4
 Qu       3187 E=    -882.438581943444     steps=  190 RMS= 0.68347E-02 Markov E=    -888.385935081278     t=       94.4
 Qu       3188 E=    -886.511569307353     steps=  225 RMS= 0.69785E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3189 E=    -882.365259703645     steps=  140 RMS= 0.67027E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3190 E=    -877.425725925305     steps=  135 RMS= 0.68740E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3191 E=    -882.854707139406     steps=  136 RMS= 0.56758E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3192 E=    -887.855701754615     steps=   98 RMS= 0.67474E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3193 E=    -887.393363371707     steps=  133 RMS= 0.69645E-02 Markov E=    -888.385935081278     t=       94.5
 Qu       3194 E=    -887.896258920568     steps=  120 RMS= 0.55218E-02 Markov E=    -888.385935081278     t=       94.6
 Qu       3195 E=    -878.875169129709     steps=  114 RMS= 0.57721E-02 Markov E=    -888.385935081278     t=       94.6
 Qu       3196 E=    -887.277067852148     steps=  128 RMS= 0.53010E-02 Markov E=    -888.385935081278     t=       94.6
 Qu       3197 E=    -876.808576976831     steps=  264 RMS= 0.58808E-02 Markov E=    -887.277067852148     t=       94.6
 Qu       3198 E=    -881.469843231951     steps=  272 RMS= 0.55895E-02 Markov E=    -887.277067852148     t=       94.7
 Qu       3199 E=    -883.401008445151     steps=  236 RMS= 0.53643E-02 Markov E=    -887.277067852148     t=       94.7
 Qu       3200 E=    -887.636701984180     steps=  114 RMS= 0.60031E-02 Markov E=    -887.277067852148     t=       94.7
Acceptance ratio for previous     50 steps=  0.3400  FAC=  1.0500
 Qu       3201 E=    -853.442667937528     steps=  185 RMS= 0.64209E-02 Markov E=    -887.636701984180     t=       94.7
 Qu       3202 E=    -881.897450779639     steps=  122 RMS= 0.68107E-02 Markov E=    -887.636701984180     t=       94.8
 Qu       3203 E=    -885.492822979831     steps=  154 RMS= 0.64977E-02 Markov E=    -887.636701984180     t=       94.8
 Qu       3204 E=    -887.584498587916     steps=  101 RMS= 0.63672E-02 Markov E=    -887.636701984180     t=       94.8
 Qu       3205 E=    -888.265086572766     steps=  153 RMS= 0.51774E-02 Markov E=    -887.584498587916     t=       94.8
 Qu       3206 E=    -879.165169849417     steps=  208 RMS= 0.54570E-02 Markov E=    -888.265086572766     t=       94.9
 Qu       3207 E=    -879.558977091851     steps=  246 RMS= 0.68210E-02 Markov E=    -888.265086572766     t=       94.9
 Qu       3208 E=    -887.143651244094     steps=  216 RMS= 0.67788E-02 Markov E=    -888.265086572766     t=       94.9
 Qu       3209 E=    -886.020179209421     steps=  214 RMS= 0.58780E-02 Markov E=    -888.265086572766     t=       94.9
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -889.3152222        -889.0685022    
 Qu       3210 E=    -889.315222248744     steps=   95 RMS= 0.61489E-02 Markov E=    -888.265086572766     t=       95.0
 Qu       3211 E=    -888.829319103959     steps=  124 RMS= 0.65563E-02 Markov E=    -889.315222248744     t=       95.0
 Qu       3212 E=    -884.230765246591     steps=  159 RMS= 0.67023E-02 Markov E=    -889.315222248744     t=       95.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -889.7483553        -889.3152222    
 Qu       3213 E=    -889.748355329991     steps=  122 RMS= 0.68491E-02 Markov E=    -889.315222248744     t=       95.0
 Qu       3214 E=    -861.013871170939     steps=  329 RMS= 0.65835E-02 Markov E=    -889.748355329991     t=       95.1
 Qu       3215 E=    -848.787225529060     steps=  306 RMS= 0.56751E-02 Markov E=    -889.748355329991     t=       95.1
 Qu       3216 E=    -888.791243063366     steps=  119 RMS= 0.59036E-02 Markov E=    -889.748355329991     t=       95.1
 Qu       3217 E=    -886.212311174955     steps=  114 RMS= 0.58985E-02 Markov E=    -889.748355329991     t=       95.1
 Qu       3218 E=    -889.103258752095     steps=  112 RMS= 0.48406E-02 Markov E=    -889.748355329991     t=       95.2
 Qu       3219 E=    -881.920560021086     steps=  176 RMS= 0.60271E-02 Markov E=    -889.103258752095     t=       95.2
 Qu       3220 E=    -877.854347941708     steps=  140 RMS= 0.65650E-02 Markov E=    -889.103258752095     t=       95.2
 Qu       3221 E=    -882.218181370823     steps=  127 RMS= 0.36923E-02 Markov E=    -889.103258752095     t=       95.2
 Qu       3222 E=    -851.116400890422     steps=  397 RMS= 0.68317E-02 Markov E=    -889.103258752095     t=       95.3
 Qu       3223 E=    -888.575529837042     steps=  139 RMS= 0.64231E-02 Markov E=    -889.103258752095     t=       95.3
 Qu       3224 E=    -877.096598988560     steps=  143 RMS= 0.50680E-02 Markov E=    -889.103258752095     t=       95.3
 Qu       3225 E=    -888.938722690037     steps=  126 RMS= 0.56187E-02 Markov E=    -889.103258752095     t=       95.3
 Qu       3226 E=    -859.875251360178     steps=  461 RMS= 0.62510E-02 Markov E=    -888.938722690037     t=       95.4
 Qu       3227 E=    -875.761026589001     steps=  372 RMS= 0.64134E-02 Markov E=    -888.938722690037     t=       95.4
 Qu       3228 E=    -886.036679818976     steps=  167 RMS= 0.59064E-02 Markov E=    -888.938722690037     t=       95.5
 Qu       3229 E=    -888.511249673648     steps=   89 RMS= 0.58743E-02 Markov E=    -888.938722690037     t=       95.5
 Qu       3230 E=    -881.219738607660     steps=  186 RMS= 0.59503E-02 Markov E=    -888.511249673648     t=       95.5
 Qu       3231 E=    -883.186569639244     steps=  141 RMS= 0.69403E-02 Markov E=    -888.511249673648     t=       95.5
 Qu       3232 E=    -881.775810456609     steps=  185 RMS= 0.60955E-02 Markov E=    -888.511249673648     t=       95.6
 Qu       3233 E=    -883.334177879341     steps=  151 RMS= 0.64730E-02 Markov E=    -888.511249673648     t=       95.6
 Qu       3234 E=    -881.301133037934     steps=  110 RMS= 0.69069E-02 Markov E=    -888.511249673648     t=       95.6
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -890.3099948        -889.7483553    
 Qu       3235 E=    -890.309994753860     steps=  204 RMS= 0.65510E-02 Markov E=    -888.511249673648     t=       95.6
 Qu       3236 E=    -887.366464455251     steps=  214 RMS= 0.65968E-02 Markov E=    -890.309994753860     t=       95.7
 Qu       3237 E=    -884.694772929364     steps=  113 RMS= 0.61968E-02 Markov E=    -890.309994753860     t=       95.7
 Qu       3238 E=    -884.710090672110     steps=  108 RMS= 0.65569E-02 Markov E=    -890.309994753860     t=       95.7
 Qu       3239 E=    -885.131254141760     steps=  243 RMS= 0.59641E-02 Markov E=    -890.309994753860     t=       95.7
 Qu       3240 E=    -883.230059740192     steps=  133 RMS= 0.66291E-02 Markov E=    -890.309994753860     t=       95.7
 Qu       3241 E=    -885.928191154698     steps=  283 RMS= 0.54720E-02 Markov E=    -890.309994753860     t=       95.8
 Qu       3242 E=    -884.228796271064     steps=  170 RMS= 0.65409E-02 Markov E=    -890.309994753860     t=       95.8
 Qu       3243 E=    -875.270589195407     steps=  267 RMS= 0.69026E-02 Markov E=    -890.309994753860     t=       95.8
 Qu       3244 E=    -889.492727739471     steps=  137 RMS= 0.57902E-02 Markov E=    -890.309994753860     t=       95.9
 Qu       3245 E=    -884.644772935279     steps=  121 RMS= 0.59480E-02 Markov E=    -890.309994753860     t=       95.9
 Qu       3246 E=    -886.547710781216     steps=  135 RMS= 0.53536E-02 Markov E=    -890.309994753860     t=       95.9
 Qu       3247 E=    -881.609951960494     steps=  155 RMS= 0.65843E-02 Markov E=    -890.309994753860     t=       95.9
 Qu       3248 E=    -883.621645810634     steps=  167 RMS= 0.56786E-02 Markov E=    -890.309994753860     t=       95.9
 Qu       3249 E=    -883.275882288508     steps=  142 RMS= 0.61043E-02 Markov E=    -890.309994753860     t=       96.0
 Qu       3250 E=    -881.319819866214     steps=  200 RMS= 0.65932E-02 Markov E=    -890.309994753860     t=       96.0
Acceptance ratio for previous     50 steps=  0.1600  FAC=  1.0500
 Qu       3251 E=    -889.071496524299     steps=  114 RMS= 0.57505E-02 Markov E=    -890.309994753860     t=       96.0
 Qu       3252 E=    -884.137064787725     steps=  120 RMS= 0.67090E-02 Markov E=    -890.309994753860     t=       96.0
 Qu       3253 E=    -849.013526741238     steps=  252 RMS= 0.66008E-02 Markov E=    -890.309994753860     t=       96.1
 Qu       3254 E=    -889.089332675792     steps=  112 RMS= 0.63672E-02 Markov E=    -890.309994753860     t=       96.1
 Qu       3255 E=    -886.705702372792     steps=  175 RMS= 0.57734E-02 Markov E=    -890.309994753860     t=       96.1
 Qu       3256 E=    -878.808155330008     steps=  205 RMS= 0.56673E-02 Markov E=    -890.309994753860     t=       96.1
 Qu       3257 E=    -887.638442338547     steps=  149 RMS= 0.64898E-02 Markov E=    -890.309994753860     t=       96.1
 Qu       3258 E=    -883.868556894516     steps=  111 RMS= 0.65650E-02 Markov E=    -890.309994753860     t=       96.2
 Qu       3259 E=    -879.507493914158     steps=  172 RMS= 0.67693E-02 Markov E=    -890.309994753860     t=       96.2
 Qu       3260 E=    -889.398313910458     steps=  274 RMS= 0.69836E-02 Markov E=    -890.309994753860     t=       96.2
 Qu       3261 E=    -840.425283243368     steps=  442 RMS= 0.64387E-02 Markov E=    -890.309994753860     t=       96.3
 Qu       3262 E=    -887.763246062986     steps=  107 RMS= 0.69674E-02 Markov E=    -890.309994753860     t=       96.3
 Qu       3263 E=    -889.383504091853     steps=  136 RMS= 0.62928E-02 Markov E=    -890.309994753860     t=       96.3
 Qu       3264 E=    -889.961260760498     steps=  118 RMS= 0.47628E-02 Markov E=    -890.309994753860     t=       96.3
 Qu       3265 E=    -883.249550058335     steps=  140 RMS= 0.69570E-02 Markov E=    -889.961260760498     t=       96.4
 Qu       3266 E=    -885.317845102401     steps=  161 RMS= 0.57282E-02 Markov E=    -889.961260760498     t=       96.4
 Qu       3267 E=    -890.200197379984     steps=  128 RMS= 0.69710E-02 Markov E=    -889.961260760498     t=       96.4
 Qu       3268 E=    -877.160306895056     steps=  132 RMS= 0.67953E-02 Markov E=    -890.200197379984     t=       96.4
 Qu       3269 E=    -887.451702617223     steps=  126 RMS= 0.52691E-02 Markov E=    -890.200197379984     t=       96.4
 Qu       3270 E=    -889.960413199189     steps=  112 RMS= 0.69714E-02 Markov E=    -890.200197379984     t=       96.4
 Qu       3271 E=    -883.703913728417     steps=  199 RMS= 0.69093E-02 Markov E=    -889.960413199189     t=       96.5
 Qu       3272 E=    -882.492111552586     steps=  137 RMS= 0.57581E-02 Markov E=    -889.960413199189     t=       96.5
 Qu       3273 E=    -890.303149491470     steps=   96 RMS= 0.58266E-02 Markov E=    -889.960413199189     t=       96.5
 Qu       3274 E=    -887.818715272033     steps=  108 RMS= 0.51463E-02 Markov E=    -890.303149491470     t=       96.5
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -890.6243264        -890.3099948    
 Qu       3275 E=    -890.624326446374     steps=  156 RMS= 0.54325E-02 Markov E=    -890.303149491470     t=       96.5
 Qu       3276 E=    -884.419454109061     steps=   86 RMS= 0.53448E-02 Markov E=    -890.624326446374     t=       96.6
 Qu       3277 E=    -886.872827581548     steps=  309 RMS= 0.48651E-02 Markov E=    -890.624326446374     t=       96.6
 Qu       3278 E=    -887.530265543606     steps=  135 RMS= 0.59040E-02 Markov E=    -890.624326446374     t=       96.6
 Qu       3279 E=    -884.849882685781     steps=  117 RMS= 0.66726E-02 Markov E=    -890.624326446374     t=       96.6
 Qu       3280 E=    -890.623479568417     steps=  188 RMS= 0.68713E-02 Markov E=    -890.624326446374     t=       96.7
 Qu       3281 E=    -889.940987463668     steps=  119 RMS= 0.68417E-02 Markov E=    -890.623479568417     t=       96.7
 Qu       3282 E=    -889.643265279718     steps=  136 RMS= 0.49355E-02 Markov E=    -889.940987463668     t=       96.7
 Qu       3283 E=    -880.456244605472     steps=  159 RMS= 0.69342E-02 Markov E=    -889.643265279718     t=       96.7
 Qu       3284 E=    -879.923450715023     steps=  149 RMS= 0.67699E-02 Markov E=    -889.643265279718     t=       96.8
 Qu       3285 E=    -884.506425143520     steps=  138 RMS= 0.63915E-02 Markov E=    -889.643265279718     t=       96.8
 Qu       3286 E=    -885.653904024476     steps=  186 RMS= 0.62628E-02 Markov E=    -889.643265279718     t=       96.8
 Qu       3287 E=    -844.469343557648     steps=  419 RMS= 0.62660E-02 Markov E=    -889.643265279718     t=       96.9
 Qu       3288 E=    -879.715245382430     steps=  128 RMS= 0.67590E-02 Markov E=    -889.643265279718     t=       96.9
 Qu       3289 E=    -880.837416698059     steps=  267 RMS= 0.66287E-02 Markov E=    -889.643265279718     t=       96.9
 Qu       3290 E=    -887.500637145940     steps=  131 RMS= 0.56542E-02 Markov E=    -889.643265279718     t=       96.9
 Qu       3291 E=    -889.629033584518     steps=  117 RMS= 0.64296E-02 Markov E=    -889.643265279718     t=       96.9
 Qu       3292 E=    -871.917494590911     steps=  179 RMS= 0.58416E-02 Markov E=    -889.629033584518     t=       97.0
 Qu       3293 E=    -885.144143522322     steps=  334 RMS= 0.55709E-02 Markov E=    -889.629033584518     t=       97.0
 Qu       3294 E=    -890.051310069096     steps=   94 RMS= 0.64593E-02 Markov E=    -889.629033584518     t=       97.0
 Qu       3295 E=    -885.388220115869     steps=  119 RMS= 0.65197E-02 Markov E=    -890.051310069096     t=       97.1
 Qu       3296 E=    -883.122244324590     steps=  189 RMS= 0.68643E-02 Markov E=    -890.051310069096     t=       97.1
 Qu       3297 E=    -855.233142112185     steps=  234 RMS= 0.67912E-02 Markov E=    -890.051310069096     t=       97.1
 Qu       3298 E=    -889.624797057056     steps=   92 RMS= 0.63771E-02 Markov E=    -890.051310069096     t=       97.1
 Qu       3299 E=    -871.216562187766     steps=  548 RMS= 0.65026E-02 Markov E=    -889.624797057056     t=       97.2
 Qu       3300 E=    -889.630622164190     steps=   97 RMS= 0.56588E-02 Markov E=    -889.624797057056     t=       97.2
Acceptance ratio for previous     50 steps=  0.2400  FAC=  1.0500
 Qu       3301 E=    -888.478353213437     steps=  169 RMS= 0.54635E-02 Markov E=    -889.630622164190     t=       97.2
 Qu       3302 E=    -883.538759450264     steps=  155 RMS= 0.58816E-02 Markov E=    -888.478353213437     t=       97.3
 Qu       3303 E=    -888.478271093120     steps=  127 RMS= 0.61788E-02 Markov E=    -888.478353213437     t=       97.3
 Qu       3304 E=    -882.471548595592     steps=  148 RMS= 0.63758E-02 Markov E=    -888.478271093120     t=       97.3
 Qu       3305 E=    -878.033453042336     steps=  142 RMS= 0.68613E-02 Markov E=    -888.478271093120     t=       97.3
 Qu       3306 E=    -887.513620858599     steps=  202 RMS= 0.64101E-02 Markov E=    -888.478271093120     t=       97.3
 Qu       3307 E=    -876.770645817106     steps=  120 RMS= 0.50563E-02 Markov E=    -888.478271093120     t=       97.4
 Qu       3308 E=    -885.527373361650     steps=  119 RMS= 0.68517E-02 Markov E=    -888.478271093120     t=       97.4
 Qu       3309 E=    -884.226523564579     steps=  154 RMS= 0.65627E-02 Markov E=    -888.478271093120     t=       97.4
 Qu       3310 E=    -884.442460213215     steps=  166 RMS= 0.66521E-02 Markov E=    -888.478271093120     t=       97.4
 Qu       3311 E=    -882.647352877323     steps=  161 RMS= 0.67767E-02 Markov E=    -888.478271093120     t=       97.4
 Qu       3312 E=    -877.340825802117     steps=  214 RMS= 0.65298E-02 Markov E=    -888.478271093120     t=       97.5
 Qu       3313 E=    -887.041359809118     steps=  163 RMS= 0.69987E-02 Markov E=    -888.478271093120     t=       97.5
 Qu       3314 E=    -882.148557841606     steps=  131 RMS= 0.45389E-02 Markov E=    -888.478271093120     t=       97.5
 Qu       3315 E=    -846.966176656899     steps=  374 RMS= 0.69466E-02 Markov E=    -888.478271093120     t=       97.6
 Qu       3316 E=    -881.103501833298     steps=  113 RMS= 0.65877E-02 Markov E=    -888.478271093120     t=       97.6
 Qu       3317 E=    -882.912945844245     steps=  148 RMS= 0.50421E-02 Markov E=    -888.478271093120     t=       97.6
 Qu       3318 E=    -848.401495782815     steps=  277 RMS= 0.66668E-02 Markov E=    -888.478271093120     t=       97.6
 Qu       3319 E=    -880.186042811928     steps=  225 RMS= 0.56478E-02 Markov E=    -888.478271093120     t=       97.7
 Qu       3320 E=    -880.805383729752     steps=  222 RMS= 0.69276E-02 Markov E=    -888.478271093120     t=       97.7
 Qu       3321 E=    -887.366130165961     steps=  114 RMS= 0.66997E-02 Markov E=    -888.478271093120     t=       97.7
 Qu       3322 E=    -839.020844138527     steps=  322 RMS= 0.66380E-02 Markov E=    -887.366130165961     t=       97.8
 Qu       3323 E=    -849.692382722630     steps=  224 RMS= 0.63140E-02 Markov E=    -887.366130165961     t=       97.8
 Qu       3324 E=    -884.562150380624     steps=  121 RMS= 0.64816E-02 Markov E=    -887.366130165961     t=       97.8
 Qu       3325 E=    -888.159764294298     steps=  111 RMS= 0.46511E-02 Markov E=    -887.366130165961     t=       97.8
 Qu       3326 E=    -888.240969825400     steps=  115 RMS= 0.64033E-02 Markov E=    -888.159764294298     t=       97.9
 Qu       3327 E=    -885.136071751470     steps=  128 RMS= 0.60612E-02 Markov E=    -888.240969825400     t=       97.9
 Qu       3328 E=    -858.468880484692     steps=  237 RMS= 0.59963E-02 Markov E=    -888.240969825400     t=       97.9
 Qu       3329 E=    -885.783450511704     steps=  118 RMS= 0.63578E-02 Markov E=    -888.240969825400     t=       97.9
 Qu       3330 E=    -887.734908841535     steps=  148 RMS= 0.58352E-02 Markov E=    -888.240969825400     t=       97.9
 Qu       3331 E=    -876.690399732778     steps=  264 RMS= 0.56085E-02 Markov E=    -888.240969825400     t=       98.0
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -890.7301606        -890.6243264    
 Qu       3332 E=    -890.730160590174     steps=  109 RMS= 0.51280E-02 Markov E=    -888.240969825400     t=       98.0
 Qu       3333 E=    -888.132011423643     steps=  127 RMS= 0.63160E-02 Markov E=    -890.730160590174     t=       98.0
 Qu       3334 E=    -890.622916905838     steps=  128 RMS= 0.64509E-02 Markov E=    -890.730160590174     t=       98.0
 Qu       3335 E=    -890.655741842620     steps=  124 RMS= 0.64548E-02 Markov E=    -890.622916905838     t=       98.0
 Qu       3336 E=    -888.217112776191     steps=  169 RMS= 0.57975E-02 Markov E=    -890.655741842620     t=       98.1
 Qu       3337 E=    -883.405930587231     steps=  192 RMS= 0.65261E-02 Markov E=    -890.655741842620     t=       98.1
 Qu       3338 E=    -886.241992035115     steps=  132 RMS= 0.66625E-02 Markov E=    -890.655741842620     t=       98.1
 Qu       3339 E=    -859.182613103012     steps=  224 RMS= 0.66076E-02 Markov E=    -890.655741842620     t=       98.1
 Qu       3340 E=    -886.399088030381     steps=  105 RMS= 0.57030E-02 Markov E=    -890.655741842620     t=       98.2
 Qu       3341 E=    -871.741826318791     steps=  329 RMS= 0.54888E-02 Markov E=    -890.655741842620     t=       98.2
 Qu       3342 E=    -884.862902978274     steps=  128 RMS= 0.59836E-02 Markov E=    -890.655741842620     t=       98.2
 Qu       3343 E=    -849.693159213356     steps=  348 RMS= 0.54491E-02 Markov E=    -890.655741842620     t=       98.3
gsaveit> putting this minimum into the list at position       1 EREAL,QMIN=    -893.3101379        -890.7301606    
gsaveit> Target hit after            3344 quenches          732396 function calls.
gsaveit> Energy=     -893.3101378623 target=     -893.3102580000
 Qu       3344 E=    -893.310137862281     steps=  110 RMS= 0.62584E-02 Markov E=    -890.655741842620     t=       98.3
Acceptance ratio for run=     0.17174 Step=     0.43000 Angular step factor=     0.44000 T=     1.10000
1 3345 732396        98.2891380000
Tightly converging the SAVE lowest energy minima found
NOTE: these may NOT match the other output files - see below for a sorted list of Lowest minima
Final Quench      1 energy=    -893.3102579     steps=   43 RMS force=  0.9177414E-05 time=       98.30
After re-sorting, the lowest found minima are (lowest free energy subtracted if applicable):
Lowest Minimum      1 Energy=     -893.3102579    
time elapsed               98.3 seconds
Number of potential calls             732445
